Instructions
INSTRUCTIONS
| This workbook includes 3 worksheets. Additional sheets may be added. |
| MANUFACTURING DELIVERY SCHEDULE |
The schedule is to be completed with available systems in the configurations outlined. Detailed descriptions, assumptions or conditions are to be provided. Refer to section 1.e of Announcement
| GENERAL: Pricing must reflect the FAA as the most-favored customer. Vendors should base their completed submission on their existing Commercial-Off-The-Shelf (COTS) solutions and/or upcoming product lines. Submissions should include supporting documentation such as published price lists, LRU price lists, and applicable discounts. If Vendors offer discount tiers different than those identified in the the QSL CLIN Structure, please identify those discount offerings and associated pricing. Vendors should provide their Method of Quotation (MoQs) and Basis of Estimate (BOEs) for each priced CLIN. Vendors must provide a list(s) of customers who have purchased the offered products and services, including contact information. Additionally, vendors must furnish mean-time-between-failure (MTBF) data for each product line offered. |
| Assumptions, Constraints, and Risks – Vendors should identify any pricing assumptions, constraints, known risks, or dependencies that could affect cost, schedule, or performance. This information should be clearly explained in the response narrative or pricing workbook. |
| QSL CLIN Structure Include pricing for maintenance that covers First-Level, Second-Level, and Depot Maintenance under the applicable CLINs. If offering maintenance or service agreements, specify the duration, scope, and key terms of each agreement, and provide a crosswalk to Attachment 1 – Performance Work Statement (PWS). Explain how the offered maintenance will be accomplished and indicate standard maintenance rotations and the frequency of software and hardware updates. |
For the crosswalk, correlate your offering to the PWS requirements and identify any requirements not fully supported by the vendor’s offering. For each unsupported requirement, vendor must:
| 1. | Identify Capability Gaps – Specify which PWS requirements are not covered by the proposed COTS solution. |
| 2. | Provide T&M or FFP Effort – Provide a narrative for the PWS work not included in the offerings. Price remaining scope on a Time and Materials (T&M) or FFP basis. |
Complete CLIN Structure – Vendors must complete the provided Contract Line Item Number (CLIN) structure in full.
Identify any recurring or non-recurring costs related to the activities listed below, and note where such costs (if applicable) are included in other priced line items within the offering. For example:
| • | Program Management (C4.2.1) |
| • | System Engineering (C4.2.2) |
| • | Discrepancy Management (C4.2.7) |
| • | Integrated Logistics Support Plan (C4.2.8.1) |
| • | Gap Analysis and Operationalization (C4.2.5.1) |
3. Provide pricing for CLINs 0003 and 0004 in accordance with the quantities stated for CLINs 1 and 2.
LABOR HOUR Rate Schedule Provide rates for categories for as many years as possible. If a particular category is not shown, add at the bottom of the list.
See any specific instructions included in each Tab.
MANUFACTURING DELIVERY SCHEDULE
