This is a Statement of Work (SOW) for repainting a B-52 Static Display Air Vehicle (SDAV) at Barksdale Air Force Base, dated April 27, 2026. The contractor must restore the aircraft's paint scheme and markings to its original operational appearance while ensuring long-term preservation. The work is to be performed at the Weapons Load Training Facility and encompasses three primary phases: SDAV Inspection Process, SDAV Preparation Process, and Painting Process.
The inspection phase requires the contractor to stage the aircraft, conduct meticulous examination for corrosion and structural damage, document all findings, inspect bird-proofing and safety systems, and identify necessary maintenance and water intrusion prevention measures. The preparation phase involves cleaning per T.O. 1-1-691 with high-pressure water washers, complete scuff sanding using no coarser than 120-grit abrasive paper, approved structural repairs per applicable technical orders, sealant replacement, and final cleaning. The painting phase specifies application of MIL-PFR-23377K primer (Kromate-based) and MIL-PRF-85285E topcoat using rollers and brushes to achieve 4.0-4.5 mils wet thickness, with all insignia and markings replicated to exact size, color, and location using Federal Standard 595 colors. The contractor must provide all personnel, supervision, tools, materials, and equipment while complying with USAF Technical Orders, Barksdale AFB environmental requirements, and federal, state, county, and local regulations. Government Furnished Property includes non-powered equipment, escort services, guards, and aircraft stands. Deliverables include the repainted aircraft and complete documentation of inspections, repairs, and materials used. The contractor shall provide the performance schedule, and acceptance criteria require satisfaction of the Weapons Load Training Facility with quality assurance inspection by Weapons and Crew chief personnel, proper waste disposal, and accurate documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) - B-52 Aircraft Repainting (Date 27 April 2026)
1. Introduction This Statement of Work (SOW) outlines the requirements for repainting a B-52 aircraft for training. The Contractor will provide all personnel, supervision, tools, materials, and equipment necessary to complete the project in accordance with this SOW, applicable USAF Technical Orders (T.O.s), Barksdale AFB Environmental Requirements and all relevant Federal, State, County, and local regulations, including safety, OSHA, DEQ, DOT, and EPA rules, and the Barksdale AFB Hazardous Waste Program Manager.
2. Objective The objective of this project is to restore the paint scheme and markings of the specified B- 52 Static Display Air Vehicle (SDAV) to its original operational appearance for the current operational period. The restoration will ensure the long-term preservation of the aircraft.
3. Scope of Work The Contractor shall perform the following tasks:
3.1. SDAV Inspection Process:
• Stage the SDAV for cleaning and painting.
• Conduct a meticulous inspection to detect any corrosion or damage that could compromise the structural integrity of the aircraft.
• Work Stoppage: Work Stoppage will occur during said time a compromise is discovered in structural integrity, corrosion, or any damage thereof.
• Identify and document all observed corrosion, damage, cracks, breaks, holes, bulges, dents, damaged or broken fasteners and receptacles, and loose or missing rivets.
• Inspect aircraft bird-proofing in all vents, nozzles, wheel wells, cowlings, cowl flap areas, intakes, air scoops, and exhausts to determine replacement needs.
• Inspect all landing gear and control surfaces to ensure they are locked and safe.
• Identify any necessary maintenance to be performed to ensure the SDAV is restored to its original manufacturer or operational appearance.
• Identify and seal any openings on doors, panels, emergency openings, and window edges to prevent water intrusion.
• Ensure the SDAV is free from corrosion and properly sealed to prevent further deterioration.
3.2. SDAV Preparation Process:
FA460826QS018
Attachment 4
• Cleaning:
o Prepare and clean the aircraft following T.O. 1-1-691, Cleaning and Corrosion Prevention and Control, Aerospace and Non-Aerospace Equipment.
o Install traps under the aircraft to contain paint and chips for proper disposal.
o Collect paint chips and debris daily (or prior to rain events) and place them into drums for proper disposal.
o Replace all bird proofing and remove any remnants of nests or wildlife.
o Treat all corroded areas in accordance with T.O. 1-1-691.
o Thoroughly clean the exterior of the aircraft fuselage using a high-pressure washer with water only, removing all dirt, debris, carbon, and contaminants.
o Free all fuselage, wing, and empennage drain holes from obstruction during washing.
• Sanding:
o Perform a complete scuff sand of the entire exterior surface of the aircraft using abrasive paper no coarser than 120 grit.
o Remove all oxidized paint and featheredge all flaked paint in accordance with T.O. 1-1-8, Application and Removal of Organic Coating, Aerospace and Non-Aerospace Equipment.
