Attachment 4 - Warner Robins PWS.docx
DOCX document 43 KB Posted
- Attached to
- Material Handling Equipment Maintenance Services - DLA Disposition Services Warner Robins
- Solicitation number
- SP451025Q1009
- Issued by
-
Defense Logistics Agency
About this file
This Performance Work Statement (PWS) outlines requirements for Material Handling Equipment (MHE) maintenance services at DLA Disposition Services Warner Robins, Georgia. The contractor must provide preventive maintenance (PM) and corrective maintenance (CM) services for various pieces of MHE equipment, including performing inspections, repairs, annual testing, fork inspections per ANSI/ITSDF standards, and associated documentation. PM services must be completed within 10 business days of start, while CM services require assessment within 5 business days of notification and completion within 5 business days of parts receipt.
The contract is structured as a firm-fixed-price time and materials contract with one 12-month base period and two 12-month option periods, not to exceed three years total. It is set aside 100% for small businesses under NAICS code 811310 with a size standard of $12,500,000. The minimum contract value is $2,500 for the base period, with a maximum of 150% above the total estimated value. Quotes are due by February 19, 2025 at 3:00 PM EST, with questions due by February 3, 2025. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control necessary to perform the services, with work primarily performed on government premises during normal business hours.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 - Questions and Answers.docx | DOCX document | |
| Attachment 1 - Warner Robins Equipment.xlsx | XLSX spreadsheet | |
| Attachment 3 - Price Schedule MHE - Warner Robins.xlsx | XLSX spreadsheet | |
| Warner Robins Wage Determination 2015-4495.pdf | ||
| Attachment 6 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 5 - QASP MHE Maint Warner Robins.docx | DOCX document | |
| Attachment 2 - Warner Robins Location.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
DLA DISPOSITION SERVICES
WARNER ROBINS
MATERIAL HANDLING EQUIPMENT (MHE)
MAINTENANCE SERVICES
TABLE OF CONTENTS
1. INTRODUCTION
2. PREVENTIVE MAINTENANCE (PM)
3. CORRECTIVE MAINTENANCE (CM)
4. PLACE OF PERFORMANCE OF SERVICES
5. FEDERAL HOLIDAYS
6. BASE ACCESS & SECURITY
7. USG FURNISHED PROPERTY, MATERIALS, EQUIPMENT, AND SERVICES (GFP/M/E/S)
8. CONTRACTOR FURNISHED PROPERTY, MATERIALS, EQUIPMENT, AND SERVICES (CFP/M/E/S)
9. QUALITY ASSURANCE (QA)
10. SPILL RESPONSIBILITY
11. INVOICING INFORMATION
12. CONTRACT MINIMUM/MAXIMUM
1. INTRODUCTION:
a. Defense Logistics Agency Disposition Services (DLA DS) is a Major Subordinate Command (MSC) of the Defense Logistics Agency (DLA) with the responsibility of disposing and reutilizing the United States Government’s (USG) Department of Defense (DoD) excess and surplus property generated by the military services. This is accomplished through reutilization to other DoD activities, transfer to other Federal agencies, donation to authorized state and local organizations, sale to the public, or ultimate disposal through abandonment or destruction. The headquarters for DLA DS is in Battle Creek, Michigan.
b. DLA DS requires the use of various pieces of Material Handling Equipment (MHE) during daily operations in support of the military services. Preventive Maintenance (PM) and Corrective Maintenance (CM) services for MHE at our Warner Robins, Georgia, location is critical to ensure MHE is always operational. Without timely, efficient, and effective PM and CM services, DLA DS Warner Robins will be impacted to a point where we are unable to support our customers.
c. This is a firm fixed price time and materials contract which consists of a period of performance of one (1) 12-month base period and two (2) 12-month options. The total contract length shall not exceed three (3) years.
d. The equipment associated with this PWS is listed in Attachment 1 and is subject to change throughout the contract based on life cycle management of the equipment. Should the equipment change, Attachment 1 will be updated by the Contracting Officer (KO) and provided to the Contractor.
e. The Contractor shall provide all personnel, equipment, tools, electronic functional test equipment, materials, supervision, and quality control necessary to perform, PM, CM, Annual testing requirements, and other services as defined in this PWS.
f. Upon coordination of PM or CM services, the Contractor shall be required to report to the DLA DS Warner Robins main office to sign in prior to conducting any services under this contract.
g. Any reference to Contractor throughout this PWS refers to the Contractor or Subcontractor should one be utilized. The Contractor is solely responsible for all associated work to be completed In Accordance With (IAW) the PWS.
h. The contractor shall use lock-out/tag-out procedures as necessary for any piece of equipment receiving any type of service. The Contractor shall verify and confirm proper clearing procedures prior to returning operational control of the piece of equipment to the USG.