| Identify quantity per month of each product line for each configuration identied below | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Instructions: The FAA has provided a notional delivery schedule reflecting the timeline required to achieve the full replacement of up to 612 systems. Vendors are to complete rows 11–18 (yellow highlighted cells) based on their current and projected production capabilities, including the ability to support and conduct the associated implementation activities. It is understood that a single vendor may not be able to execute the entire radar system replacement effort independently; therefore, vendors should provide a realistic production and delivery schedule that reflects their individual capacity. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| VENDOR SCHEDULE FOR DELIVERY AND INSTALLATION | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Manufacturing capability | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| FAA NOTIONAL DELIVERY SCHEDULE | # of Systems | 0 | 0 | 0 | 11 | 10 | 17 | 20 | 20 | 20 | 20 | 22 | 22 | 24 | 24 | 24 | 26 | 26 | 26 | 30 | 30 | 30 | 30 | 30 | 30 | 28 | 24 | 23 | 23 | 22 | | | | 612 |
| Description | DELIVERY | Oct-25 | Nov-25 | Dec-25 | Jan-26 | Feb-26 | Mar-26 | Apr-26 | May-26 | Jun-26 | Jul-26 | Aug-26 | Sep-26 | Oct-26 | Nov-26 | Dec-26 | Jan-27 | Feb-27 | Mar-27 | Apr-27 | May-27 | Jun-27 | Jul-27 | Aug-27 | Sep-27 | Oct-27 | Nov-27 | Dec-27 | Jan-28 | Feb-28 | Mar-28 | Apr-28 | May-28 | Jun-28 |
| COOPERATIVE RADAR SYSTEM (TERMINAL - INTEGRATED) | 226 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| NONCOORPERATIVE RADAR SYSTEM (TERMINAL - INTEGRATED) | 226 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| COOPERATIVE RADAR SYSTEM (EITHER EN ROUTE OR TERMINAL) | 160 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| NONCOOPERATIVE RADAR SYSTEM (TERMINAL) | 0 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Totals | | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Implementaton Activities | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Site Installations | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Site Acceptance Tests | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Contractor Acceptance Inspections | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
QSL CLIN Structure
| Vendor Name: | VENDOR ASSUMPTIONS |
| CLIN Pricing | Provide assumptions for pricing, e.g. portion of price associated to tariffs, etc. |
| CLIN | SubCLIN | Item Description | CLIN Type | Qty | Unit | Unit Price | Extended Total | PWS Section |
| 0001* | Production Systems (Cooperative Surveillance Radar (CSR) Systems) | | | | | | | |
| 0001AA | Quantity 1-10 | FFP | 10 | EA | $ - 0 | $ - 0 | 4.1, 4.1.1-4.1.3, 4.1.5 |
| 0001AB | Quantity 11-20 | 20 | EA | $ - 0 | $ - 0 |
| 0001AC | Quantity 21-30 | 30 | EA | $ - 0 | $ - 0 |
| 0001AD | Quantity 31-50 | 50 | EA | $ - 0 | $ - 0 |
| 0001AE | Quantity 51+ | 51 | EA | $ - 0 | $ - 0 |
| Production Systems (Non-Cooperative Surveillance Radar (NCSR) Systems) | | | | | | | |
| 0001BA | Quantity 1-10 | FFP | 10 | EA | $ - 0 | $ - 0 | 4.1, 4.1.1-4.1.3, 4.1.5 |
| 0001BB | Quantity 11-20 | 20 | EA | $ - 0 | $ - 0 |
| 0001BC | Quantity 21-30 | 30 | EA | $ - 0 | $ - 0 |
| 0001BD | Quantity 31-50 | 50 | EA | $ - 0 | $ - 0 |
