Attachment 4- SOW R2 1-7-26.docx
DOCX document 19 KB Posted
- Attached to
- 648-23-100 CON Fire Alarm to Voice Federal contract opportunity
- Solicitation number
- 648-23-100
About this file
This is a Statement of Work (SOW) for upgrading the fire alarm system at the VA Portland Healthcare System's Vancouver campus located at 1601 E Fourth Plain Boulevard, Vancouver, Washington. The project involves modernizing the existing Edwards EST-3 Fire Alarm system, installed in 2003, to an EST-4 or equivalent system with voice capabilities. The scope encompasses site investigation, construction activities, labor, materials, equipment, programming, training, commissioning, and scheduling across nearly all campus buildings. Key deliverables include completing the campus fiber loop in a duct bank, installing main control equipment at Building 3 boiler plant with integrated Network Voice Command and FireWorks Station Computer, adding new Fire Alarm Control Panels (FACPs) in existing and new locations, upgrading annunciators and panels, installing new power supply circuits and strobe power control equipment, implementing campus-wide synchronization, and providing programming and commissioning services. The primary objective is to upgrade the existing temporal horn notification system to a speaker-based voice control system incorporating Emergency Voice/Alarm Communication (EVAC) capabilities, with new smoke detection installed as required by NFPA 72-2022.
The contractor must ensure no concurrent operation of old and new fire alarm systems in the same area, with all occupant notification handled by a single system at any given time. Non-operational redundant initiating devices must be covered and clearly labeled "Not in Service." The construction schedule must prioritize transitioning all fire alarm notification to the new EST-4 system or equivalent as early as possible, with subsequent installations and demolition proceeding according to individual building and smoke compartment requirements. The period of performance is one year from the date of Notice to Proceed. The solicitation permits equivalent systems to the EST-4 standard provided they deliver a fully functional integrated solution meeting all requirements without performance degradation and maintain a working fire alarm system throughout construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06- Amendment 0004 - 36C26026R0034.pdf | ||
| Atmendment 3 -27 13 23 - COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING - Amended 2-18-2026.pdf | ||
| Amendment 3-Vancouver Fire Life Safety.pdf | ||
| AMENDMENT 00003 36C26026R0034 648-23-100 CON SITE VISIT QUESTIONS AND ANSWERS.pdf | ||
| 36C26026R0034 AMENDMENT 2 EXTEND PROPOSAL DUE DATE.pdf | ||
| 648-23-100 SIGN IN SHEET PAGE 2.pdf | ||
| 36C26026R0034 0001 PAGE 2.pdf | ||
| 648-23-100 SIGN IN SHEET PAGE 1.pdf | ||
| 36C26026R0034 AMENDMENT 1.pdf | ||
| Attachment 6- VAAR 852.219-75.docx | DOCX document | |
| Attachment 5- Wage determination 1-27-26.pdf | ||
| Attachment 1- Upgrade_Vancouver_Fire_Alarm Drawings.pdf | ||
| Attachment 3- 648-23-100 Past Performance Questionnaire.pdf | ||
| Attachment 2- Upgrade_Vancouver_Fire_Alarm Specifications.zip | ZIP file | |
| 36C26026R0034_3.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
648-23-100 Upgrade Vancouver Fire Alarm to Voice Scope of work
This project will require site investigation, construction activities, labor, materials, equipment, programming, training, commissioning and scheduling to Upgrade Vancouver Fire Alarm to Voice at the VA Portland Healthcare System, Vancouver campus. The specific detailed information and requirements are shown on the drawings, specifications and as follows:
This project will upgrade the fire alarm system on the Vancouver campus to modernize to a voice system. Edwards EST-3 Fire Alarm system was installed in 2003.
· Project Location: 1601 E Fourth Plain Blvd, Vancouver, Washington
· Building(s): This project involves almost every building on the campus. (See drawings for specific buildings and locations)
· Upgrade Vancouver Campus fire alarm system to EST-4* or equivalent and add voice.
· Including, but not limited to;
· Completing the campus fiber loop in a duct bank
· Test network before integration
· Main control equipment installation
· Main control equipment shall be located at building 3 boiler plant
· FACP with integrated Network Voice Command
· FireWorks* Station Computer, UL listed, with a built-in network card
· Two monitors and printer
· Cellular digital alarm transmitter
· New FACPs in existing and non-existing locations.
· New building annunciator panels
· New power supply circuits, local disconnects, and distribution panels
· New strobe power control equipment
· Installation in Bldg. T1819
· Upgrading all existing annunciators and panels
· Sequential migration of buildings
· Campus-wide synchronization
· Programming
· Commissiong
· The primary objective of this project is to upgrade the existing temporal horn notification system to a speaker-based voice control system that incorporates Emergency Voice/Alarm Communication (EVAC) capabilities. For buildings that currently lack fire alarm coverage, new initiating devices have been designed for installation as required. Smoke detection will also be placed as required by NFPA 72-2022 10.4.5 (See drawings and Specifications for further detail)
· each fire alarm control unit,
· each notification appliance circuit power extender,
· the supervising station transmitting equipment.
· At no point during construction will both the old and new fire alarm systems simultaneously drive notification in the same area, and that all occupant notification will be handled by a single system at any given time.
· There shall be no instances where notification is handled concurrently by the existing and new systems during construction.
· Redundant initiating devices in areas where both systems are installed must have the non-operational devices covered and clearly labeled as "Not in Service."
· The construction schedule must prioritize transitioning all fire alarm notification to the new EST4* system or equivalent system as early as possible. Subsequent system installations, demolition, and patching activities will proceed in a manner, aligned with the specific requirements of individual buildings and smoke compartments.
· For specific safety, infection prevention, and security measures and deliverables, see drawings and specifications.
· See drawings cover page for project working hours.
· Period of Performance: 1 year from date of Notice to Proceed
· This is not a brand name only requirement an equivalent is acceptable. Any proposed "equal" must result in a complete fully operational fire alarm system throughout construction and at project completion. If the contractor elects to propose another system, it must deliver a fully functional integrated solution that satisfies all requirements without degradation of performance. It is the intent of this project to maintain a working fire alarm system throughout construction.