This document outlines detailed Telecommunications Room (TR) standards for the Department of Veterans Affairs (VA) facility infrastructure. The standards specify comprehensive requirements for TR design, including a 10x10 foot secured space with a 9-foot ceiling, restricted access via dual-factor keypad entry, fire-rated perimeter walls, and specific equipment installation guidelines. Key technical specifications include two 45U 4-post racks with vertical and horizontal cable management, Category 6A UTP copper distribution elements, Category 6A permanent link and patch cabling, and a bonding system compliant with ANSI/TIA-607-D standards.

Additional technical requirements include HVAC maintenance at 69 degrees with 50% maximum humidity, specific power infrastructure with UPS and PDU configurations, conduit pathways for telecommunications connectivity, and mandatory documentation such as cable test results, VISIO diagrams, and as-built documentation. The document mandates coordination with AT&T or local exchange carriers for fiber and copper infrastructure installation, with provisions for carrier equipment power during outages. All drop locations must be quad receptacles, cable runs cannot exceed 80 meters, and all documentation must be submitted prior to the first occupancy inspection.

View the file

Other files

File Type Posted
Sample Past Performance Questionnaire_2.docx DOCX document
EXHIBIT C - Security Requirements FSL Level II Oct 2024 02.pdf PDF
EXHIBIT O - Deliverables IAW RLP 36C248-25-R-0052_2.xlsx XLSX spreadsheet
EXHIBIT N - Statement of Work_2.pdf PDF
Amendment 0001 36C24825R0052 0001_2.pdf PDF
36C24825R0052 0002.docx DOCX document
EXHIBIT G - 3517B General Clauses Feb 2025_2 02.pdf PDF
N3 OIT IS Appendix B_2.pdf PDF
EXHIBIT E - GSA Form 1217 - Lessors Annual Cost Statement_2.pdf PDF
EXHIBIT A Global Lease Template L100_2 02.pdf PDF
EXHIBIT A Global Lease Template L100_2.pdf PDF
N.4 Attachment 4 OIT Telecommunication_2.pdf PDF
EXHIBIT D - GSA Form 1364 Proposal to Lease Space_2.pdf PDF
EXHIBIT J -Sample Past Performance Questionnaire_2.pdf PDF
EXHIBIT L - Security Unit Price List FSL II Oct 2024_2.xlsx XLSX spreadsheet
EXHIBIT H - FAR 52.204-24 Representation Digital_2.docx DOCX document
S02 RLP MULTISPECIALTY LEASE 36C248-25-R-0052 - Global Request for Lease Proposal RLP Template R100 March 2025_2.pdf PDF
EXHIBIT K - Tenant Improvements Cost Summary TICS Table Oct 2024_2.xlsx XLSX spreadsheet
EXHIBIT I - GSA Form 12000 Prelease FPLS Evaluation Part A Part B May 2015_2.pdf PDF
EXHIBIT F - 3516 Solicitation Provisions Feb 2025_2.pdf PDF
Amendment 0002b RLP Brevard County Multispecialty 36C24825R0052 0002_2.pdf PDF
EXHIBIT M - Labor Standards Provisions and DOL Wage Determination_2.pdf PDF
N.2 Attachment 2 Physical Security_2.pdf PDF
N.1 VA Interior Design Manual_2.pdf PDF
EXHIBIT B - Agency_s Special Requirements Brevard Multi Specialty Clinic_2.pdf PDF
EXHIBIT M Labor Standards Provisions and DOL Wage Determination.pdf PDF
36C24825R0052 0001.docx DOCX document
EXHIBIT F - 3516 Solicitation Provisions Feb 2025.pdf PDF
36C248-25-R-0052 - Global Request for Lease Proposal RLP Template R100 March 2025.pdf PDF
EXHIBIT C - Security Requirements FSL Level II Oct 2024.pdf PDF
EXHIBIT B - Agency_s Special Requirements Brevard Multi Specialty Clinic.pdf PDF
Attachment 1 VA Interior Design Manual.pdf PDF
EXHIBIT H - FAR 52.204-24 Representation Digital.docx DOCX document
EXHIBIT O - Deliverables IAW RLP 36C248-25-R-0052.xlsx XLSX spreadsheet
EXHIBIT M - Service Labor rates.pdf PDF
Attachment 2 Physical Security.pdf PDF
EXHIBIT I - GSA Form 12000 Prelease FPLS Evaluation Part A Part B May 2015.pdf PDF
EXHIBIT N - Statement of Work.pdf PDF
EXHIBIT J - Sample Request for Past Performance and Questionaire.pdf PDF
36C24825R0052.docx DOCX document
EXHIBIT L - Security Unit Price List FSL II Oct 2024.xlsx XLSX spreadsheet
Attachment 3 OIT Infarstructure Appendix B.pdf PDF
EXHIBIT A - 36C248-25-L-0006 - Global Lease Template L100 Mar 2025.pdf PDF
EXHIBIT G - 3517B General Clauses Feb 2025.pdf PDF
EXHIBIT E - GSA Form 1217 - Lessors Annual Cost Statement.pdf PDF
EXHIBIT K - Tenant Improvements Cost Summary TICS Table Oct 2024.xlsx XLSX spreadsheet
EXHIBIT D - GSA Form 1364 Proposal to Lease Space.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Telecommunications Room (TR) standards: All TR’s are to be installed and configured by a certified data communications engineering firm.