| 0001BE | Quantity 51+ | 51 | EA | $ - 0 | $ - 0 |
| Production Systems (Integrated Non-Cooperative and Cooperative Surveillance Radar Systems) | | | | | | | |
| 0001CA | Quantity 1-10 | FFP | 10 | EA | $ - 0 | $ - 0 | 4.1, 4.1.1-4.1.3, 4.1.5 |
| 0001CB | Quantity 11-20 | 20 | EA | $ - 0 | $ - 0 |
| 0001CC | Quantity 21-30 | 30 | EA | $ - 0 | $ - 0 |
| 0001CD | Quantity 31-50 | 50 | EA | $ - 0 | $ - 0 |
| 0001CE | Quantity 51+ | 51 | EA | $ - 0 | $ - 0 |
| 0002 | Implementation and Activation Activities (Cooperative Radar Sites) | | | | | | | |
| 0002AA | Site Survey | FFP | 1 | EA | $ - 0 | $ - 0 | 4.2.9-4.2.10 |
| 0002AB | Site Planning | | 1 | EA | $ - 0 | $ - 0 | |
| 0002AC | Site Design | | 1 | EA | $ - 0 | $ - 0 | |
| 0002AD | Site Preparation | | 1 | EA | $ - 0 | $ - 0 | |
| 0002AE | Site Installation | | 1 | EA | $ - 0 | $ - 0 | |
| 0002AF | Site Optimization (with 6-level weather) | | 1 | EA | $ - 0 | $ - 0 | |
| 0002AG | Site Optimization (without 6-level weather) | | 1 | EA | $ - 0 | $ - 0 | |
| 0002AH | Site Acceptance Test | | 1 | EA | $ - 0 | $ - 0 | |
| 0002AI | Contractor Acceptance Inspection | | 1 | EA | $ - 0 | $ - 0 | |
| Implementation and Activation Activities (Non-Cooperative Surveillance Radar (NCSR) Site) | | | | | | | |
| 0002BA | Site Survey | FFP | 1 | EA | $ - 0 | $ - 0 | 4.2.9-4.2.10 |
| 0002BB | Site Planning | | 1 | EA | $ - 0 | $ - 0 | |
| 0002BC | Site Design | | 1 | EA | $ - 0 | $ - 0 | |
| 0002BD | Site Preparation | | 1 | EA | $ - 0 | $ - 0 | |
| 0002BE | Site Installation | | 1 | EA | $ - 0 | $ - 0 | |
| 0002BF | Site Optimization | | 1 | EA | $ - 0 | $ - 0 | |
| 0002BG | Site Acceptance Test | | 1 | EA | $ - 0 | $ - 0 | |
| 0002BH | Contractor Acceptance Inspection | | 1 | EA | $ - 0 | $ - 0 | |
| Implementation and Activation Activities (Integrated NCRS and CRS Site) | | | | | | | |
| 0002CA | Site Survey | FFP | 1 | EA | $ - 0 | $ - 0 | 4.2.9-4.2.10 |
| 0002CB | Site Planning | | 1 | EA | $ - 0 | $ - 0 | |
| 0002CC | Site Design | | 1 | EA | $ - 0 | $ - 0 | |
| 0002CD | Site Preparation | | 1 | EA | $ - 0 | $ - 0 | |
| 0002CE | Site Installation | | 1 | EA | $ - 0 | $ - 0 | |
| 0002CF | Site Optimization | | 1 | EA | $ - 0 | $ - 0 | |
| 0002CG | Site Acceptance Test | | 1 | EA | $ - 0 | $ - 0 | |
| 0002CH | Contractor Acceptance Inspection | | 1 | EA | $ - 0 | $ - 0 | |
| 0003* | Maintenance - 1st Level (Per Site) | | | | | | | |
| 0003AA | Cooperative Radar System | FFP | 12 | MO | $ - 0 | $ - 0 | 4.2.8.2.2 |
| 0003AB | Non-Cooperative Radar System | | 12 | MO | $ - 0 | $ - 0 | |
| 0003AC | Integrated NCRS and CRS | | 12 | MO | $ - 0 | $ - 0 | |
| Maintenance - 2nd Level (Per Site) | | | | | | | |
| 0003BA | Cooperative Radar System | FFP | 12 | MO | $ - 0 | $ - 0 | 4.2.8.2.3; 4.2.8.4 |
| 0003BB | Non-Cooperative Radar System | | 12 | MO | $ - 0 | $ - 0 | |
| 0003BC | Integrated NCRS and CRS | | 12 | MO | $ - 0 | $ - 0 | |
| Depot (Per Site) | | | | | | | |
| 0003CA | Cooperative Radar System | FFP | 12 | MO | $ - 0 | $ - 0 | 4.2.8.2.4; 4.2.8.2.1 |
| 0003CB | Non-Cooperative Radar System | | 12 | MO | $ - 0 | $ - 0 | |
| 0003CB | Integrated NCRS and CRS | | 12 | MO | $ - 0 | $ - 0 | |
0004* Program Management FFP 12 MO $ - 0 $ - 0 4.2.1
*Provide pricing in accordance with the quantities stated for CLINs 1 and 2.
