Attachment 4 QASP (Ansbach).pdf

PDF 389 KB Posted

Attached to
DoDEA-Europe Daily Commute Student Transportation Service – Ansbach, Germany
Solicitation number
HE1254-21-R-2001
Issued by

View the file

Other files

File Type Posted
SF30 HE125421R2001-00004 Sign-Submit with Proposal.pdf PDF
SF30 HE125421R2001-00003 Sign-Submit with Proposal.pdf PDF
UPDATE Attachment 1 PWS Ansbach DC.pdf PDF
SF30 HE125421R2001 0001 Sign-Submit with Proposal.pdf PDF
SF1449 HE125421R2001 0001 Conformed Sign-Submit with Proposal .pdf PDF
SF30 HE125421R2001-00002 Sign-Submit with Proposal.pdf PDF
SF1449 HE125421R2001-00002 Conformed Sign-Submit with Proposal.pdf PDF
UPDATED Attachment 5 Technical Capability Ansbach (adjusted).pdf PDF
UPDATED Attachment 3 PPQ Ansbach (adjusted).pdf PDF
UPDATED Attachment 5 Technical Capability Ansbach (adjusted).pdf PDF
UPDATED Attachment 3 PPQ Ansbach (adjusted).pdf PDF
HE1254-21-R-2001 0001 Conformed.pdf PDF
SF30 HE1254-21-R-2001 0001.pdf PDF
Attachment 7 Commuting Area Ansbach.pdf PDF
Attachment 2 Pricing Sheet Ansbach.pdf PDF
HE1254-21-R-2001 Ansbach Daily Commute.pdf PDF
Attachment 3 PPQ.PDF PDF
Attachment 5 Technical Capability Ansbach.pdf PDF
Enclosure 6 52.204-26 Covered Telecommunication.pdf PDF
Enclosure 5 CPARS.PDF PDF
Enclosure 2 52.212-3 Alt 1.pdf PDF
Attachment 6 Reps and Certs Ansbach.pdf PDF
Attachment 2 Pricing Sheet Ansbach RUN_jhg.XLSX XLSX spreadsheet
Enclosure 1 52.209-7.pdf PDF
Enclosure 3 52.222-56.pdf PDF
Enclosure 4 Letter of Commitment.PDF PDF
Attachment 1 PWS Ansbach DC.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR INFORMATIONAL PURPOSES ONLY

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

DoDEA EUROPE EAST DISTRICT

SCHOOL TRANSPORTATION SERVICES

ANSBACH AREA OF OPERATION

I. INTRODUCTION

1. This Quality Assurance Surveillance Plan (QASP) provides guidance and procedures to Government personnel responsible for surveillance of the Contractor’s performance for work performed under Contracts for the DoDEA Europe East District. Its primary focus is to ensure:

• That Contractor compliance and/or failure to comply with the terms and conditions of the contract are systematically identified, accurately documented and reported in a timely manner;

• That a basis is provided to support contract administration decisions regarding acceptance of services, payment for services, and evoking contractual remedies for failure by the Contractor to perform as required; and

• That the Government's interests in its business dealings with the Contractor are protected and served.

2. Through responsible surveillance of Contractor performance, utilizing the methods and procedures prescribed herein, the QASP serves as an effective mechanism to ensure acceptance of the level of quality of services required by contractual requirements. It comports directly with the contract’s Performance Work Statement (PWS), which identifies specific task requirements the Government will focus on during its inspection of services. The QASP is a stand-alone document internal to Government use and is provided to the Contractor “For Informational Purposes Only.” The QASP is not a material or legally binding part of the contract itself.

• The plan is developed on the premise that the Contractor, not the Government, is responsible for implementing effective management and quality control measures to ensure compliance with performance requirements.

• Nonconformance with contract requirements is termed a “Deficiency”. The term “Deficiency” refers to performance of a service requirement that does not meet the associated contractual requirement defined in the contract’s PWS.

• Inspection and acceptance of Contractor services will be accomplished pursuant to the provisions of FAR Clause FAR 52.212-4 Contract Terms and Conditions – Commercial Items in the contract.

• For services that do not conform to contract requirements, the Government may require the Contractor to re-perform to ensure conformity and acceptance at no increase in contract amount.