• Repairs & Repair Approvals:
o Perform approved repairs during the preparation process in accordance with T.O.l-lA-1, T.O. l-lA-8, and T.O. 1-1-690.
o Ensure the fabrication of any replacement parts appear exactly as the original parts.
o Repair Approvals: Quality assurance and the 702 MXS commander will be in-charge of all repairs that need to be made to aircraft in staging area.
• Sealing:
o Remove and replace any defective sealant and correct sealant damage resulting from the scuff sanding operation.
o Seal all exposed areas prior to cleaning and painting.
• Securing:
o Secure all landing gear and control surface moving parts.
• Final Cleaning:
o Perform a second cleaning to thoroughly remove all contaminants for an exceptionally clean surface prior to painting.
3.3. Painting Process:
• In-process Verification:
o Primer: MIL-PFR-23377K (Kromate Based) o Topcoat: MIL-PRF-85285E (36118)
FA460826QS018
• Paint Application:
o The goal of the painting process is to encapsulate the aircraft to prevent corrosion.
o Paint the aircraft to its current paint scheme with all current insignia and markings.
o Take precautionary measures to prevent paint and paint removal waste from contaminating air, water, or soil, and protect surrounding vegetation and construction from debris.
o Treat all bare metal areas against corrosion prior to painting.
o Use Federal Standard 595 colors to exactly match all colors in accordance with T.O. 1-1-4, Exterior Finishes, Insignia and Markings, Applicable to USAF Aircraft.
o Apply all primers and paints using rollers and brushes in accordance with T.O. 1-1-8 to achieve a smooth finish comparable to a spray application.
o Apply paint to a wet mil thickness of 4.0-4.5 mils.
• Markings and Insignia:
o Paint all insignia and markings (e.g., stars and bars, tail number) to the same size, color, and location as they are currently.
o Apply stenciling to the proper location and size.
• Protection:
o Mask off and protect unpainted surfaces (e.g., landing, taxi, navigation, and position lights) from paint overrun.
• Additional Painting:
o Paint engine inlet covers, tires, and landing gear.
o Paint supports structures in their original color.
• Replication:
o Replicate SDAV paint, markings, images, letters, numbers, and colors exactly.
4. Deliverables
• A repainted B-52 SDAV with a restored paint scheme and markings.
• Documentation of all inspection findings, repairs, and materials used.
• Properly disposed of waste materials, including paint chips, debris, and used sealant.
5. Applicable Documents
• T.O. 1-1-691, Cleaning and Corrosion Prevention and Control, Aerospace and Non- Aerospace Equipment.
• T.O. l-lA-1, General Manual for Aircraft Structural Repairs.
• T.O. l-lA-8, Aircraft Structural Hardware.
• T.O. 1-1-690, General Advance Composite Repair Processes Manual.
FA460826QS018
• T.O. 1-1-8, Application and Removal of Organic Coating, Aerospace and Non- Aerospace Equipment.
• T.O. 1-1-4, Exterior Finishes, Insignia and Markings, Applicable to USAF Aircraft.
• Federal Standard 595.
• Barksdale AFB Environmental Requirements.
• All relevant Federal, State, County, and local regulations.
6. Acceptance Criteria The completed project will be considered acceptable when:
• The B-52 SDAV is repainted to the satisfaction of the Weapons Load Training Facility.
• Quality Assurance: Quality assurance Weapons and Crew chief personnel will be in charge of inspection of standards.
• All repairs are completed in accordance with applicable T.O.s and industry’s best practices.
• All waste materials are properly disposed of in accordance with environmental regulations.
• All documentation is complete and accurate.
7. Period of Performance The period of performance for this project the contractor will provide the schedule.
8. Place of Performance The work shall be performed at the Weapons Load Training Facility.
9. Government Furnished Property (GFP) / Support 702 MXS will provide all non-powered age, Escort to and from staging area for said painting project, guards and follow-me vehicles to and from the staging area, B-2, B-4, and B-5 stands, and wing ropes for aircraft to move about the surface safely.
10. Contractor Responsibilities
• Provide all personnel, supervision, tools, materials, and equipment.
• Comply with all applicable regulations and safety requirements.
• Maintain accurate records of all work performed.
• Coordinate with the Weapons Load Training Facility as needed.
• Ensure all personnel are properly trained and qualified.
11. Environmental Compliance There will be a plan set for contractors to be able to dispose of all hazardous material. Will work with Tool Crib on policies for collection, daily handling, storage and final disposal to include lead and chromate-based paint chips, solvents, and old sealant.
FA460826QS018
End of Statement of Work (SOW)
FA460826QS018
File details come from the government source that posted it. Updated .