LABOR HOUR Rate Schedule
| Company Name: | |
| LABOR HOUR Schedule of Rates | |
| Instructions: | Populate the yellow-highlighted cells with the proposed Fully Burdened Labor Rates (FBLR) by year. Subcontractor or third-party labor rates that differ from the prime contractor’s rates shall be provided in a separate table or tab, or clearly incorporated within this document. Propose, accordingly, any LCATs not specified in the Labor Category List. |
| Period of Performance | | | | | | | | | | | | | | | |
| Contract Year | CY01 | CY02 | CY03 | CY04 | CY05 | CY06 | CY07 | CY08 | CY09 | CY10 | CY11 | CY12 | CY13 | CY14 | CY15 |
| Labor Category | 2025 | 2026 | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | 2037 | 2038 | 2039 |
| 1 | Program Manager | | | | | | | | | | | | | | | |
| 2 | Contract Manager | | | | | | | | | | | | | | | |
| 3 | System Engineering Lead | | | | | | | | | | | | | | | |
| 4 | Software Engineering Lead | | | | | | | | | | | | | | | |
| 5 | Test Manager | | | | | | | | | | | | | | | |
| 6 | Logistics Manager | | | | | | | | | | | | | | | |
| 7 | Training Lead | | | | | | | | | | | | | | | |
| 8 | Installation and Activation Manager | | | | | | | | | | | | | | | |
| 9 | Quality Assurance Manager | | | | | | | | | | | | | | | |
| 10 | Program Control Specialist | | | | | | | | | | | | | | | |
| 11 | Program Administrator | | | | | | | | | | | | | | | |
| 12 | Mid-level Configuration Management Analyst | | | | | | | | | | | | | | | |
| 13 | Junior Configuration Management Analyst | | | | | | | | | | | | | | | |
| 14 | Quality Control Analyst | | | | | | | | | | | | | | | |
| 15 | Senior Software Engineer | | | | | | | | | | | | | | | |
| 16 | Mid-level Software Engineer | | | | | | | | | | | | | | | |
| 17 | Junior Software Engineer | | | | | | | | | | | | | | | |
| 18 | Senior Hardware Engineer | | | | | | | | | | | | | | | |
| 19 | Mid-level Hardware Engineer | | | | | | | | | | | | | | | |
| 20 | Junior Hardware Engineer | | | | | | | | | | | | | | | |
| 21 | Senior Training Specialist | | | | | | | | | | | | | | | |
| 22 | Mid-level Training Specialist | | | | | | | | | | | | | | | |
| 23 | Junior Training Specialist | | | | | | | | | | | | | | | |
| 24 | Senior ILS Engineer | | | | | | | | | | | | | | | |
| 25 | Mid-level ILS Engineer | | | | | | | | | | | | | | | |
| 26 | Junior ILS Engineer | | | | | | | | | | | | | | | |
| 27 | Senior Systems Engineer | | | | | | | | | | | | | | | |
| 28 | Mid-level Systems Engineer | | | | | | | | | | | | | | | |
| 29 | Junior Systems Engineer | | | | | | | | | | | | | | | |
| 30 | Senior Test Engineer | | | | | | | | | | | | | | | |
| 31 | Mid-level Test Engineer | | | | | | | | | | | | | | | |
| 32 | Entry level Test Engineer | | | | | | | | | | | | | | | |
| 33 | Senior Security Engineer | | | | | | | | | | | | | | | |
| 34 | Mid-level Security Engineer | | | | | | | | | | | | | | | |
| 35 | Senior Human Factors Engineer | | | | | | | | | | | | | | | |
| 36 | Mid-level Human Factors Engineer | | | | | | | | | | | | | | | |
| 37 | Entry level Human Factors Engineer | | | | | | | | | | | | | | | |
| 38 | Engineering Technician | | | | | | | | | | | | | | | |
| 39 | Technical Writer | | | | | | | | | | | | | | | |
| 40 | Senior Installation and Activation Specialist | | | | | | | | | | | | | | | |
| 41 | Mid-level Installation and Activation Specialist | | | | | | | | | | | | | | | |
| 42 | Junior Installation and Activation Specialist | | | | | | | | | | | | | | | |
Sheet4
J-33.1 Total Price Summary
| Company Name: | |
| J-33.1: Total Proposed Price Summary | |
