This document is a solicitation for a firm-fixed-price contract to provide graving dock keel blocks and related services to the Naval Sea Systems Command. The contractor will build 83 new fixed concrete keel blocks, remove and dispose of timbers from 80 existing blocks, install new timbers on all blocks, and dispose of 50 old concrete blocks. The contractor must pick up any incorrect materials delivered without cost to the government. The required delivery date is 20 May 2022. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses. Offerors must submit proposals by 8 April 2022 to be considered for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N5523622R0013_Amend 0001 signed.pdf | ||
| S-1 - Request for Specification Clarification.docx | DOCX document | |
| Attachment 5 Navy DBIDS Force Protection List.pdf | ||
| Attachment 3 - NAVSEA Provisions and Clauses.docx | DOCX document | |
| Attachment 2 - Evaluation Factors for Award.docx | DOCX document | |
| Attachment 1 Instr Cond and Notices to Offerors.docx | DOCX document | |
| Exhibit A - Pricing Workbook.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
31 March 2022
1. SCOPE:
1.1 TITLE: GRAVING DOCK BLOCKS – NEW KEEL BLOCKS
AND DISPOSE OF OLD BLOCKS
1.2 IDENTIFICATION: UIC: 55262 ICN/KEP OP: 38GD0LOE /S01
SHIP/COMMAND: SWRMC GRAVING DOCK C-980
1.3 LOCATION: SHIP/COMMAND ADDRESS: SWRMC CODE 980
3755 BRINSER ST. SUITE 1
SAN DIEGO CA, 91236
1.4 POC: GRAVING DOCK Division Head:
Annie Tipton 619-572-5010
2. REFERENCES:
2.1 NAVSEA Drawing No. 845-5500948 Rev. No. B
3. JOB DESCRIPTION:
3.1 Vendor will build/manufacture, deliver, and install new 83 EA fixed concrete keel blocks in accordance with paragraph 2.1 and 4.1. Vendor will install new White Oak or Red Oak Timbers (top and bottom) on these new 83 EA fixed concrete keel blocks. Note: There are 6 each total timbers per keel block in reference to paragraph 2.1 (List of Material; See notes 6 & 7).
3.2 Vendor will remove and dispose all existing White Oak Timbers (top and bottom) on existing 80 EA fixed concrete keel blocks. Vendor will install new White Oak or Red Oak Timbers (top and bottom) on these existing 80 EA fixed concrete keel blocks. Note: There are 6 each total timbers per keel block.
3.3 Vendor will dispose existing 50 EA old fixed concrete keel blocks with their timbers (300 EA timbers) as per vendor’s disposition.
4. FEATURES REQUIRED:
4.1 Material List
NOMENCLATURE PART NUMBER NSN UNIT OF
ISSUE QTY
NEW FIXED CONCRETE
KEEL BLOCKS 42” X 48” X
50”
N/A N/A EA 83
NEW WHITE OR RED OAK
TIMBERS FOR THE NEW 83
EA FIXED CONCRETE KEEL
BLOCKS (6 EA TIMBERS PER
KEEL BLOCK)
N/A N/A EA 498
NEW WHITE OR RED OAK
TIMBERS FOR 80 EA
EXISTING FIXED
CONCRETE KEEL BLOCKS
(6 EA TIMBERS PER KEEL
BLOCK)
N/A N/A EA 480
5. NOTES:
5.1 Vendor shall pick-up and replaces any incorrect materials or materials with any discrepancies that were delivered to SWRMC EPF Graving Dock Code 980 WITHOUT additional cost to the Government.
5.2 Vendor shall submit a MOD RDD extension request as soon as possible if known source vendor CANNOT meet RDD WITHOUT additional cost to the Government.
6. DELIVERY LOCATION:
6.1 Southwest Regional Maintenance Center (SWRMC)
Graving Dock #1 Code 980 3755 Brinser Street Suite 1, San Diego CA 92136
7. PERIOD OF PERFORMANCE/REQUIRED DELIVERY DATES:
7.1 Required Delivery Date: 20 MAY 2022
File details come from the government source that posted it. Updated .