Attachment_5_Bid_Schedule.pdf
PDF 102 KB Posted
- Attached to
- CO-ROCKY MTN ARSNL NWR-TRAIL PAVING PH 2
- Solicitation number
- 140F0122R0081
About this file
This document contains an independent government cost estimate and solicitation for a federal construction contract opportunity. The cost estimate provides unit costs and totals for paving surfaces at Rocky Mountain Arsenal National Wildlife Refuge, including a base project to pave Lake Mary Trail and an optional addition for a picnic shelter and concrete work. The related solicitation is a request for proposal to award a firm-fixed price construction contract between $250,000 and $500,000 to complete the trail paving work. Interested small businesses have until August 4, 2022 to submit proposals via email to the contact at the U.S. Fish and Wildlife Service's Rocky Mountain Arsenal National Wildlife Refuge. Any requests for information or site visits regarding this 100% small business set-aside opportunity under NAICS code 238110 must be received by July 25, 2022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENT GOVERNMENT COST ESTIMATE
22‐028 ‐ Lake Mary Trail Paving
ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE
COMMERCE CITY, COLORADO
Unit Total QTY Unit Cost Cost
LAKE MARY TRAIL
1 1 LS
2 1 LS
3 1 LS
4 1 LS
5 42 CY
6 154 CY
Lake Mary Trail Total (BASE)
Unit Total QTY Unit Cost Cost
OPTION 1: PICNIC SHELTER AND TRAIL CONCRETE
1 1 LS
2 1 LS
3 Option 1 Gravel Shoulder 2 CY
4 18 CY
Option 1: Picnic Shelter and Trail Concrete
BASE PROJECT (BP) + OPTION
Construction Access Road
Project Description: Pave surfaces as described in the drawings and specifications at Rocky Mountain Arsenal NWR.
Furnish all labor, materials, and equipment to complete the following work in accordance with the attached specifications.
Option 1 Site preparation
Option 1 Concrete and Trail
Option 1 Mobilization/Demobilization, Bonding, Overhead, & Profit
Mobilization/Demobilization, Bonding, Overhead, & Profit Remove Wood Edging Site Preparation
Concrete and Trail Gravel Shoulder, Transitions, and Base
File details come from the government source that posted it. Updated .