Attachment 3 - NAVSEA Provisions and Clauses.docx
DOCX document 36 KB Posted
- Attached to
- NBSD Graving Dock Keel Blocks Federal contract opportunity
- Solicitation number
- N5523622R0013
About this file
This is a combined synopsis/solicitation for a firm-fixed-price contract to provide new fixed concrete keel blocks, remove and dispose of existing timbers, install new timbers, and dispose of old concrete blocks at the Naval Sea Systems Command. The contractor shall build 83 new concrete blocks, remove timbers from 80 existing blocks, install timbers on the new blocks and 80 existing blocks, and dispose of 50 old concrete blocks and their timbers. Quotes are due by April 8, 2022 and award will be to a service-disabled veteran-owned small business. The work must be completed by May 20, 2022 and will take place at the destination location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N5523622R0013_Amend 0001 signed.pdf | ||
| Attachment 5 Navy DBIDS Force Protection List.pdf | ||
| Attachment 4 - Statement of Work.pdf | ||
| Attachment 2 - Evaluation Factors for Award.docx | DOCX document | |
| Attachment 1 Instr Cond and Notices to Offerors.docx | DOCX document | |
| Exhibit A - Pricing Workbook.xlsx | XLSX spreadsheet | |
| S-1 - Request for Specification Clarification.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
D-211-H005 IDENTIFICATION MARKING OF PARTS – ALTERNATE I (NAVSEA) (OCT 2018)
(a) For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.
(2) Parts manufactured to Government specifications shall be marked as follows:
(i) Electrical Parts - that is, all parts in electrical equipment and electrical parts when used in equipment which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(2) dated 22 June 2018, or, where MIL-STD-1285D(2) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.
(ii) Electronic Parts - that is, all parts in electronic equipment and electronic parts when used in equipment which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK-454B dated 15 April 2007 with Notice 1 dated 12 December 2012. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.
(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with MIL-STD-130N(1).
(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
(End of Text)
D-247-H005 MARKING AND PACKING LIST(S) – ALTERNATE I (NAVSEA) (OCT 2018)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with MIL-STD-129R with Change 1 dated 24 May 2018.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment in accordance with the above cited MIL-STD. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.
Where DD Form 1348-1 or DD Form 1348-1A is applicable and an assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number. Refer to the above cited MIL-STD for marking of assorted (related-unrelated) items.
(End of text)
E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (NAVSEA) (OCT 2018)
Item(s) 0001 - 0004 - Inspection and acceptance shall be made at destination by a representative of the Government.
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.
F-242-H001 CONTRACTOR NOTICE REGARDING LATE DELIVERY (NAVSEA) (OCT 2018)
In the event the contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the contractor shall immediately notify, in writing, the Contracting Officer and the cognizant Contract Administration Services Office, if assigned. The notice shall give the pertinent details; however, such notice shall not constitute a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.
F-247-H004 RESTRICTIONS FOR SHIPPING TO MILITARY AIR OR WATER PORT/ TERMINAL (NAVSEA) (OCT 2018)
The Contractor shall not ship directly to a military air or water port/terminal without authorization by the cognizant Contract Administration Office.
G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT OFFICE (NAVSEA) (JUN 2018)
(a) The following table of payment office allocation methods applies to the extent indicated.
For Government Use Only
| Contract/Order Payment Clause |
| Type of Payment Request |
| Supply |
| Service |
| Construction |
| Payment Office |
Allocation Method
52.212-4 (Alt I), Contract Terms and Conditions—Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts
| Cost Voucher |
| X |
| X |
| N/A |
| Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested. |
| 52.232-1, Payments |
| Navy Shipbuilding Invoice (Fixed Price) |
| X |
| N/A |
| N/A |
| Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year. |
52.232-1, Payments;
52.232-2, Payments under Fixed-Price Research and Development Contracts;
52.232-3, Payments under Personal Services Contracts;
52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers
| Invoice |
| X |
| X |
| N/A |
| Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested. |
| 52.232-5, Payments Under Fixed-Price Construction Contracts |
| Construction Payment Invoice |
| N/A |
| N/A |
| X |
| Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year. |
| 52.232-16, Progress Payments |
| Progress Payment* |
| X |
| X |
| N/A |
| Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3. |
52.232-29, Terms for Financing of Purchases of Commercial Items;
52.232-30, Installment Payments for Commercial Items
| Commercial Item Financing* |
| X |
| X |
| N/A |
| Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2). |
| 52.232-32, Performance-Based Payments |
| Performance-Based Payments* |
| X |
| X |
| N/A |
| Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2). |
| 252.232-7002, Progress Payments for Foreign Military Sales Acquisitions |
| Progress Payment* |
| X |
| X |
| N/A |
| Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer. |
*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).
(b) This procurement contains the following contract type(s):
| Item |
| Type* |
| 0001-0004 |
| Firm-Fixed Price |
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
(End of text)
G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES (NAVSEA) (OCT 2018)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Name: Paul von Franzke Address: 3755 Brinser Street, Ste 1 San Diego, CA 92136 Phone: (619) 556-4855 E-mail: paul.vonfranzke@navy.mil
(ii) The Contract Specialist (CS) is:
Name: Sonsiree Lagunas Address: 3755 Brinser Street, Ste 1 San Diego, CA 92136 Phone: (619) 556-9389 E-mail: sonsiree.lagunas@navy.mil
(iii) The Administrative Contracting Officer (ACO) is: (TO BE DETERMINED AT CONTRACT AWARD) Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx];
E-mail: [ * ]
(d) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.