| Instructions: | This worksheet will automatically populate using the pricing information provided in the subsequent tabs, with the exception of CPFF CLINs and CLINs with NTE amounts provided in Section B. Offerors must link the Totals for each CPFF CLIN in the appropriate cells highlighted in yellow (See Tab J-33.3). |
| BASE PERIOD | | | | | | |
| CLIN | Supplies/Services | Quantity | Units | CLIN Type | Total Price | |
| 0001 | Program Management | 48 | MONTHS | FFP | ERROR:#REF! | |
| 0002 | System Engineering & Design | 1 | LOT | FFP | ERROR:#REF! | |
| 0005A | Support System Technical Data – Depot | 1 | LOT | FFP | ERROR:#REF! | |
| 0005B | Support System Technical Data – Program Support Facility (PSF) | 1 | LOT | FFP | ERROR:#REF! | |
| 0006 | Production Systems | 25 | EA | FFP | ERROR:#REF! | |
| 0007 | Site Implementation/ Activation Services | | | T&M | $14,358,000.00 | NTE |
| 0008 | Test & Evaluation | 1 | LOT | CPFF | | |
| 0009 | Engineering Services | | | T&M | $706,000.00 | NTE |
| 0010 | Interim Contractor Depot Level Support (ICDLS) | | | T&M | $170,000.00 | NTE |
| 0011 | Integrated Logistics Support Data | 1 | LOT | FFP | ERROR:#REF! | |
| 0012A | Training Development for FAA Field Maintenance Personnel | 1 | LOT | FFP | ERROR:#REF! | |
| 0012B | Training Development for FAA Second Level Personnel | 1 | LOT | FFP | ERROR:#REF! | |
| 0012C | Training Development for FAA Depot Level Personnel | 1 | LOT | FFP | ERROR:#REF! | |
| 0012D | Training Development for FAA Air Traffic Control (ATC) Personnel | 1 | LOT | FFP | ERROR:#REF! | |
| 0012E | Familiarization Training Development for FAA Test Team Personnel | 1 | LOT | FFP | ERROR:#REF! | |
| 0013A | Course Conduct for FAA Field Maintenance Personnel | 20 | EA | FFP | ERROR:#REF! | |
| 0013D | Course Conduct for FAA Air Traffic Control (ATC) Personnel | 20 | EA | FFP | ERROR:#REF! | |
| 0013E | Familiarization Course Conduct for FAA Test Team Personnel | 2 | EA | FFP | ERROR:#REF! | |
| 0014A | FAA Depot Spares | 1 | LOT | FFP | ERROR:#REF! | |
| 0014B | Additional LRUs for Site Level Spares (Option) | 25 | LOT | FFP | ERROR:#REF! | |
| 0015 | Information System Security Services (Option) | 1 | LOT | CPFF | | |
| 0016A | Travel – First Article & Key Site Systems | | | CR | $572,000.00 | NTE |
| 0016B | Travel – Production Systems | | | CR | $2,329,000.00 | NTE |
| 0016C | Travel – Program Management (TIMs, PMRs) | | | CR | $251,000.00 | NTE |
| 0016D | Travel – Testing | | | CR | $806,000.00 | NTE |
| 0016F | Material – ICDLS | | | CR | TBD | NTE |
| 0019A | Additional Maintenance Terminals (Option) | 20 | EA | FFP | ERROR:#REF! | |
| 0019B | Additional Air Traffic Terminals (Option) | 20 | EA | FFP | ERROR:#REF! | |
| TOTAL | BASE PERIOD | | | | ERROR:#REF! | |
| OPTION PERIOD 1 | | | | | | |
| CLIN | Supplies/Services | Quantity | Units | CLIN Type | Total Price | |
| 1001 | Program Management | 24 | MONTHS | FFP | ERROR:#REF! | |
| 1006 | Production Systems | 42 | EA | FFP | ERROR:#REF! | |
| 1007 | Site Implementation/ Activation Services | | | T&M | $18,339,000.00 | NTE |
| 1009 | Engineering Services | | | T&M | $944,000.00 | NTE |
| 1010 | Interim Contractor Depot Level Support (ICDLS) | | | T&M | $892,000.00 | NTE |
| 1013A | Course Conduct for FAA Field Maintenance Personnel | 20 | EA | FFP | ERROR:#REF! | |
| 1013B | Course Conduct for FAA Second Level Engineering Personnel | 5 | EA | FFP | ERROR:#REF! | |
| 1013C | Course Conduct for FAA Depot Level Personnel | 2 | EA | FFP | ERROR:#REF! | |
| 1014A | FAA Depot Spares | 1 | LOT | FFP | ERROR:#REF! | |
| 1014B | Additional LRUs for Site Level Spares (Option) | 42 | LOT | FFP | ERROR:#REF! | |
