This document is a Scope of Work specification summary prepared by the State of Colorado, Design & Construction Management division, for the modernization of Freight Elevator #3 located at the State Office Building, 201 East Colfax Avenue, Denver, Colorado (Project 2024-070M23). The project involves the complete modernization of a single freight elevator with a capacity of 2,500 pounds and speed of 200 feet per minute, servicing six primary stops and one rear alley opening. The scope encompasses replacement of the existing Otis geared hoist machine with a new Permanent Magnet AC gearless hoist machine, installation of new programmable microprocessor controllers compliant with A17.1-2019 standards, and expansion of the existing machine room accessway to accommodate new equipment. Additional work includes installation of new power-operated front bi-parting freight doors with sequential operation controls, a new Variable Voltage Variable Frequency Drive with governor and tail sheave, new hoistway entrances, updated signal fixtures with digital indicators, and comprehensive fire safety equipment including addressable smoke initiating devices and three fire panel interface modules in accordance with ASME A17.1-2019 and NFPA 73 standards.
The specification summary indicates this is preliminary documentation outlining general work scope, with the notation that any discrepancies between the summary and the full technical specifications should be resolved in favor of the detailed technical specifications. The document specifies equipment preferences, including a new Hollister-Whitney governor or preapproved equal and Innovation Industries PB-35 hall push button stations or approved equivalents. The project requires installation of new aluminum diamond plate flooring, pit ladder, stop switches, and buffers, along with cleaning, painting, and refurbishment of existing components including the freight elevator cab, safeties, and guide shoe inserts. No pricing information, contract terms, bid deadlines, or award dates are included in this specification summary document.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Colorado - State Office Building 201 East Colfax Avenue Freight Elevator #3 - Modernization Specifications Denver, CO 80203 State of Colorado - Design & Construction Management - Project: 2024-070M23 Freight Elevator #3
FREIGHT ELEVATOR #3 - Scope of Work Summary and Schedule of Equipment (1)
Description:
Quantity 1
Speed/Capacity 200 FPM / 2,500 Lbs.
Stops/Openings 6 Front & 1 Rear (Alley) (B, 1, Alley, 2, 3, 4, 5)
Operation Simplex Operation with Sequential Closing Freight Doors
Machine Room:
Machine Remove existing Otis Geared Hoist Machine and install new Permanent Magnet AC Gearless Hoist Machine with Deflector Sheave in Machine Room, Bed Plate with Main and Auxiliary Brake Assembly. Install new Hoist Cables.
Machine Room Access Expand existing 36” X 33” Machine Room accessway and install a new “Wire Fence/Gate and lock.
Controller Provide new programmable microprocessor controllers. A17.1- 2019 compliant.
Power Conversion New Variable Voltage Variable Frequency Drive
Governor and Tail Sheave
Provide new Hollister-Whitney or “preapproved equal.”
Governor Rope Provide new Governor Rope.
Hoistway:
Overhead Sheave Install Overhead Deflector Sheave in the Machine Room.
Hoistway Entrances, and Bi-Parting Door Panels
Provide new "Front" Power Operated Car Gate and Power Operated Hoistway Bi-Parting Freight Doors Panels with New Car and Hall Pushbutton Stations and Sequential Operation Controls. Provide means for Hoistway Access at each floor. (Lock Box and Pull Chain) Rear/Alley Car Gate and Bi-Parting Hoistway Door shall remain Manual Operation.
Freight Power Door Equip.
Install new Door Unlocking Devices, Interlocks, and Pull Straps.
Hoistway Door Tracks, Motors, and Guide Shoes.
Install new Freight Door Tracks, Sheaves, Chains, Motors, Interlocks, Guide Shoes, and Hoistway "Pull Chain" Access devices, and Retiring Cams..
Car & Cwt Guide Shoes Install new Inserts in existing Guide Shoes.
Wiring/Duct Provide all new wiring and duct.
Counterweight Add/Remove weight for properly balance
Car:
Car Gate & Counterweight
Install new Power Front Car Gates and Manual Rear Car Gate with Cwt assembly. “Chip” Hoistway Wall as needed to accommodate at least a 13” Pocket for Power Door
State of Colorado - State Office Building 201 East Colfax Avenue Freight Elevator #3 - Modernization Specifications Denver, CO 80203 State of Colorado - Design & Construction Management - Project: 2024-070M23 Freight Elevator #3
Retiring Cams Install new Retiring Cams for Front and Rear Door operation.
Car Sling, Platform, Safeties, and Cab
Install new "Safety Operated Switch." (SOS) Clean and rretain the existing Car Sling, and Safeties. Replace worn Safeties. Clean, lubricate, adjust, and paint.
Cab: Clean and Paint the existing Freight Elevator Cab and Ceiling. Flooring:
Install new Aluminum “Diamond Plate” flooring.
Top of Car Railing Provide per current code
Pit:
Pit Ladder Provide per current code.
Stop Switch Provide new in compliance with code.
Buffers Refurbish as needed. Clean and paint.
Signal Fixtures
Car Operating Panel Provide new Main COP w/ digital PI. A17.1 2019 compliant.
Hall Call Fixtures Provide new Innovation Industries PB-35 or approved equal Hall Push Button Stations w/ digital PI, Door Open/Close Buttons, and Top/Bottom Hoistway Access
Door Close Signal (Buzzer and Strobe Light)
Provide “Buzzer” and “Flashing Light” on Cab to alarm after a predetermined length of time when Door/Gate is closing or left open.
Hoistway Access Sws. Provide Top and Bottom Hoistway Access per code
Emergency Fire Fighters’ Service Phase
I & II
In accordance with ASME A17.1 – 2019 and NFPA 73 and ther City/County of Denver Fire Department, install new addressable Smoke or other form of “Initiating Device/s” in each Elevator Lobby, Elevator Machine Room, Pit and Hoistway. Install three (3) Fire Panel and Elevator Control Panel “Interface Modules” within 3 feet of the new Elevator Control Panel. 1.) Primary Floor Recall 2.) Alternate Floor Recall 3.) Machine Room Flashing Hat
(1) Summary is just a brief outline to give general scope of work. If a discrepancy exists between the summary and body of the technical specifications, or if an item is not included in the summary, the body of the technical specifications should take precedence.