This is a submittal register spreadsheet for a construction project to maintain an Aircraft Parking Apron. The register details required submittals across multiple project phases including preconstruction, during construction, and closeout documentation.

Key submittals include a Traffic Management Plan, Progress Schedule, contractor qualifications, progress reports, inspection documentation, warranty information, and various technical submittals related to concrete work and sealants. The register specifies which items require government approval (marked with "G") versus those that are for information only (marked "FIO"). Technical submittals include concrete mix designs, sealant specifications, test reports for cement properties, slump, air content, compressive strength, and bond strength. Each line item includes tracking columns for submission dates, approval status, and routing between contractor and government reviewers.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Maintain A/C Parking ApronCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
Statement of WorkPreconstruction Submittals
Traffic Mangament Plan4.7Gx
Progress Schedule8.1Gx
Qualifications8.3Gx
During Construction Submittals
Progress Report8.2Gx
Close Out Submittals
Pre-Final Inspection8.7Gx
Final Inspection8.8Gx
Warranty8.9Gx
Specifications
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.7Gx
01 78 00SD-11 Closeout Submittals
As-Built Drawings3.1FIO
32 01 19.61SD-01 Product Data
Sealants2.1Gx
Blocking Media/Backup Materials2.3.1FIO
Backer Rod3.3.4.1Gx
Bond Breaking Tapes2.3.2FIO
SD-06 Test Reports
Sealants2.1FIO
32 01 29.61SD-03 Product Data
Concrete Mix Design1.4.1Gx
Concrete Mix Design2.1.3.1Gx
Rigid Proprietary Repair ProductsGx
Polymeric Proprietary Repair2.1.10Gx
Products
Pigmented Liquid2.1.4.1FIO
Membrane-Forming Compound2.1.4.2FIO
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Maintain A/C Parking ApronCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
32 01 29.61SD-06 Test Reports
Test Results1.4.1FIO
Cement1.4.1.1FIO
Slump2.1.3.1FIO
Air Content2.1.3.1FIO
Compressive Strength2.1.9.1FIO
Bond Strength2.1.9.2FIO