Attachment 4 TO Procedures -- SABER.pdf

PDF 130 KB Posted

Attached to
Solicitation for Simplified Acquisition of Base Engineering Requirements (SABER), Columbus AFB, MS
Solicitation number
FA3022-21-R-0001
Issued by

About this file

This document outlines procedures for issuing task orders (TOs) against the Simplified Acquisition of Base Engineering Requirements (SABER) contract at Columbus Air Force Base in Mississippi. The contractor shall receive task order proposal requests containing statements of work, material submittal registers, and up to 35% concept design drawings from the government. For each proposal request, the contractor must visit the work site within 3 days and may identify changes to the scope of work. The contractor will then prepare a lump sum cost proposal using RSMeans cost data within 14 days, including a statement of work, cost estimate report, documentation, proposed schedule, submittal log, construction plan, and safety plan. The government will review and negotiate the proposal. Task orders will be issued at prices in the RSMeans Facilities Construction Cost Data book multiplied by a coefficient factor. Non-prepriced items will be separately negotiated. Modifications to issued task orders can only be made by the contracting officer.

View the file

Other files

File Type Posted
Amendment - FA302221R00010003.pdf PDF
Attachment 2 Coefficient Itemization Calculator REVISED 5 Aug 2021.xlsx XLSX spreadsheet
Questions and Answers 5 Aug 2021.pdf PDF
Amendment FA302221R00010002.pdf PDF
Combined Drawings -B385 - 12-3-20.pdf PDF
As-Builts Drawings B385 1992.pdf PDF
Amendment - FA302221R00010001.pdf PDF
Attachment L6 Task Order Proposal Request.pdf PDF
Attachment L4 Past Performance Questionnaire.pdf PDF
Attachment L4 Past Performance Questionnaire.pdf PDF
Attachment L3 Draft DD1354 Renovate Bathroom and Install Showers.pdf PDF
Attachment 5 WD MS20210045 Building 2 Apr 21 (CAFB and Shuqualak).pdf PDF
Attachment L5 Wage Determination MS20210045.pdf PDF
Attachment 6 WD MS20210101 Highway 1 Jan 21 (CAFB).pdf PDF
Attachment 8 WD MS20210003 Heavy 1 Jan 21 (CAFB and Shuqualak).pdf PDF
Attachment L6 Task Order Proposal Request.pdf PDF
Attachment L2 OPP 1105418 AF Form 66.xlsx XLSX spreadsheet
Attachment 1 SGSOW.pdf PDF
Attachment 7 WD MS20200106 Highway 1 Jan 21 (Shuqualak).pdf PDF
Attachment 3 FA3022-21-R-0001 TEP -- SABER.xlsx XLSX spreadsheet
Attachment L1 Statement of Work OPP 1105418 Renovate Bathrooms and Install Showers B385.pdf PDF
Solicitation - FA302221R0001.pdf PDF
Attachment 2 Coefficient Itemization Calculator.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4 TO Procedures -- SABER

TASK ORDER (TO) PROCEDURES

Following are Contract Procedures for creating Task Orders:

a. The Government will provide to the Contractor a Task Order Proposal Request (TOPR) with a Statement of Work (SOW) describing the work to be performed, a material submittal register, and may include not more than 35% concept design drawings and other pertinent information. The Contractor will not be reimbursed for any Pre-TO costs including Cost Proposal preparation and attendance at negotiations or site visits.

b. The Contractor must be available to meet within 15 or 30 minutes of telephone contact in conformance with Saber General Statement of Work (SGSOW) Section 4(f) to receive TOPRs and other notifications.

c. Within 3 working days from receipt of an TOPR, or otherwise as by mutual assent between Government and Contractor, the Contractor must together with the CO and the CEPM visit the site identified by the TOPR. The intent of the site visit is to clarify for the Contractor the SOW and the existing conditions identified in the TOPR. At the Site Visit, the Government and Contractor may identify incorrect or omitted work items (or any others that remain inside the TO scope) and thereby note proposed changes to the SOW or Concept Drawings.

d. The RSMeans™ Facilities Construction Cost Data book or the RSMeans™ Online, most current versions will be the only sources of line item prices (excepting NPIs) included in the Cost Proposal. The estimation method must conform to SGSOW Section 6.

e. Based on the SGSOW, TO SOW and the Site Visit, the Contractor will develop a Lump Sum Cost Proposal using RSMeans™ Cost Data (see SGSOW section 6(b)). From the Site Visit date, the Contractor must submit a Cost Proposal within 14 calendar days or otherwise within a number of days established by mutual assent between Government and Contractor. Cost Proposal documentation must include adequate engineering and planning e.g. sketches or drawings, calculations, catalog cuts, specifications, etc. The Contractor’s Proposal must not duplicate costs included in the coefficient.

f. The Contractor’s Cost Proposal package for each TOPR will include the following as a minimum:

1) Statement of Work

2) Cost Estimate (RSMeans™ Online Construction Cost Estimator Detailed report and electronic file)

3) Documentation and calculations, (working drawings, specifications, etc.)

g. To validate equipment or material selection, component assembly, and cost estimation for the work (SOW), the Contractor must supply the following documents as a minimum with the Proposal:

1) Proposed Schedule

2) Submittal Log

3) Construction Plan

4) Safety and Traffic Control Plan

h. When it receives the Contractor’s Cost Proposal, the Government will review the Proposal. Within a reasonable time from receipt of the proposal, the Government will negotiate with the Contractor all line items, quantities, Non-Prepriced Items (NPIs), and performance periods.

i. The Contractor must use Non-Prepriced Items (NPIs) appropriately. NPIs will be negotiated before TO issuance. A NPI will be approved only if it is a more accurate cost of the work it represents.

j. The Contractor must complete and obtain Government approval of final Construction Documents in conformance with the SGSOW and TO SOW prior to issuance of NTP-Build.

k. If a TO needs to be modified, the Contractor must inform the CO. Modifications to TOs may only be issued by the CO. TO Modifications will use the coefficient in effect at the time the modification is issued.