| ATTACHMENT 4 |
| SEED PROJECT PRICE SCHEDULE: |
POINT OF CONTACT:
COMPANY NAME:
PHONE:
EMAIL:
UEI:
Your firm shall submit prices for all items to be considered responsive. All prices shall be fully burdened and all inclusive (i.e., Overhead, G&A, Profit, Bonds, etc.)
Although the schedule below contains formulas to calculate "Extended Price" and "Total All Tasks", it is the Contractors responsibility to ensure accuracy of all Totals.
The quantities listed below require field verification, including those with a quantity of zero prior to performing work of the Seed Task Order.
| TYPE II - WILDLIFE EXCLUSION FENCE FOR GRAZING | |||||
| ITEM # | DESCRIPTION | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 10 | Post 6" dia, 10' treated | EA | 1722 | $ - 0 | |
| 20 | Woven wire fencing 79" high x 12' | LF | 13760 | $ - 0 | |
| 30 | Gates-custom steel pipe gate 72" high x 12' | EA | 20 | $ - 0 | |
| 40 | Smooth wire (includes staples) for electrical conductor | LF | 27520 | $ - 0 | |
| 50 | Single H brace (includes cross wire and fasteners) | EA | 50 | $ - 0 | |
| 60 | Double H brace (pair) for gates and corners (includes cross wire and fasteners) | EA | 50 | $ - 0 | |
| 70 | Double H brace line end (includes cross wire and fasteners) | EA | 2 | $ - 0 | |
| 80 | Double H brace angle 135 – 175 (includes cross wire and fasteners) | EA | 6 | $ - 0 | |
| 90 | Double H brace (pair, separated) for angle 135 or less (includes cross wire and fasteners) | EA | 11 | $ - 0 | |
| 100 | Outrigger – double side | LF | 1891 | $ - 0 | |
| TYPE IV - SINGLE RAIL LIGHT DUTY FENCE FOR RESIDENTIAL AREA | |||||
| ITEM # | DESCRIPTION | UNIT | UNIT PRICE | EXTENDED PRICE | |
| 110 | Post | EA | 111 | $ - 0 | |
| 120 | Rail (includes fasteners) | EA | 5 | $ - 0 | |
| 130 | Wire mesh, 4 feet high (includes staples) | LF | 0 | $ - 0 | |
| 140 | Post and rail gate | EA | 0 | $ - 0 |
| SEED PROJECT PRICE SCHEDULE (CONTINUED): | |||||
| TYPE V - SINGLE RAIL HEAVY DUTY FENCE | |||||
| ITEM # | DESCRIPTION | UNIT | UNIT PRICE | EXTENDED PRICE | |
| 150 | Post | EA | 0 | $ - 0 | |
| 160 | Rail (includes fasteners) | EA | 0 | $ - 0 | |
| RESIDENTIAL SCREENING FENCE | |||||
| ITEM # | DESCRIPTION | UNIT | UNIT PRICE | EXTENDED PRICE | |
| 170 | Posts | EA | 10 | $ - 0 | |
| 180 | Panel (includes rails, slats and all fasteners for a 10-foot panel) | EA | 9 | $ - 0 | |
| 190 | Gate, 3 feet wide | EA | 0 | $ - 0 | |
| REMOVE AND DISPOSE OF FENCING | |||||
| ITEM # | DESCRIPTION | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 200 | Remove and transport fence post up to 8-feet in length and 6-inches in diameter, disposal in park | Per Lot (20 poles) | 0 | $ - 0 | |
| 210 | Remove and transport fence post up to 8-feet in length and 6-inches in diameter, disposal outside of park | Per Lot (20 poles) | 0 | $ - 0 | |
| 220 | Remove and transport fence rail up to 16-feet in length and 5-inches in diameter, disposal in park | Per Lot (20 rails) | 0 | $ - 0 | |
| 230 | Remove and transport fence rail up to 16-feet in length and 5-inches in diameter, disposal outside of park | Per Lot (20 rails) | 0 | $ - 0 | |
| 240 | Remove and transport wire, disposal in park (1000 LF roll) | Per 1000 LF | 0 | $ - 0 | |
| 250 | Remove and transport residential screening fence or gate, disposal in park | 10-FT Length | 0 | $ - 0 | |
| 260 | Remove and transport residential screening fence or gate, disposal outside of park | 10-FT Length | 0 | $ - 0 | |
| 270 | Mobilzation / Demobilization | LS | 1 | $ - 0 | |
| TOTAL ALL TASKS: | $ - 0 |
| Construction Wage Rates apply to this project. Current prevailing Wage Determinations at the time of issuance of this solicitation are included as attachments. In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of this solicitation, it is the offeror’s responsibility to insure the most recent determination is used in preparing the proposal. An amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment. If applicable, the offeror will be given an opportunity to provide a revised proposal solely to amend proposals due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c)(4) will apply. Wage rates can be found at http://www.wdol.gov. |
| Notes: |
| 1) Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for all line items. Failure to do so may render the proposal unacceptable. |
| 2) On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line items exist for a portion of the work, include the costs in a related item. |
| 3) In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. |
| 4) Measurement for payment will be on a lump sum basis as a single item of work. Payment will be made at the contract lump sum price. |