Attachment_4_Submittals.pdf
PDF 71 KB Posted
- Attached to
- CO-ROCKY MTN ARSNL NWR-TRAIL PAVING PH 2
- Solicitation number
- 140F0122R0081
About this file
This document contains a projected submittal list and specifications for a federal construction contract opportunity with the Department of the Interior Fish and Wildlife Service. The contract is for the Lake Mary Trail Paving Phase 2 project located at the Rocky Mountain Arsenal National Wildlife Refuge. It involves paved concrete trail construction. The solicitation is set aside solely for small businesses and proposals are due no later than August 4th, 2022. The submittal list outlines requirements for items like schedules of values, construction plans, samples, test results, waste management documentation, and project closeout materials. It provides a template to indicate approval status for these submittals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET 1 OF 1
PROJECT NAME: LAKE MARY TRAIL PAVING - PHASE 2 ENGR. PROJECT NO.: 22-028
LOCATION: ROCKY MOUNTAIN ARSENAL NWR CONTRACT NO.:
CONTRACTOR:
Spec.
Section Number
Spec.
Paragraph No. Comments
011000 1.6.B.4 012900 1.2.A.1 013100 1.3 013200 1.4 013233 1.2 013300 1.3 014000 1.4 015000 1.3 017419 1.3 017419 1.4 017700 1.3 033000 1.2.B 033000 2.2 033000 2.7
321500.1 2.1 Gravel Surfacing
Waste records Closeout documents Concrete mix Steel Reinforcement Joint Filler Materials
Digital photos Submittal schedule Test agency information Erosion control plan Waste management plan
PROJECTED SUBMITTAL LIST
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
Schedule of Values Subcontract list and information Construction schedule
Construction Access Plan
A - Approved as Submitted.
B - Approved, Except as Noted. No Resubmission Required.
C - Approved, Except as Noted. Resubmission Required.
D - No Action Taken. See Comments. Resubmission Required.
E - disapproved. See Comments. Resubmission Required.