Attachment_6_Davie_Ditch_Questions___Answers_0002.pdf
PDF 47 KB Posted
- Attached to
- DAVIE DITCH PIPELINE PROJECT
- Solicitation number
- 140R4022R0029
About this file
This document contains questions and answers related to the Davie Ditch Pipeline Project solicitation. The project involves installing pipeline along an existing canal right-of-way. Acceptable pipe deflection is addressed, as is the location of approved borrow material for backfill. Onsite material may be used for backfill with the exception of select import material. The government will not delineate borrow area boundaries within the rights-of-way.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Davie Ditch Questions & Responses
Question 1: What is the maximum deflection allowed if gasketed pipe is used?
As stated in Section 33 11 10 3.01 F, for gasketed pipe the maximum deflection is 1 degree or the deflection recommended by the pipe manufacturer, whichever is less.
Question 2: Where are the areas in the project for approved borrow material?
As stated in Section 31 23 18 1.03 B, borrow material areas on the Davie Ditch Project are along the existing O&M Road adjacent to the canal within the ROW limits. Additionally, in Section 01 14 10 1.04 A, the ROW limits include four staging areas shown on Drawing No. 514-417-508 that may also be used for borrow material.
Question 3: Does embedment material need to be imported?
As stated in Section 31 23 22 2.03 B, obtain backfill material from required excavation and borrow from the O&M Road with the exception of select material. Screened onsite material is not acceptable as a substitute for select material.
Question 4: Will the government set the boundary limits of the borrow areas in the field?
The government will not set the boundary limits for ROW areas with borrow.