In the event substandard services cannot be corrected through re-performance the Government will require the Contractor to:

-- To take necessary action to ensure that future performance conforms to contract requirements, or;

-- Reduce the contract price in accordance with the associated deduction allowed for in the

Standard Deductions.

In the event substandard performance occurs, should the Contractor fail to take the necessary action to ensure future conformance with contract requirements, or promptly re-perform services to an acceptable level, the Government may:

-- Have the services performed by other means and charge to the Contractor any cost incurred, or;

-- Terminate the Contractor for cause.

3. Suggestions for changes, additions and improvements to this QASP are encouraged and will be subject to final approval by the Contracting Officer (CO). Written or telephonic coordination for changes, supplementation or improvements may be initiated by the Contracting Officer’s Representative (COR) with concurrent information retained by the District Transportation Supervisor (DTS) and the School

Transportation Office (STO).

4. It is important to emphasize that quality control is the sole responsibility of the Contractor; not the

Government. The Government surveils and inspects the Contractor’s performance for purposes of

“Assuring” the level of quality of services agreed to in the contract are received. Hence, the Government is responsible for quality assurance.

5. The Government has the right under this contract to perform quality assurance at any time or place as long as it does not interfere with the progress of the work. This means the Government may conduct inspections at any point in performance including:

Inspection of materials prior to incorporation into the work, or, inspection of the Contractor's preparations;

Inspection during the work process itself, especially where quality characteristics may not be obvious from simple visual inspection of the output; and, Inspection of the completed item or service.

6. There are essentially five elements to quality assurance:

The output, service, or requirement the Contractor is obligated to perform by the PWS;

The requirements established by the PWS, whether relating to quality, timeliness, and/or other measures;

The quality assurance method, including the frequency of its application;

The documentation and reporting of results, including checklists, work sheets, summary forms, and contract discrepancy reports (CDRs); and, Follow-up to ensure any required corrective action has been taken by the Contractor.

II. DEFINITIONS

Contract - An agreement between the Government and Contractor enforceable by law.

Contract Administration - All interrelated activities with the purpose of ensuring contract terms and conditions are met by both the Contractor and the Government.

Contracting Officer (CO) - An official in a contracting office authorized by written appointment to enter into, administer, and terminate contracts and place delivery orders under contracts.

Contracting Officer's Representative (COR) - This individual will be designated by the CO. The COTR is responsible for surveilling and inspecting Contractor performance and providing written recommendation for acceptance of services. This individual shall have overall responsibility for the coordination of

Contractor performance in accordance with the performance work statement and any resulting task order that may be issued by the CO. Duties also include technical assistance to the CO and surveillance and compliance duties as further enumerated in this plan.

Inspection - Examination of services by Government personnel utilizing applicable inspection methodologies to determine conformance to contract requirements, terms, and conditions.

Quality Assurance (QA) - Actions taken by Government personnel, including inspection, to determine if the products/services delivered by the Contractor meet the contract requirements. Quality assurance involves a broader range of activities than just inspection.

Quality Control (QC) - Those actions taken by the Contractor to control the performance of services so that the requirements of the contract are met.

Performance Work Statement (PWS) - Represents technical and management requirements of the contract including any applicable technical exhibits essential to the Contractor’s performance of services.

Surveillance - Quality assurance and other actions taken by Government personnel to determine Contractor conformance and nonconformance with contract performance requirements. Surveillance is a broader term than inspection or QA because it encompasses the examination of the business as well as the technical aspects of the contract. However, the term "quality assurance surveillance" refers to those surveillance actions directly related to quality assurance.

III. QASP PROCEDURES

1. Quality Assurance Surveillance Schedule - The Quality Assurance Evaluator (QAE) or COR, as applicable, will develop internal monthly surveillance schedules in calendar format for Government use only based on key performance requirements in the PWS and inspection methodology established herein.

End of month inspection reports documenting Contractor performance will be provided monthly to the DoDEA-E East District Transportation Supervisor (DTS).