| 1015 | Information System Security Services (Option) | 1 | LOT | CPFF | | |
| 1016B | Travel – Production Systems | | | CR | $2,766,000.00 | NTE |
| 1016C | Travel – Program Management (TIMs, PMRs) | | | CR | $96,000.00 | NTE |
| 1016E | Travel/ODCs - Equipment Removal & Disposition (Option) | | | CR | $460,000.00 | NTE |
| 1016F | Material – ICDLS | | | CR | TBD | NTE |
| 1017 | First Article Unit Refurbishment (Option) | 3 | EA | FFP | ERROR:#REF! | |
| 1018 | Equipment Removal & Disposition (Option) | | | T&M | $2,799,000.00 | NTE |
| 1019A | Additional Maintenance Terminals (Option) | 40 | EA | FFP | ERROR:#REF! | |
| 1019B | Additional Air Traffic Terminals (Option) | 40 | EA | FFP | ERROR:#REF! | |
| 1020A | MSBRS First Article Antenna (Option) | 1 | EA | FFP | ERROR:#REF! | |
| 1020B | MSBRS Production Antenna (Option) | 3 | EA | FFP | ERROR:#REF! | |
| TOTAL | OPTION PERIOD 1 | | | | ERROR:#REF! | |
| OPTION PERIOD 2 | | | | | | |
| CLIN | Supplies/Services | Quantity | Units | CLIN Type | Total Price | |
| 2001 | Program Management | 24 | MONTHS | FFP | ERROR:#REF! | |
| 2006 | Production Systems | 50 | EA | FFP | ERROR:#REF! | |
| 2007 | Site Implementation/ Activation Services | | | T&M | $19,467,000.00 | NTE |
| 2009 | Engineering Services | | | T&M | $953,000.00 | NTE |
| 2010 | Interim Contractor Depot Level Support (ICDLS) | | | T&M | $742,000.00 | NTE |
| 2014A | FAA Depot Spares | 1 | LOT | FFP | ERROR:#REF! | |
| 2014B | Additional LRUs for Site Level Spares (Option) | 50 | LOT | FFP | ERROR:#REF! | |
| 2015 | Information System Security Services (Option) | 1 | LOT | CPFF | | |
| 2016B | Travel – Production Systems | | | CR | $2,862,000.00 | NTE |
| 2016C | Travel – Program Management (TIMs, PMRs) | | | CR | $53,000.00 | NTE |
| 2016E | Travel/ODCs - Equipment Removal & Disposition (Option) | | | CR | $823,000.00 | NTE |
| 2016F | Material – ICDLS | | | CR | TBD | NTE |
| 2017 | First Article Unit Refurbishment (Option) | 3 | EA | FFP | ERROR:#REF! | |
| 2018 | Equipment Removal & Disposition (Option) | | | T&M | $6,131,000.00 | NTE |
| 2019A | Additional Maintenance Terminals (Option) | 25 | EA | FFP | ERROR:#REF! | |
| 2019B | Additional Air Traffic Terminals (Option) | 25 | EA | FFP | ERROR:#REF! | |
| 2020A | MSBRS First Article Antenna (Option) | 1 | EA | FFP | ERROR:#REF! | |
| 2020B | MSBRS Production Antenna (Option) | 37 | EA | FFP | ERROR:#REF! | |
| TOTAL | OPTION PERIOD 2 | | | | ERROR:#REF! | |
| OPTION PERIOD 3 | | | | | | |
| CLIN | Supplies/Services | Quantity | Units | CLIN Type | Total Price | |
| 3001 | Program Management | 24 | MONTHS | FFP | ERROR:#REF! | |
| 3006 | Production Systems | 25 | EA | FFP | ERROR:#REF! | |
| 3007 | Site Implementation/ Activation Services | | | T&M | $19,901,000.00 | NTE |
| 3009 | Engineering Services | | | T&M | $1,011,000.00 | NTE |
| 3014B | Additional LRUs for Site Level Spares (Option) | 25 | LOT | FFP | ERROR:#REF! | |
| 3015 | Information System Security Services (Option) | 1 | LOT | CPFF | | |
| 3016B | Travel – Production Systems | | | CR | $2,947,000.00 | NTE |
| 3016C | Travel – Program Management (TIMs, PMRs) | | | CR | $55,000.00 | NTE |
| 3016E | Travel/ODCs - Equipment Removal & Disposition (Option) | | | CR | $698,000.00 | NTE |
| 3017 | First Article Unit Refurbishment (Option) | 3 | EA | FFP | ERROR:#REF! | |
| 3018 | Equipment Removal & Disposition (Option) | | | T&M | $5,871,000.00 | NTE |
| 3019A | Additional Maintenance Terminals (Option) | 25 | EA | FFP | ERROR:#REF! | |
| 3019B | Additional Air Traffic Terminals (Option) | 25 | EA | FFP | ERROR:#REF! | |
| 3020A | MSBRS First Article Antenna (Option) | 1 | EA | FFP | ERROR:#REF! | |
