This is a Structure Demolition specification document (Section 024116) from the AIA MasterSpec Short Form template for construction contracts.
The specification establishes comprehensive requirements for the complete demolition of a building structure and removal of associated debris. The Contractor assumes ownership of all demolition waste unless otherwise specified, while the Owner retains ownership of any historic items, relics, antiques, or commemorative objects discovered during demolition. Key regulatory compliance requirements include adherence to EPA notification regulations, ANSI/ASSE A10.6 and NFPA 241 standards, and all state and federal hazardous materials regulations. The specification requires asbestos removal technicians to be certified by EPA-approved programs, and the Contractor must provide all required documentation for hazardous materials remediation and refrigerant removal per 40 CFR 82. All utilities serving the building must be located, identified, disconnected, and sealed or capped at least 24 inches below grade before demolition begins.
Significant operational constraints include providing 72 hours' notice before activities affecting adjacent buildings, maintaining access to walkways and exits for neighboring occupants, and prohibiting use of explosives. Demolition must proceed systematically from higher to lower levels, with debris removed via controlled descent methods. The Contractor must provide temporary shoring to prevent unexpected collapse, erect dustproof partitions to limit migration to occupied areas, and maintain fire watch during flame-cutting operations. Upon completion, all below-grade areas must be filled with government-supplied backfill and covered with six inches of topsoil. The Contractor must make efforts to recycle materials through EPA-approved facilities, dispose of remaining waste at EPA-approved construction and demolition landfills, and clean all adjacent structures to return them to pre-demolition condition. Predemolition conferences, protection measure submittals with drawings, and detailed activity schedules are required before work begins.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Copyright 2018 AIA MasterSpec Short Form 06/18
STRUCTURE DEMOLITION 024116 - 1
Copyright © 2019 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 024116 - STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of building and piled debris.
2. Disconnecting, capping or sealing, and abandoning in-place and removing site utilities.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.3 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at project site.
1.4 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, protection of the foundation, for environmental protection, and for dust control. Indicate proposed locations and construction of barriers.
1. Adjacent Buildings: Detail special measures proposed to protect adjacent tower and existing foundation to remain.
B. Schedule of building demolition activities with starting and ending dates for each activity.
1.5 CLOSEOUT SUBMITTALS
A. Inventory of items that have been removed and salvaged.
B. Bill of Lading for hazardous materials.
STRUCTURE DEMOLITION 024116 - 2
Copyright © 2019 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
1.6 QUALITY ASSURANCE
A. Asbestos Removal Technician Qualifications: Certified by EPA-approved certification program.
1.7 FIELD CONDITIONS
A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.
B. Conduct building demolition so operations of other buildings will not be disrupted.
1. Provide not less than 72 hours’ notice of activities that will affect operations of adjacent buildings.
2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.
a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction.
C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before building demolition, Owner will remove the following items:
a. None
D. Hazardous Materials: Contractor shall expect present in buildings and structures to be demolished..
1. Hazardous material should be expected.
2. The hazardous materials will be remediated in accordance with all state and federal regulations. The Contractor shall provide all required documentation to ensure the project is in compliance.
E. On-site storage or sale of removed items or materials is not permitted.
F. Arrange demolition schedule so as not to interfere with Owner's on-site operations or operations of adjacent structures/buildings.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
STRUCTURE DEMOLITION 024116 - 3
Copyright © 2019 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
C. Asbestos will be remediated in accordance with all state and federal regulations. The Contractor shall provide all required documentation to ensure the project is in compliance.
2.2 SOIL MATERIALS
A. Satisfactory Soils:
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting demolition operations.
B. Inventory and record the condition of items to be removed and salvaged.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
B. Salvaged Items: Comply with the following: NA
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Utilities to be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished.
1. Owner will arrange to shut off utilities when requested by Contractor. NA
2. Arrange to shut off utilities with utility companies. NA
3. Cut off pipe or conduit a minimum of 24 inches below grade. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing according to requirements of authorities having jurisdiction.
4. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing.
3.4 PROTECTION
A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.
B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction being demolished.
STRUCTURE DEMOLITION 024116 - 4
Copyright © 2019 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
C. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.
D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated.
Comply with requirements in Section 015000 "Temporary Facilities and Controls."
1. Protect adjacent buildings and facilities from damage due to demolition activities.
2. Protect existing site improvements, appurtenances, and landscaping to remain.
3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line of groups of trees to remain.
4. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
5. Provide protection to ensure safe passage of people around building demolition area and to and from occupied portions of adjacent buildings and structures.
6. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to building demolition operations.
7. Erect and maintain dustproof partitions and temporary enclosures to limit dust, noise, and dirt migration to occupied portions of adjacent buildings.
E. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.
3.5 DEMOLITION
A. General: Demolish indicated building completely. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.
2. Maintain fire watch during and for at least 1 hour after flame-cutting operations.
3. Maintain adequate ventilation when using cutting torches.
4. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.
2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.
C. Explosives: Use of explosives is not permitted.
STRUCTURE DEMOLITION 024116 - 5
Copyright © 2019 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.
D. Proceed with demolition of structural framing members systematically, from higher to lower level. Complete building demolition operations above each floor or tier before disturbing supporting members on the next lower level.
E. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
F. Salvage: NA
1. NA
G. Demolish foundation walls and other below-grade construction that are within footprint of existing construction.
1. The existing foundation is to remain in place for this project.
H. Existing Utilities: Demolish existing utilities and below-grade utility structures that are within 5 feet outside building footprint. Abandon utilities outside this area.
I. Below-Grade Areas: Completely fill below-grade areas and voids resulting from building demolition operations with government supplied backfill, place and lightly compact area to mimic surrounding ground.
J. Site Grading: Provide 6 inches of topsoil to completely cover backfilled area. Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes.