2. Method of Inspection - The methods of inspection to be utilized, at Government discretion, to assure quality services are received under the contract are identified below. These methods are “Scheduled Inspection” and “Record of Customer Complaint.” Note that the Government reserves the right to unilaterally change its methods of inspection, and if accomplished, will promptly provide a copy of the revised QASP to the Contractor for informational purposes:

• Scheduled Inspection - The COR/QAE will develop a monthly surveillance schedule in calendar format based on select requirements in the PWS. Table 1, provided with this QASP, highlights select requirements for potential inspection. The COR/QAE will complete and distribute each monthly surveillance schedule not later than the last workday of the preceding month beginning with the first month following the date of contract award. The COR/QAE will send a signed copy of the schedule and any updates during the month to both the DoDEA Headquarters Procurement Office contract administrator and the DTS. A signed copy of the completed monthly surveillance schedule to include any updates shall be retained in the COR file and uploaded into JAM using the

Procurement Integrated Enterprise Environment (PIEE). Every page of the monthly surveillance schedule shall be marked “FOR OFFICIAL USE ONLY”. The surveillance schedule shall not be provided to the Contractor in order to maintain the integrity of the process associated with quality assurance.

-- The COR/QAE is responsible for selecting and scheduling routes and vehicles for inspection.

The COR/QAE will utilize the Vehicle Quality Assurance Checklist as a guide for vehicle inspections.

-- Determination of various routes and vehicles for scheduled inspection is subjective. However, to provide consistent surveillance, and as a basis for comparing trends from month to month, the

COR/QAE will apply consistent criteria in selecting and scheduling routes and vehicles for scheduled inspection.

-- The COR/QAE should vary routes, runs and vehicles to be inspected, so the same services or vehicles are not inspected every time and inspections do not follow an obvious pattern. Document the method used in scheduling inspections and apply it consistently from surveillance period to surveillance period so trends may be identified.

-- The COR/QAE should schedule additional inspections for emphasis on known or suspected problem areas, plus to follow up on customer complaints. As needed, monthly surveillance schedules should be revised for additional inspections in problem areas. The COR/QAE must establish a clear pattern of increased inspections to focus on problem areas, giving the Contractor greater incentive to improve performance because known problem areas are being closely observed.

Record of Customer Complaint - At any time during the life of the contract, the COR/QAE may receive customer complaints about the quality of services. The complainant or COR/QAE should properly record all complaints. The COR/QAE shall:

-- Investigate complaints as they are received to ensure they are valid and document the complaint on the form provided at Attachment 1; Record of Customer Complaint. Notify the contract manager of any validated complaint and annotate the complaint form with the means, date, and time the Contractor was notified. Retain validated complaint forms in the COR file.

-- Customer complaints are seldom used to reject a service or deduct money from Contractor payments. However, validated customer complaints can reinforce the accuracy of sample results.

At the end of each month, count all validated complaints to determine if overall performance is acceptable or unacceptable. Forward a copy of each form to the CO’s with the COR/QAE’s recommendation for further action, when necessary. When scheduled inspections also indicate unsatisfactory service, validated complaints may support seeking remedies other than or in addition to monetary deductions.

-- Customer complaints, like incidental COR/QAE observations, may be the bases for scheduling follow-up observations under scheduled inspections, focusing attention on known or suspected problem areas. Revise or initiate scheduled inspection schedules as needed for emphasis on unsatisfactory areas of performance.

3. Documentation/Reports

a. Contractor Discrepancy Report:

A Contractor Discrepancy Report (CDR) is a formal, written documentation used to document unsatisfactory Contractor performance. The CDR requires the Contractor to explain, in writing, why performance is unsatisfactory; how performance shall be returned to satisfactory levels, and how recurrence of the problem shall be prevented in the future.

A Contractor Discrepancy Report (CDR) is generally prepared by a COR to notify the Contractor of a pending discrepancy. The purpose of a CDR is to allow Contractor to correct their discrepancy without interference from the Government. If the Contractor fails to correct the discrepancy within the time given in the CDR, the Contracting Officer has the option of elevating the issue. The COR will generate the CDR and forward it directly to the assigned Contract Specialist (CS)/Contracting

Officer (CO) within the DoDEA Procurement Division not later than the following business day.

Upon receipt, the CS/CO will work jointly with the COR to ensure all information contained in the

CDR is accurate, sufficient and credible. Once determined valid, sufficient and supportable, the

CS/CO will issue the CDR to the Contractor the following business day. The Contractor will provide a written position in response to the CDR and return the document to the CS/CO within two (2) business days after receipt. Within three (3) business days of receipt of the CDR from the

Contractor, the CS/CO will render a final Determination. The CS/CO will issue the completed

CDR to the Contractor. A copy will be provided to the COR with the original document being retained in the official contract file.