| 3020B | MSBRS Production Antenna (Option) | 40 | EA | FFP | ERROR:#REF! | |
| TOTAL | OPTION PERIOD 3 | | | | ERROR:#REF! | |
| OPTION PERIOD 4 | | | | | | |
| CLIN | Supplies/Services | Quantity | Units | CLIN Type | Total Price | |
| 4001 | Program Management | 24 | MONTHS | FFP | ERROR:#REF! | |
| 4007 | Site Implementation/ Activation Services | | | T&M | $21,102,000.00 | NTE |
| 4009 | Engineering Services | | | T&M | $1,072,000.00 | NTE |
| 4015 | Information System Security Services (Option) | 1 | LOT | CPFF | | |
| 4016B | Travel – Production Systems | | | CR | $3,039,000.00 | NTE |
| 4016C | Travel – Program Management (TIMs, PMRs) | | | CR | $57,000.00 | NTE |
| 4016E | Travel/ODCs - Equipment Removal & Disposition (Option) | | | CR | $374,000.00 | NTE |
| 4017 | First Article Unit Refurbishment (Option) | 3 | EA | FFP | ERROR:#REF! | |
| 4018 | Equipment Removal & Disposition (Option) | | | T&M | $3,238,000.00 | NTE |
| 4020A | MSBRS First Article Antenna (Option) | 1 | EA | FFP | ERROR:#REF! | |
| 4020B | MSBRS Production Antenna (Option) | 20 | EA | FFP | ERROR:#REF! | |
| TOTAL | OPTION PERIOD 4 | | | | ERROR:#REF! | |
MSBRS TOTAL (Base + Options) ERROR:#REF!
J-33.2A Spares X014A
| Company Name: | |
| J-33.2A: Spares Pricing List (X014A FAA Depot Spares) | |
| Instructions: | Offerors are instructed to develop an itemized list of anticipated FAA depot level spares identifying the part number, quantity, unit price, and a total price for each item listed, as well as a Total Price per Lot. Offerors must link the Total Price per Lot for each CLIN in the appropriate cells highlighted in yellow. Offerors may add additional rows as necessary as long as the Total Price per Lot is linked to Tab J-33.2. |
| BASE PERIOD | | | | | |
| Supplies/Services | Part Number | Quantity | Units | Unit Price | Total Price |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| TOTAL PRICE PER LOT | 0014A | | | | $0.00 |
| OPTION PERIOD 1 | | | | | |
| Supplies/Services | Part Number | Quantity | Units | Unit Price | Total Price |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| TOTAL PRICE PER LOT | 1014A | | | | $0.00 |
| OPTION PERIOD 2 | | | | | |
| Supplies/Services | Part Number | Quantity | Units | Unit Price | Total Price |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| | | | | $0.00 |
| TOTAL PRICE PER LOT | 2014A | | | | $0.00 |
J-33.3 CPFF Sample
| Company Name: | |
| J.33.3 CPFF Pricing Report (CLINs X008 and X015) | |
| Instructions: | Tab J-33.3 is provided as a sample template containing the required level of detail for each cost-type CLIN. However, the Offeror can submit its own format as long as it includes the required level of detail and it is linked to Tab J-33.1. The submitted format must include the detailed cost/pricing data by labor categories, labor hours, cost elements, including all direct and indirect costs, and fee that equate to the price by CLIN and corresponding to the lowest level applicable of the Program Work Breakdown Structure (WBS) as identified in Attachment J-27. |
Must show all formulas. No locked cells.
| CLIN | WBS | Year | Labor Category | Labor Burden | Months | Hours | Labor | Overhead | Material | Material Handling | Subcontractor | Material/ | | | | | | | | |
| Subcontractor Burden | Travel | ODCs | Subtotal | G&A | Total Cost | FCCM | Proft/Fee | Total Price | | | | | | | | | | | | | |
| XXXX | ABC | 2020 | | xx | 5 | 800 | $40,000 | $36,000 | $1,000 | $20 | $1,000 | $20 | $500 | $0 | $78,540 | $15,708 | $94,248 | $100 | $9,425 | $103,773 |
CPFF Total 800 $40,000 $36,000 $1,000 $20 $1,000 $20 $500 $0 $78,540 $15,708 $94,248 $100 $9,425 $103,773