The Technical Point of Contact (TPOC) is:
Name: Annie Tipton Address: SWRMC Code 980 3755 Brinser Street Suite #1 San Diego, CA 92136 Phone: (619) 572-5010 E-mail: annie.tipton@navy.mil
The Technical Point of Contact (TPOC) is:
Name: CDR Anthony D. Macaluso Address: SWRMC Code 900 3755 Brinser Street Suite #1 San Diego CA 92136 Phone: (619) 548-0469 E-mail: anthony.d.macaluso1@navy.mil
(e) The Ombudsman will review complaints from the contractors and ensure that all contractors are afforded a fair opportunity to be considered, consistent with the procedures in the contract.
The Ombudsman is:
Name: Mr. Derek Sopp Address: 3755 Brinser Street, Ste 1 San Diego, CA 92136 Phone: (619) 556-1156 E-mail: derek.sopp@navy.mil
(f) The Contractor's point of contact for performance under this contract is:
Name: [ * ] Title: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx]; FAX: (Area Code) xxx- [xxxx] E-mail: [ * ]
[ * ] To be completed at contract award
G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021)
(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the Southwest Regional Maintenance Center (SWRMC). All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor’s expense with no cost or liability to the U.S. Government.
(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company’s established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.
(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.
G-242-W001 CONTRACT ADMINISTRATION FUNCTIONS (NAVSEA) (OCT 2018)
(a) In accordance with FAR 42.302(a) all functions listed are delegated to the ACO except the following items to be retained by the PCO:
1) Perform preaward survey.
2) Process and execute novation and change of name agreements under FAR Subpart 42.12.
(b) In accordance with FAR 42.302(b), the following additional functions are delegated to the ACO:
1) Negotiate or negotiate and execute supplemental agreements incorporating contractor proposals resulting from change orders issued under the Changes clause. Before completing negotiations, coordinate any delivery schedule change with the contracting office.
2) Negotiate or negotiate and execute supplemental agreements changing contract delivery schedules.
3) Negotiate or negotiate and execute supplemental agreements providing for the deobligation of unexpended dollar balances considered excess to known contract requirements.
4) Issue amended shipping instructions and, when necessary, negotiate and execute supplemental agreements incorporating contractor proposals resulting from these instructions.
5) Negotiate changes to interim billing prices.
6) Issue change orders and negotiate and execute resulting supplemental agreements under contracts for ship construction, conversion, and repair.
7) Execute supplemental agreements on firm-fixed-price supply contracts to reduce required line item quantities and deobligate excess funds when notified by the contractor of an inconsequential delivery shortage, and it is determined that such action is in the best interests of the Government, notwithstanding the default provisions of the contract. Such action will be taken only upon the written request of the contractor and, in no event, shall the total downward contract price adjustment resulting from an inconsequential delivery shortage exceed $250.00 or 5 percent of the contract price, whichever is less.
8) Execute supplemental agreements to permit a change in place of inspection at origin specified in firm fixed- price supply contracts awarded to non manufacturers, as deemed necessary to protect the Government’s interests.
9) Prepare evaluations of contractor performance in accordance with subpart 42.15.
L-209-H009 NOTIFICATION OF POTENTIAL ORGANIZATIONAL CONFLICT(S) OF INTEREST (NAVSEA) (DEC 2018)
(a) Offerors are reminded that certain existing contractual arrangements may preclude, restrict or limit participation, in whole or in part, as either a subcontractor or as a prime contractor under this competitive procurement. Of primary concern are those contractual arrangements in which the Offeror, if the awardee of the contract under this solicitation, would provide support to the Southwest Regional Maintenance Center, or related laboratories (if applicable), in support of operation of the office or any of its programs. General guidance may be found in FAR 9.505; however, this guidance is not all inclusive. The Offeror's attention is directed to the "Organizational Conflict of Interest" (or similar) text which may be contained in current or completed contract(s) which prohibits the prime or subcontractor from providing certain supplies or services to the Government as described above during the period of the current "support" contract(s) or for a period after completion of the "support" contract(s). Notwithstanding the existence or non-existence of an Organizational Conflict of Interest (OCI) clause or similar text in current or completed contract(s), the offeror shall comply with FAR 9.5 and identify whether an OCI exists or there is potential for an OCI and not rely solely on the presence of an OCI text
(b) If a potential conflict of interest exists at any tier, each potential prime offeror shall notify the Contracting Officer within 14 days of the date of this solicitation. The Offeror shall provide: (1) the contract number and name and phone number of the Contracting Officer for the contract which gives rise to a potential organizational conflict of interest; (2) a copy of the requirement; (3) the statement of work (or technical instruction) from the existing contract; (4) a brief description of the type of work to be performed by each subcontractor under the competitive procurement; and (5) any additional information the Contracting Officer should consider in making a determination of whether a conflict of interest exists. The Government may independently verify the information received from the offeror. Notwithstanding the above, the Government reserves the right to determine whether a conflict of interest exists based on any information received from any source.
(c) The Government will notify an offeror of any conflict of interest within 14 days of receipt of all required information. Those offerors deemed to have a conflict of interest may be ineligible for award under this solicitation. An Offeror’s failure to provide the information in a timely manner does not waive the Government's rights to make a conflict of interest determination. The offeror is notified that if it expends time and money on proposal preparation, such expenditure is at its own risk that the Government will not determine that an organizational conflict of interest exists.
(d) Any potential prime contractor which proposes a subcontractor later determined to have a conflict of interest and deemed ineligible to participate in the current competition, may not be granted the opportunity to revise its proposal to remove the ineligible subcontractor. The Government reserves the right to determine which offerors remain in the competitive range through the normal source selection process.
(e) If the offeror determines that a potential organizational conflict of interest does not exist at any tier, the offeror shall include a statement to that effect in its response to this solicitation.
(End of provision)