Attachment 4 Statement of Work Coeur d Alene Nursery Exterior Painting.docx
DOCX document 2 MB Posted
- Attached to
- Coeur d Alene Nursery Painting
- Solicitation number
- 1240LU23Q0047
About this file
This statement of work outlines requirements for exterior painting services at the Coeur d'Alene Nursery. The USDA Forest Service seeks a contractor to repaint 13 buildings and two residential houses totaling approximately 123,000 square feet of wall space at the nursery site in Coeur d'Alene, Idaho. The contractor must scrape and power wash surfaces, caulk as needed, remove fixtures, apply primer to bare wood, and paint with a premium-grade acrylic latex system matching existing colors. Two coats are required on painted surfaces, with one oil-based primer coat and two finish coats on new wood. The contractor must dispose of waste daily and complete work by October 31, 2023. The key personnel on site must be authorized to represent the contractor and sign notices. Security check-in is required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LU23Q0047 Amendment 3.pdf | ||
| 1240LU23Q0047 Amendment 2.pdf | ||
| 1240LU23Q0047 Amendment 1.pdf | ||
| Attachment 2 Building Exterior Photos.docx | DOCX document | |
| Attachment_1_Nursery Buildings Map.pdf | ||
| Attachment 5 wage determinations.txt | TXT text file | |
| Attachment 6 Experience Questionaire.pdf | ||
| Attachment 3 Painting supplemental specifications.docx | DOCX document | |
| 1240LU23Q0047 CdA Nursery painting.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 3 |
| 5.0 Deliverables / Schedule | 3 |
| 6.0 Travel | 4 |
| 7.0 Contractor’s Key Personnel | 4 |
| 8.0 Security Requirements | 4 |
| 9.0 Data Rights | 4 |
| 10.0 Section 508 – Electronic and Information Technology Standards | 4 |
| Attachment | 4 |
Project Coeur d’Alene Nursery Exterior Painting
General Information
1.0 Scope of Work
This project will involve supplying the paint, labor, and other materials to repaint 13 buildings and two residential houses at the Coeur d’Alene Nursery site. The buildings that are wood sided construction are either cedar shake siding or T-11 panels. Two building have concrete block walls. The resident houses are cedar shake siding. The buildings were last painted in 2011 with an exterior grade latex paint matching the existing building colors.
North half of Nursery Complex
South half of Nursery Complex
2.0 Background
The following buildings will be painted in this project.
| Building Name and Number |
| Est. wall Sq Ft. |
| Last Painted |
| QA Lab #2024 |
| 622 |
| 2011 |
| Main Office #2027 |
| 34,386 |
| 2011 |
| Nursery Shop #2115 |
| 2837 |
| 2011 |
| Seed Extractory complex #2120 |
| 21681 |
| 2011 |
| Irrigator’s Workshop #2139 |
| 2932 |
| 2011 |
| Pesticide Building #2240 |
| 1618 |
| 2011 |
| Garage Shop $2320 |
| 3358 |
| 2011 |
| Carpenter’s Shed #2325 |
| 1664 |
| 2011 |
| Gas-Oil House #2508 |
| 207 |
| 2011 |
| Greenhouse Office #2813 |
| 1720 |
| 2011 |
| North Well House # 2830 |
| 438 |
| 2011 |
| East Well House #2812 |
| 117 |
| 2011 |
| Sand House #2610 |
| 1120 |
| 2011 |
| Nurseryman Dwelling #1015 |
| 3306 |
| 2011 |
| Caretaker’s Dwelling #1014 |
| 2760 |
| 2011 |
Contractor Requirements
3.0 Technical Requirements / Tasks
Surface Preparation - Work to be performed includes the following.
· Scraping any loose material off the surface to be painted
· Power washing the building surface to prepare a clean surface for the application of paint.
· Caulk any gaps around windows, doors, flashing, and surface trim.
· Remove all hardware, light fixtures and similar items that are not to be finished.
· Mask items that cannot be removed.
· Apply an appropriate primer coat to any bare wood after surface prep that is compatible with the two coat paint system used for the finish coat.
· Complete all surface preparations prior to applying paint to a building to avoid surface prep adjacent to newly painted surfaces.
· Remove all trash including rags, empty caulk tubes and paint chips from the site and dispose of properly.
Paint Application
· Use airless spray equipment with the proper orifice size for the material being applied and the finish required.
· Apply each coat to provide hiding equivalent to brush coats. Do not double back with spray equipment to build up a film thickness of two coats in one pass.
· On Concrete block and flat wood siding a roller may be used to evenly distribute paint from the airless application. Brushes or roller shall be used on surfaces that an airless system can’t be used.
Paint Products
· Provide materials that comply with MPI standards indicated and listed in its MPI Approved Products list.
· Paint shall be a premium grade 2-coat system, self-priming with a stain blocker, resistant to blistering and peeling.
· Provide products by one of the following manufacturers that meet the requirements: Benjamin Moore, Glidden Professional, PPG Architectural, Sherwin-Williams Company.
· Buildings were last painted with Sherman-Williams Weathercald 100% Acrylic Latex paint.
· Paint should match the existing color and sheen of the buildings.
· Existing painted surfaces shall be painted with 2 coats of Acrylic Latex paint.
· New unpainted wood shall be painted with one coat of an oil-based primer followed by two coats of an Acrylic Latex paint. The primer product used should be compatible with the finish coats.
Cleaning
· At the end of each work day, remove empty pails, rags and trash generated from daily work and dispose of it in a legal manner. Do not dump waste materials, including thinners or solvents on site.
3.0 Government Furnished
The Coeur d’Alene Nursery is open from 0730 to 4:00 PM M-F except all federal Holidays.
5.0 Deliverables / Schedule
From Award/ Notice to Proceed to 10/31/2023
6.0 Travel
N/A
7.0 Contractor’s Key Personnel
Contractor’s key personnel on site must have authority to represent the contractor on all matters pertaining to the contract and be able to sign notices delivered by the COR.
8.0 Security Requirements
Contractor and employees must check in with the COR and sign in at the front office when on site.
9.0 Data Rights
N/A
10.0 Section 508 – Electronic and Information Technology Standards N/A
Attachment Map of Building locations.