2. PREVENTIVE MAINTENANCE (PM):
The Contractor or Subcontractor shall:
a. When an annual Contract Line-Item Number (CLIN) is ordered, all lower-level maintenance checks and services will be performed in accordance with the Original Equipment Manufacturer (OEM) manual.
b. Ensure all PM services are completed IAW the Original Equipment Manufacturer (OEM) manual’s specifications. When pricing PM services on the Price Schedule, the Contractor shall include the costs of the following items, but are not limited to oil, grease/lubricants, Diesel Exhaust Fluid (DEF), antifreeze, battery fluid, oil, air, fuel filters, and fittings. Electric equipment shall include battery and charging station checks (see OEM manual).
c. Perform a fork inspection with each PM IAW the American National Standards Institute/Industrial Trucks Standards Development Foundation (ANSI/ITSDF). Standards can be located at the following link: www.itsdf.org.
d. Perform PM services on USG premises to minimize downtime.
e. Notify the Contracting Officers Representative (COR) two (2) business days prior to arrival with the date and time intended to arrive to perform PM services.
f. Start the PM service within 5 (five) business days of notification. Complete each PM service within ten (10) business days from the start of the PM service unless otherwise rescheduled and coordinated between the COR and the Contractor. If the service cannot be completed in this time frame the Contractor will submit a written justification on company letterhead with a timeline for completing the PM.
g. Perform PM service as appropriate on the associated charging unit when a CLIN for an Electric Forklift is ordered.
h. Affix a sticker or equivalent item to each piece of equipment upon completion of PM service. The sticker shall clearly indicate which PM service was completed, including the hour reading and the projected hours and date of the next required PM Service.
i. Write legibly, in permanent ink, e.g., paint marker, in a visible location the date in which filters were changed on the exterior of the filter. The permanent ink chosen must be able to withstand the weather, oil, dirt, and other debris to prevent smudging or otherwise removing the date or making it non-legible.
j. Remove all replaced parts and refuse.
k. Ensure removed hazardous materials including, but not limited to, used oil, antifreeze, lube oil, filters, etc., are packaged separately in UN rated DOT shippable containers that are compliant with 49 CFR 172.101, Federal, State, and Local laws. For any removed batteries, the Contractor will package the batteries IAW 49 CFR 173.159, Federal, State, and Local laws. All packaging, including UN rated DOT shippable containers, is the responsibility of the Contractor and will be at no additional cost to the Government.
l. The Contractor shall turn the containers with the waste material over to DLA COR for proper disposal.
m. Provide the COR a maintenance sheet showing the status of each item checked during the PM service within five (5) business days of completing each PM service.
n. Perform lug nut torquing for all equipment in conjunction with quarterly PM service. Lug nuts shall be torqued IAW OEM specifications. Mark studs with painted line from stud, to lug nut, to rim.
o. Deficiencies or required repair parts discovered during PM services, but not included in the scope of the PM service shall be considered CM and require a written estimate on company letterhead submitted to the COR within 5 (five) business days of the PM completion and prior to performing any repairs, IAW paragraph 3. below.
3. CORRECTIVE MAINTENANCE (CM):
The Contractor or Subcontractor shall:
a. Assess, inspect, test, and troubleshoot all CM service requests within five (5) business days of notification from the COR to determine the root cause of the deficiency. At that time the COR and Contractor shall agree upon a date and time of arrival to assess the equipment.
b. Provide an estimate for the repair, in writing, on Contractor letterhead or similar documents, to the COR within two (2) business days of the assessment IAW paragraph 3. a. The written estimate must contain the following information, at a minimum:
i. Description of the deficiency
ii. Parts necessary to correct the deficiency including the manufacturer and part number
iii. Indicate on the estimate whether the replacement part comes with a manufacturer warranty and the length of manufacturer warranty
iv. Cost of parts
v. Quantity of parts necessary
vi. Quantity of labor hours to repair the deficiency
vii. Cost of Shipping for parts, if applicable
viii. Cost of labor per hour
ix. Total estimated cost of repair
x. Estimated lead time for parts
xi. Expected date repairs will be complete
c. All OEM recommended replacement parts and materials may be examined when requested by the KO or COR prior to installation. No rebuilt parts shall be used.
d. All price estimates are subject to approval by the KO pending determination of available funding and if the repair is economical.
