Attachment 4 - Submittal Register 04-60(11-15).pdf
PDF 79 KB Posted
- Attached to
- Replace Electric Service at 55 MMIII Sites Federal contract opportunity
- Solicitation number
- FA461320R0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Site Visit Questions and Answers.pdf | ||
| Attachment - 6 Past Performance Survey.docx | DOCX document | |
| Solicitation Amendment FA461320R00090002.pdf | ||
| Solicitation Amendment FA461320R00090001.pdf | ||
| Attachment 3 - Wage Determinations.pdf | ||
| Attachment 5 - MFR UCNI Receipt and Control.pdf | ||
| Solicitation - FA461320R0009.pdf | ||
| Attachment 1 - Specifications (04-60(11-15)).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
Replace Electric Service at 55 MMIII Sites (321st)
01 20 00.00 20 SD-01 Preconstruction Submittals
1.2 GProgress Report (3065)
01 32 01.00 10 SD-01 Preconstruction Submittals
3.2 GProject Schedule
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GConstruction schedule
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 50 00 SD-01 Preconstruction Submittals
1.4 GConstruction site plan
01 78 00 SD-03 Product Data 1.2.1As-Built Record of Equipment and Materials SD-08 Manufacturer’s Instructions
1.3Preventative Maintenance 1.3Condition Monitoring (Predictive
Testing) 1.3Inspection
SD-10 Operation and Maintenance Data
1.5Operation and Maintenance Manuals
SD-11 Closeout Submittals
1.4 GCertification of EPA Designated
Items 26 05 00.00 40 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
26 05 00.00 40 1.5Material, Equipment, and Fixture Lists
3.1Conduits, Raceway sand Fittings 2.2Wire and Cable 2.3Splices and Connectors 2.4Switches
SD-03 Product Data 3.1Conduits, Raceway sand Fittings 2.2Wire and Cable 2.3Splices and Connectors 2.4Switches 1.4Spare Parts 1.5Certification
SD-06 Test Reports 3.5Continuity Test 3.5Phase-Rotation Tests 3.5Insulation Resistance Test
SD-08 Manufacturer’s Instructions 1.5Manufacturer's Instructions
26 20 00 SD-02 Shop Drawings
2.14 GWireways
3.1.5.1 GMarking strips
SD-03 Product Data
2.6 GSwitches
2.8 GEnclosed circuit breakers
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
26 20 00 3.4.2 G600-volt wiring test SD-07 Certificates
2.7 GFuses
26 36 00.00 10 SD-02 Shop Drawings
1.3.1Detail Drawings 2.1Equipment 3.1Installation
SD-03 Product Data 2.1Equipment
SD-06 Test Reports
2.6 GTesting
SD-07 Certificates 2.1Equipment 1.3.2Switching Equipment
SD-10 Operation and Maintenance Data
1.3.2 GSwitching Equipment
3.2 GInstructions
28 05 26.00 40 SD-01 Preconstruction Submittals 3.6.2Grounding Systems
SD-02 Shop Drawings 1.4Record Drawings
SD-03 Product Data 2.1Ground Rods 2.2Ground Wires 2.3Connectors and Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
28 05 26.00 40 3.5Bonding SD-06 Test Reports
3.5.1.1Welding 3.6.1Bond Resistance Test 3.6.2Ground Resistance Tests 3.6.3Ground Isolation Test 3.6.4Continuity Isolation Test
SD-08 Manufacturer’s Instructions 3.6.2Grounding Systems
33 71 02.00 20 SD-02 Shop Drawings
1.4.1 GPrecast underground structures
SD-03 Product Data
2.5 GMedium voltage cable
2.7 GMedium voltage cable joints
2.6 GMedium voltage cable
terminations
2.8 GLive end caps
SD-06 Test Reports
3.16.1 GField Acceptance Checks and
Tests 3.3Cable Installation Plan and
Procedure SD-07 Certificates
1.4.2 GCable splicer/terminator
1.4.3Cable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .