Attachment_5_Cost_Worksheet_Template.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
RFP Secondary #CV26-100 College Corps Event Management and Support
Solicitation number
0000039555
Issued by
California

About this file

This is a cost worksheet template for the RFP Secondary #CV26-100 College Corps Event Management and Support, issued by the State of California through California Volunteers. The RFP seeks a qualified contractor to provide comprehensive event management and support services for the College Corps Statewide Cohort Experience initiative, which includes planning and executing 16 large-scale statewide events over a two-year period, facilitating content planning processes, recruiting and training session facilitators, producing event materials and environmental branding, and providing overall project management and operational oversight. The maximum award amount is $1,488,074.00.

The cost worksheet template requires proposers to submit detailed cost breakdowns in three sections: a General Cost Summary Worksheet listing all labor costs by job title, hourly rates, and hours of service for both prime contractor and subcontractor personnel, as well as all indirect and direct costs; a Minimums and % Breakdown Worksheet documenting minimum total dollar amounts of $686,000 for Personnel, Staffing, and Subcontractor Costs, $188,000 for Indirect Event Costs, and $537,000 for Direct Event Costs, along with percentage breakdowns for all declared subcontractors; and a Cost by Task Worksheet breaking down costs by specific tasks and subtasks with hourly rates and hours for each key personnel member. Proposals must include a minimum of 3% Disabled Veteran Business Enterprise (DVBE) participation and 25% Small Business (SB) participation, with cost evaluation accounting for 60 points (at least 30% of total scoring) per Addendum 1 dated June 15, 2026. All formulas must reference cells, and subcontractor percentages declared in the Bidder Declaration form must match those shown in the worksheet calculations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

Attachment 5 Cost Worksheet Template must be submitted as the Excel file itself with your proposal.
GENERAL COST SUMMARY WORKSHEET
Proposer shall complete the General Cost Proposal Worksheet to list all associated cost such as labor cost for all key personnel (including subcontractors) who will be working on the project and include their job titles/classifications, hours of service, hourly rate, and total projected cost. Proposer shall list all direct and indirect costs including any miscellaneous costs in the General Cost Proposal Worksheet.
MINIMUMS AND % BREAKDOWN WORKSHEET
Proposer shall put in the minimum total dollar amounts for the Personnel, Staffing, and Subcontractor Costs (Minimum $686,000), Indirect Event Costs (Minimum $188,000), and Direct Event Costs (Minimum $537,000). Failure to reference cells in your formulas and not meeting all the minimum total dollars shall cause a proposal to be rejected. Please refer to page 10 to page 11 in Attachment 3 Draft Standard Agreement.

Proposer shall show the percentage math breakdown of all subcontractors declared. Please reference the cells used. Percentages shall be rounded to two decimal places. The Bidder Declaration form subcontractor percentage must match what is shown in Minimums and % Breakdown worksheet and your math breakdown.

COST BY TASK WORKSHEET
Proposer shall complete the Total Cost By Tasks to breakdown the cost by tasks, subtasks, rate per hour and hours for each key personnel (including subcontractors) who will be working on this project and include their job titles/classification.
No miscellaneous or direct/indirect cost (other than labor) should be listed on the Cost By Task.

&"-,Bold"INSTRUCTIONS&"-,Regular"