e. The USG will compensate the contractor for all parts and materials furnished and provided for on the written estimate in coordination of CM services unless the part or repair is due to the Contractor’s negligence. Parts or components damaged by the Contractor shall be repaired or replaced at the expense of the Contractor to the satisfaction of the COR.
f. Contractor’s shall not mark prices up on parts or materials Contractors receive from their suppliers. Upon request by the Agency, the Contractor shall provide their Supplier’s invoices for parts and materials being furnished to the Agency via the Contractors invoice in order for the Agency to ensure parts and materials are not being marked up.
g. All price estimates shall be valid for a period of 30 calendar days to ensure adequate time for determination and approval by the COR. Should the 30 calendar days be exceeded, the Contractor shall be required to submit a new estimate. In the event required replacement parts are expected to have long delays when ordering, the Contractor shall coordinate with the COR to obtain parts via other local sources to prevent delays and minimize delays.
h. Upon approval of the CM service estimates, the Contractor shall have five (5) business days to complete the necessary repairs to return the equipment to full operational status. The five (5) business days will begin upon receipt of all parts necessary to complete the CM. In the event the required repair will require longer than the five (5) business days, the Contractor shall notify the COR and KO in writing for approval. The notification shall include the justification for the additional time and an estimated date of completion.
i. The Contractor shall provide a weekly status update by email with official company letterhead to the COR. This update shall include details of pending or open repair actions, parts on order, estimated delivery dates, estimated completion dates, associated costs, and labor hours required for the repairs.
j. Perform a functional test (load test) IAW OEM specifications, OSHA 29 CFR, or upon completion of any work in which the load bearing structure was removed, replaced, or repaired.
k. Perform CM services on USG premises to the maximum extent possible.
l. Perform a Limited Technical Inspection (LTI) on new and/or transferred equipment per the CORs request. The LTI shall include but is not limited to a thorough inspection of the equipment such as engine, transmission, other major components, controls, mast, cables, chains, hoses, electrical, air, and hydraulic systems to determine the disposition of the equipment. The inspection shall also include a check of all fluids, fluids shall be topped off as necessary. The LTI shall be conducted using the time and materials rough order of magnitude CLINs on the price schedule.
m. Contractor will return to reassess equipment within three (3) business days if repairs do not correct the original deficiency at no additional cost to the USG.
n. Remove all replaced parts and refuse.
o. Ensure removed hazardous materials including, but not limited to, used oil, antifreeze, lube oil, filters, etc., are packaged separately in UN rated DOT shippable containers that are compliant with 49 CFR 172.101, Federal, State, and Local laws. For any removed batteries, the Contractor will package the batteries IAW 49 CFR 173.159, Federal, State, and Local laws. All packaging, including UN rated DOT shippable containers, is the responsibility of the Contractor and will be at no additional cost to the Government.
p. The Contractor shall turn the containers with the waste material over to DLA COR for proper disposal.
q. Provide appropriate conveyance and equipment to load, un-load, and transport the MHE to their maintenance facility in the event that services cannot be provided on USG premises.
r. Prior to removal of any MHE from USG premises, the Contractor shall sign a Department of Defense Form 1149, transferring liability of the equipment to the Contractor for the duration of the maintenance. Upon return of the MHE to USG premises, the DLA Form 1311 will be signed by the COR accepting the equipment repair.
4. PLACE OF PERFORMANCE OF SERVICES:
The Contractor shall provide services on USG premises at the DLA DS Warner Robins location, to the maximum extent possible during normal business hours, except on recognized US holidays or when the USG facility/installation is closed due to local or national emergencies or holidays, administrative closings, or similar USG-directed facility/installation closings. Performance shall be at the designated location specified by the COR for the respective DLA DS field location. The Contractor shall maintain an adequate work force for the performance of all tasks defined within this PWS when the USG facility/installation is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential. Adequate personnel is defined as a sufficient number of qualified personnel to successfully perform the duties required to be successful in accordance with the terms and conditions in the PWS, i.e., such as, but not limited to, meet the APL’s.