For every observed defect and validated customer complaint, the COR will initiate a CDR to document defects and track the steps taken to finalize the action.

The COR is responsible for completing blocks 1-8 of the CDR as follows:

(1) Block 1: Enter the contract and current task order numbers.

(2) Block 2: Enter a CDR report number. Number CDR’s in sequence for each contract as defects occur. Maintain a log of CDR’s in report number sequence on a locally developed log which includes, as a minimum, the contract and task order numbers, the CDR report number, the date of defect, the dates sent to and received back from Contractor, the date sent to Procurement Division, and the close-out date.

(3) Block 3: Enter the names of the Contractor and contract manager.

(4) Block 4: Enter the COR’s name, title, and field office.

(5) Block 5: Enter Dates, prepared, and returned by Contractor, action complete.

(6) Block 6: Describe the deficiency in detail; at a minimum, enter the date, time, bus route and run, CLIN, deficiency, and references in the contract specification.

(7) Block 7: The Quality Assurance Evaluator (QAE), if locally assigned, will sign the document, and submit it to the COR.

(8) Block 8: The appointed COR identified in Block 4 will sign the document and submit it to the Contracting Officer.

The Contractor is responsible for completing blocks 9-13 of the CDR as follows:

(9) Block 9: Enter the responsible Contracting Officer’s name.

(10) Block 10: Enter the responsible Contractor’s name.

(11) Block 11: Contractor provides detailed response to the CDR, to include cause, corrective action and action taken to prevent recurrence.

(12) Block 12: Contractor signs the CDR.

(13) Block 13: Contractor enter the date, and return the CDR to the responsible CS/KO.

Table 1 below provides a list of select requirements within the PWS that represent areas of potential inspection in the Government’s surveillance of Contractor performance. Note that the Government reserves the right to inspect any PWS requirement it deems necessary to ensure adequate and comprehensive surveillance of Contractor performance.

For unsatisfactory or incomplete services, a Contract Discrepancy Report (CDR) will be issued.

Deductions will only be taken for services not performed (e.g., failure to complete a run). The CDR will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The CDR will cite each discrepancy by PWS requirement as listed in the Performance Requirements Summary.

The Contracting Officer may take other actions as deemed appropriate. CDR procedures may change as directed by the Contracting Officer.

Inspection of services will be conducted by the COR and/or QAE primarily on a planned sampling and customer complaint basis. For planned sampling, the sample selected for surveillance may be randomly selected or may focus on service areas perceived as critical to the U.S. Government. In a few cases, 100 percent inspection is appropriate for specific one-time events. Incidental surveillance may be conducted while the Contractor is performing services under the contract. The COR and/or QAE will verify customer complaints before recording defects in Contractor performance; this compliments the planned sampling surveillance method.

Quality Standard PWS Requirement Acceptable Quality

Level (AQL)

Method of Surveillance

Transportation

Objective

Objectives 1 thru 4 PWS

Paras. 2.1, 2.2,2.3 and 2.4

98%Compliance Planned Sampling/ Validated

Customer Complaint

Reporting Objective PWS Paras. 2.1, 2.2, 2.3,

2.4 and 3.5

No more than 1 late per month

Planned Sampling/ meeting suspense date

Secured Communication

Devices

PWS Para. 2.5 100% Compliance Planned Sampling/ Validated

Customer Complaint

Security Objective PWS Para. 3.1 100% Compliance Planned Sampling/ Validated

Customer Complaint

Safety Objective PWS Paras. 3.2 100% Compliance Planned Sampling/ Validated

Customer Complaint

Vehicle Standards

Objective

PWS Para. 3.3 100% Compliance Planned Sampling/ Validated

Customer Complaint

Personnel Standards

Objective

PWS Para. 3.4 98% Compliance Planned Sampling/ Validated

Customer Complaint

Accident / Incident

Objective

PWS Para. 3.5 98% Compliance Planned Sampling/ Validated

Customer Complaint

ATTACHMENT 1

RECORD OF CUSTOMER COMPLAINT

Date of Complaint: ____________________ Time of Complaint: ___________________

Source of Complaint: __________________ School/Facility: ______________________

Individual: ___________________________ Contract Reference: __________________

Nature of Complaint:

Validation:

Date/Time Contractor Informed: ________________

Action Taken by Contractor:

Date Received/Validated by:

File details come from the government source that posted it. Updated .