Provide a smooth transition between adjacent existing grades and new grades.
K. Promptly repair damage to adjacent buildings caused by demolition operations.
3.6 CLEANING
A. Remove items able to be recycled and dispose of them in an EPA-approved facility. Contractor is to make the effort to recycle as much material as possible.
B. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
C. Do not burn demolished materials.
D. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.
END OF SECTION 024116
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Demolition and removal of building and piled debris. |
| 2. Disconnecting, capping or sealing, and abandoning in-place and removing site utilities. |
| 1.2 MATERIALS OWNERSHIP |
| A. Unless otherwise indicated, demolition waste becomes property of Contractor. |
| B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain th... |
| 1. Carefully salvage in a manner to prevent damage and promptly return to Owner. |
| 1.3 PREINSTALLATION MEETINGS |
| A. Predemolition Conference: Conduct conference at project site. |
| 1.4 INFORMATIONAL SUBMITTALS |
| A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, protection of the foundation, for environmental protection, and for dust control. Indicate proposed locat... |
| 1. Adjacent Buildings: Detail special measures proposed to protect adjacent tower and existing foundation to remain. |
B. Schedule of building demolition activities with starting and ending dates for each activity.
| 1.5 CLOSEOUT SUBMITTALS |
| A. Inventory of items that have been removed and salvaged. |
| B. Bill of Lading for hazardous materials. |
| 1.6 QUALITY ASSURANCE |
| A. Asbestos Removal Technician Qualifications: Certified by EPA-approved certification program. |
| 1.7 FIELD CONDITIONS |
| A. Buildings to be demolished will be vacated and their use discontinued before start of the Work. |
| B. Conduct building demolition so operations of other buildings will not be disrupted. |
| 1. Provide not less than 72 hours’ notice of activities that will affect operations of adjacent buildings. |
| 2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings. |
| a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction. |
| C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical. |
| 1. Before building demolition, Owner will remove the following items: |
| a. None |
| D. Hazardous Materials: Contractor shall expect present in buildings and structures to be demolished.. |
| 1. Hazardous material should be expected. |
| 2. The hazardous materials will be remediated in accordance with all state and federal regulations. The Contractor shall provide all required documentation to ensure the project is in compliance. |
| E. On-site storage or sale of removed items or materials is not permitted. |
| F. Arrange demolition schedule so as not to interfere with Owner's on-site operations or operations of adjacent structures/buildings. |
| PART 2 - PRODUCTS |
| 2.1 PERFORMANCE REQUIREMENTS |
| A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. |
| B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241. |
| C. Asbestos will be remediated in accordance with all state and federal regulations. The Contractor shall provide all required documentation to ensure the project is in compliance. |
| 2.2 SOIL MATERIALS |
| A. Satisfactory Soils: |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Verify that utilities have been disconnected and capped before starting demolition operations. |
| B. Inventory and record the condition of items to be removed and salvaged. |
| 3.2 PREPARATION |
| A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction. |
| B. Salvaged Items: Comply with the following: NA |
| 3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS |
| A. Existing Utilities to be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished. |
| 1. Owner will arrange to shut off utilities when requested by Contractor. NA |
| 2. Arrange to shut off utilities with utility companies. NA |
| 3. Cut off pipe or conduit a minimum of 24 inches below grade. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing according to requirements of authorities having jurisdiction. |
| 4. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing. |
| 3.4 PROTECTION |
| A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings. |
| B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction being demolished. |
| C. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and ... |
| D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated. Comply with requirements in Section 015000 "Temporary Faciliti... |
| 1. Protect adjacent buildings and facilities from damage due to demolition activities. |
| 2. Protect existing site improvements, appurtenances, and landscaping to remain. |
| 3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line of groups of trees to remain. |
| 4. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain. |
| 5. Provide protection to ensure safe passage of people around building demolition area and to and from occupied portions of adjacent buildings and structures. |
| 6. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to building demolition operations. |
| 7. Erect and maintain dustproof partitions and temporary enclosures to limit dust, noise, and dirt migration to occupied portions of adjacent buildings. |
E. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.
| 3.5 DEMOLITION |
| A. General: Demolish indicated building completely. Use methods required to complete the Work within limitations of governing regulations and as follows: |
| 1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations. |
| 2. Maintain fire watch during and for at least 1 hour after flame-cutting operations. |
| 3. Maintain adequate ventilation when using cutting torches. |
| 4. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. |
| B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities. |
| 1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed trafficways if required by auth... |
| 2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. |
| C. Explosives: Use of explosives is not permitted. |
| D. Proceed with demolition of structural framing members systematically, from higher to lower level. Complete building demolition operations above each floor or tier before disturbing supporting members on the next lower level. |
| E. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debris to grade level in a controlled descent. |
| F. Salvage: NA |
| 1. NA |
| G. Demolish foundation walls and other below-grade construction that are within footprint of existing construction. |
| 1. The existing foundation is to remain in place for this project. |
| H. Existing Utilities: Demolish existing utilities and below-grade utility structures that are within 5 feet outside building footprint. Abandon utilities outside this area. |
| I. Below-Grade Areas: Completely fill below-grade areas and voids resulting from building demolition operations with government supplied backfill, place and lightly compact area to mimic surrounding ground. |
| J. Site Grading: Provide 6 inches of topsoil to completely cover backfilled area. Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing gra... |
| K. Promptly repair damage to adjacent buildings caused by demolition operations. |
| 3.6 CLEANING |
| A. Remove items able to be recycled and dispose of them in an EPA-approved facility. Contractor is to make the effort to recycle as much material as possible. |
| B. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction. |
| C. Do not burn demolished materials. |
| D. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began. |
File details come from the government source that posted it. Updated .