Attachment_4_-_Price_Breakout.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- GAOA CAHUILLA RANGER STATION REPLACEMENT
- Solicitation number
- 140L0624R0009
About this file
This document contains an attachment with a price breakout sheet and information on a related federal contract opportunity for replacement of the Cahuilla Ranger Station. The price breakout sheet provides a line item budget for the base facility and three additive alternates, including mobilization, existing conditions assessment, earthwork, landscaping, utilities, concrete, masonry, metals, finishes, fire suppression, plumbing, HVAC, electrical, bonds and overhead. The total proposed cost is listed as $0. The related federal contract opportunity is a solicitation from the Bureau of Land Management to replace the Cahuilla Ranger Station located at the Imperial Sand Dunes in Brawley, California. Interested offerors are invited to attend a pre-proposal site visit on March 7, 2024 at 10:00am PST and should RSVP to the point of contact.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| GAOA Cahuilla Ranger Station Replacement | ||||
| Price Breakout | ||||
| Solicitation 140L0623R0022 | ||||
| Description | Quantity | Unit | Price | |
| Base - Main Facility | ||||
| 1 | Mobilization | 1 | LS | |
| 2 | Existing Conditions | 1 | LS | |
| 3 | Earthwork | 1 | LS | |
| 4 | Landscape | 1 | LS | |
| 5 | Utilities | 1 | LS | |
| 6 | Concrete | 1 | LS | |
| 7 | Masonry | 1 | LS | |
| 8 | Metals | 1 | LS | |
| 9 | Paint, Cabinets and Countertops | 1 | LS | |
| 10 | Thermal and Moisture Control | 1 | LS | |
| 11 | Doors and Windows | 1 | LS | |
| 12 | Finishes | 1 | LS | |
| 13 | Fire Supression | 1 | LS | |
| 14 | Plumbing | 1 | LS | |
| 15 | HVAC | 1 | LS | |
| 16 | Electrical | 1 | LS | |
| 17 | Bonds, Overhead, Profit | 1 | LS | |
| Base Subtotal | $0.00 | |||
| Additives - Listed in Order | ||||
| 18 | Additive 1 - Stabilized Parking | 1 | LS | |
| 19 | Additive 2 - Generator | 1 | LS | |
| 20 | Additive 3 - Decorative Landscape | 1 | LS | |
| Additives Subtotal | $0.00 | |||
| TOTAL | $0.00 |
File details come from the government source that posted it. Updated .