Attachment_5_Davie_Ditch_Section_B_Price_Schedules.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
DAVIE DITCH PIPELINE PROJECT Federal contract opportunity
Solicitation number
140R4022R0029
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document contains three price schedules for the Davie Ditch Pipeline Project solicitation issued by the Department of the Interior Bureau of Reclamation. Price Schedule 1 includes line items for mobilization, removal of existing features, concrete, miscellaneous metalwork, refill material, earthwork, erosion protection, seeding, and pipe installation. Price Schedule 2 includes similar line items for a separate work area. Price Schedule 3 includes line items for concrete, miscellaneous metalwork, refill material, earthwork, erosion protection, seeding, and additional pipe installation. The price schedules provide a template for offerors to propose pricing for the supplies and services required for the project, but do not include any proposed dollar amounts. The solicitation seeks to rehabilitate sections of the Davie Ditch in Colorado through concrete structures, pipe installation, erosion control, and other construction activities.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedules Cover Sheet

Davie Ditch, Silt Project - Colorado

PRICE SCHEDULE 1

CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
1WBR 1452.232-81 & 01 71 13Mobilization and Preparatory WorkFor the lump sum of$ - 0$ - 0
202 41 07Removal and Disposal of Existing FeaturesFor the lump sum of$ - 0$ - 0
303 30 00Concrete for Structures25CY$ - 0$ - 0
405 50 00Miscellaneous Metalwork for StructuresFor the lump sum of$ - 0$ - 0
505 50 00Miscellaneous Metalwork for Manhole Tees2EA$ - 0$ - 0
631 23 02Refill for Unsuitable Material100CY$ - 0$ - 0
731 23 11Earthwork for Concrete StructuresFor the lump sum of$ - 0$ - 0
831 23 22Excavation of Unsuitable Material100CY$ - 0$ - 0
931 35 00Geocell Erosion Protection140SY$ - 0$ - 0
1031 35 006-inch Cobble30SY$ - 0$ - 0
1132 92 20Seeding Disturbed Areas4AC$ - 0$ - 0
1233 11 10Furnish and Install 36-inch Pipe2200LF$ - 0$ - 0

TOTAL FOR PRICE SCHEDULE 1 $ - 0

PRICE SCHEDULE 2

CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
1WBR 1452.232-81 & 01 71 13Mobilization and Preparatory WorkFor the lump sum of$ - 0$ - 0
202 41 07Removal and Disposal of Existing FeaturesFor the lump sum of$ - 0$ - 0
303 30 00Concrete for Structures25CY$ - 0$ - 0
405 50 00Miscellaneous Metalwork for StructuresFor the lump sum of$ - 0$ - 0
531 23 02Refill for Unsuitable Material40CY$ - 0$ - 0
631 23 11Earthwork for Concrete StructuresFor the lump sum of$ - 0$ - 0
731 23 22Excavation of Unsuitable Material40CY$ - 0$ - 0
831 35 006-inch Cobble5SY$ - 0$ - 0
932 92 20Seeding Disturbed Areas3AC$ - 0$ - 0
1033 11 10Furnish and Install 24-Inch Pipe900LF$ - 0$ - 0
1133 11 10Furnish and Install 4-inch Pipe200LF$ - 0$ - 0
1233 11 10Furnish and Install 10-inch Pipe50LF$ - 0$ - 0
1335 22 10Furnish and Install Canal GatesFor the lump sum of$ - 0$ - 0
TOTAL FOR PRICE SCHEDULE 2$ - 0
TOTAL FOR PRICE SCHEDULE 1 & 2$ - 0

PRICE SCHEDULE 3

CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
1WBR 1452.232-81 & 01 71 13Mobilization and Preparatory WorkFor the lump sum of$ - 0$ - 0
203 30 00Concrete for Structures25CY$ - 0$ - 0
305 50 00Miscellaneous Metalwork for StructuresFor the lump sum of$ - 0$ - 0
405 50 00Miscellaneous Metalwork for Manhole Tees2EA$ - 0$ - 0
531 23 02Refill for Unsuitable Material60CY$ - 0$ - 0
631 23 11Earthwork for Concrete StructuresFor the lump sum of$ - 0$ - 0
731 23 22Excavation of Unsuitable Material60CY$ - 0$ - 0
831 35 00Geocell Erosion Protection400SY$ - 0$ - 0
931 35 006-inch Cobble55SY$ - 0$ - 0
1032 92 20Seeding Disturbed Areas4AC$ - 0$ - 0
1133 11 00Furnish and Install 36-inch Pipe1270LF$ - 0$ - 0
TOTAL FOR PRICE SCHEDULE 3$ - 0
TOTAL FOR PRICE SCHEDULE 1 & 3$ - 0
TOTAL FOR PRICE SCHEDULE 1,2 & 3$ - 0