5. FEDERAL HOLIDAYS:
The Contractor is not required to provide services on the 11 federal holidays observed by DLA unless approved by the KO or COR. When one of the holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When the legal holiday falls on a Saturday, the preceding Friday is observed as the holiday. The following holidays are observed:
| New Year’s Day |
| January 1st |
| Martin Luther King’s Birthday |
| Third Monday in January |
| President’s Day |
| Third Monday in February |
| Memorial Day |
| Last Monday in May |
| Juneteenth |
| June 19th |
| Independence Day |
| July 4th |
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in October |
| Veteran’s Day |
| November 11th |
| Thanksgiving Day |
| Fourth Thursday in November |
| Christmas Day |
| December 25th |
6. BASE ACCESS & SECURITY:
a. The Contractor shall coordinate base installation access for all their employees. The Contractor shall be familiar with and comply with all Base Command policies regarding security considerations for all Contractor employees.
b. Unscheduled gate closures by the installation security personnel may occur at any time causing all personnel entering or exiting a closed installation to experience a delay; this cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by Contractor personnel are subject to search pursuant to applicable regulations. Any violation of applicable motor vehicle regulation may result in the termination of the Contractor employee’s installation driving privileges.
c. Contractor employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety, and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All Contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The Contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The USG reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of Contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
d. The Contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The Contractor and all associated employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation security personnel. The Contractor shall ensure compliance with all personal identity verification requirements as directed by DoD and/or local policy. Should the Force Protection Condition (FPCON) change, the USG may require changes in Contractor security matters or processes.
7. USG FURNISHED PROPERTY, EQUIPMENT AND SERVICES (GFP/E/S):
The USG will provide the GFP/E/S listed below solely for the purpose of performance under this contract:
a. Property: The USG will furnish the necessary workspace for the Contractor to perform services as outlined in this PWS.
b. Equipment: The USG will, at its sole discretion, and upon approval of the COR, provide MHE for the Contractor to assist with the performance of PM or CM of other MHE.
c. Utilities: All utilities in the facility will be available for the Contactors use in the performance of this contract. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
8. CONTRACTOR FURNISHED PROPERTY, MATERIALS, EQUIPMENT, AND SERVICES (CFP/M/E/S)
The Contractor shall provide the CFP/M/E/S listed below solely for the purpose of performance under this contract:
a. Provide all personal protective equipment for employees IAW OSHA guidance.
b. Provide all materials to clean up spills caused by their employees during the performance of PM or CM services.
c. Provide the KO and COR their employees Certified Forklift Technician (CFT) certifications to perform maintenance on the MHE.
d. Provide the KO and COR with a Point of Contact (POC) and phone number to coordinate and schedule CM and emergency repair services.
e. Provide services as listed throughout this PWS IAW OEM specifications.
9. QUALITY ASSURANCE (QA):
a. The USG will evaluate the Contractor’s performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the USG will do to ensure that the Contractor has performed in accordance with the performance standards as defined in the attached QASP. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
b. The Contractor shall develop, implement, and maintain a Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The QCP shall include procedures to identify, prevent, and ensure non-recurrence of defective services. The QCP is how the Contractor assures itself that its work complies with the requirements of the contract. At a minimum, the Contractor shall develop the QCP procedures that address the areas identified in the QASP. A final QCP shall be submitted to the COR no later than ten (10) business days after contract award. After acceptance of the QCP, the Contractor shall obtain the KO’s acceptance in writing of any proposed changes to its QCP.
10. SPILL RESPONSIBILITY:
a. The Contractor is solely responsible for all spills or leaks during the performance of this contract, which occur because of, or is contributed to by the actions of its agents, employees, or subcontractors. The Contractor shall clean up such spills or leaks to the satisfaction of the USG in a manner that complies with applicable Federal, state, and local laws and regulations. The clean-up shall be at no cost to the USG. The Contractor shall report all such spills or leaks, regardless of their quantity, to the COR and KO immediately upon discovery. A written follow-up report shall be submitted to the COR and KO not later than 24 hours after the initial telephonic report. The written report shall be in narrative form, and as a minimum shall include the following:
i. Description of item spilled (including identity, quantity).
ii. Whether amount spilled is EPA or state reportable, and if so, whether it was reported. Exact time and location of spill including a description of the area involved.
iii. Containment procedures initiated.
iv. Summary of any communications Contractor has with press or USG officials other than the KO.
v. Description of clean-up procedures employed or to be employed at the site including disposal location of spill residue.
vi. Description of item spilled (including identity, quantity).
11. INVOICING INFORMATION:
a. The Contractor shall invoice monthly through the Department of Defense Wide Area Workflow (WAWF) system. Invoices must be submitted through WAWF in accordance with DFARS 252.232-7003. Refer to https://wawf.eb.mil for additional information.
b. Hourly billing will be rounded up to the next whole hour.
12. CONTRACT MINIMUM/MAXIMUM:
This is a firm-fixed price indefinite delivery indefinite quantity (IDIQ) time and materials contract. The contract minimum shall be $2,500.00. The maximum shall be 150% of the estimated value of the contract. There is no contract minimum for any option period included in the contract.
File details come from the government source that posted it. Updated .