GENERAL COST SUMMARY

CONTRACTOR:CONTRACTOR NAME
GENERAL COST SUMMARY
PROJECT STAFF - LABOR COSTS
LABORHOURSRATETOTAL
rLoaded Rates (indirect costs included in the hourly rate)
rActual Rates (overhead listed below)
rOther (describe):
Job Title/Classification:Program Manager0@$0=$ - 0
Staff Assistant0@$0=$ - 0
Technician0@$0=$ - 0
Clerical0@$0=$ - 0
Sub-Totals:0@$0=$ - 0
SUBCONTRACTOR(S)
LABORHOURSRATETOTAL
rLoaded Rates (indirect costs included in the hourly rate)
rActual Rates (overhead listed below)
rOther (describe):
Job Title/Classification:0@0=$ - 0
OTHER
Other costs (describe)00$ - 0
Sub-Totals:0=$ - 0
INDIRECT COSTS (OVERHEAD AND FRINGE BENEFITS)
VARIABLERATETOTAL
Overhead Rate (general and administrative)0@0=$ - 0
Fringe Benefits0@0=$ - 0
Sub-Contractor Overhead Rate (general and administrative)0@0=$ - 0
SubContractor Fringe Benefits0@0=$ - 0
Sub-Totals:$ - 0
DIRECT COSTS (OTHER THAN LABOR)
Travel Costs0@0=$ - 0
Insert description(s) including number of trips and summary of costs.
Equipment and Supplies (Itemized)0@0=$ - 0
Insert description(s) including reason for product or service to be purchased.
Other Direct Costs (Itemized)0@0=$ - 0
Insert description(s) including item summary, and purpose/use
Sub-Contractor Travel Costs0@0=$ - 0
Insert description(s) including number of trips and summary of costs.
Sub-Contractor Equipment and Supplies (Itemized)0@0=$ - 0
Insert description(s) including reason for product or service to be purchased.
Sub-Contractor Other Direct Costs (Itemized)0@0=$ - 0
Insert description(s) including item summary, and purpose/use
Sub-Totals:$ - 0

TOTAL: $ - 0

GENERAL COST PROPOSAL WORKSHEET

Minimums and % Breakdown

Minimum Dollar Amounts as Outlined in the SOW
Project Staff - Labor CostsSubcontractor(s) LaborIndirect CostsDirect CostsTotal $
Personnel, Staffing, and Subcontractor Costs (Minimum $686,000)$ - 0
Indirect Event Costs (Minimum $188,000)$ - 0
Direct Event Costs (Minimum $537,000)$ - 0
Note: Please reference cells used in your formulas.
Subcontractor(s) Percentage Breakdown
Subcontractor(s) NameSubcontractor(s) LaborIndirect CostsDirect CostsTotal $Percentage
ERROR:#DIV/0!
$ - 0ERROR:#DIV/0!
$ - 0ERROR:#DIV/0!

Note: Please note if the subcontractor is a SB/DVBE. Reference cells used in your formulas. Otherwise, leave blank if no subcontractors.

Prime Percentage Breakdown
Prime Contractor NameProject Staff - Labor CostsIndirect CostsDirect CostsTotal $Percentage
$ - 0ERROR:#DIV/0!

Note: Please note if you, the prime, is a SB/DVBE. Reference cells used in your formulas.

COST BY TASK

CONTRACTOR COST SHEET
CONTRACTOR:CONTRACTOR NAME
NOTE: FOR CONSULTANT HOURLY RATES, USE FULLY BURDENED RATE. SEE GENERAL COST WORKSHEET
PRIME CONTRACTORSUBCONTRACTORSUBCONTRACTORTOTAL COST - ALL CONSULTANTS
NameSTAFF X (NAME)STAFF X (NAME)Total Cost ($$)STAFF X (NAME)STAFF X (NAME)Total Cost ($$)STAFF X (NAME)STAFF X (NAME)Total Cost ($$)
TitleJob Title/ClassificationJob Title/ClassificationJob Title/ClassificationJob Title/ClassificationJob Title/ClassificationJob Title/Classification
Rate Per Hour$0.00 per hour$0.00 per hour$0.00 per hour$0.00 per hour$0.00 per hour$0.00 per hour
HoursHoursHoursHoursHoursHours
FILL IN TASKS BELOW
ADD TASKS/SUBTASKS AS NECESSARY
TASK 1
Task 1.100$0.0000$0.0000$0.00
Task 1.200$0.0000$0.0000$0.00
Task 1.300$0.0000$0.0000$0.00
TOTAL ALL TASK 100$0.0000$0.0000$0.00$ - 0
TASK 2
Task 2.100$0.0000$0.0000$0.00
Task 2.200$0.0000$0.0000$0.00
TOTAL ALL TASK 200$ - 000$ - 000$ - 0$ - 0
TASK 3
Task 3.100$0.0000$0.0000$0.00
Task 3.200$0.0000$0.0000$0.00
Task 3.300$0.0000$0.0000$0.00
TOTAL ALL TASK 300$0.0000$0.0000$0.00$ - 0
TOTAL ALL TASKS
0.000.00$ - 0$ - 00.000.00$ - 0$ - 00.000.00$ - 0$ - 0

COST BY TASK WORKSHEET

File details come from the government source that posted it. Updated .