• 10 x 10 TR secured space a minimum of 100 sq. ft., ceiling shall be a minimum of 9 ft above finished floor.

• TR space shall be restricted for use by only VA OI&T equipment and shall not be used for any other purposes.

• TR space shall be controlled by dual factor keypad entry interconnected to the VA Police Monitoring system.

• All perimeter walls shall extend from floor slab to structural system (deck) to prevent up and over access.

• Any penetrations must be sleeved and the appropriate fire rated protection used.

• Provide AC grade ¾” plywood backboard with two coats of fire-resistant paint on three

(3) perimeter walls of the Telecommunications Room for mounting service provider/security/video and similar equipment.

• No windows or other openings.

• Sufficient overhead lighting in front of and behind the network racks.

• Solid core wood door with the veneer to match the other suite doors.

• Lockset shall meet the specification of VA locksmith. Core should be locked to the VA

OIT TR key. If hinged on the exterior hinges shall be welded of pinned.

• HVAC single zoned controllable thermostat in the room able to maintain constant 69 degrees on a 24x7 basis. The relative humidity shall not exceed 50 percent.

• The contractor shall provide and install two (2) 45U 4 post racks Vertical and Horizontal cable management (metal not plastic) with hinged cover door/s. Cable management at top and then between every patch panel (metal not plastic) with hinged cover door/s, vertical cable manager shall be and on the ends of the 2 racks. See Appendix B, sheet 37 of the Infrastructure Standard for Telecommunications Spaces for equipment specifications and suggested equipment (or equivalent).

• Horizontal cable managers are not necessary if angled patch panels are used (see Appendix B, sheet 29, plate 2 of the Infrastructure Standard for Telecommunications Spaces).

• The rack should be bolted to the floor and seismically braced to the building (as required). Provide a minimum of 3 foot of clearance on all four sides of the installed rack.

• The performance category of all installed untwisted shielded pair (UTP) copper distribution elements (permanent link and patch cabling, patch panels, and work area outlet (WAO) jacks) used for network/data transmission shall be Category 6A. ALL

LABELING SHALL BE APPROVED BY OIT PRIOR TO FIRST CABLE INSTALL.

• A minimum of 2 quad drops on opposite walls shall be installed in all areas of the facility. Coordination of drop installation with OIT is requested.

• Install patch panels in the front top 1/3 of the network rack (RUs 31-45). Install rack-mounted uninterruptible power supply (UPS) and power distribution unit (PDU) equipment at the bottom of the network rack, beginning at RU1.

• Provide a minimum of two (2) duplex 120V 20A convenience power outlet with NEMA 5- 15/20 receptacles per wall.

• Power supporting the network rack shall not be wall-mounted to eliminate tripping and power disconnection risks. Provide two (2) each L5-20 locking receptacles on separate circuits for redundancy.

• Provide and install one (1) each single-phase, 120V/120V L5-20 input/L5-20 output rack-mounted UPS supporting up to 1920VA of equipment load and providing ten (10) minutes of battery backup at the 1920VA loading level.

• Provide and install two (2) each zero-U vertical rack PDUs with L5-20 inputs and a minimum of six (6) each NEMA 5-15 receptacles to support IT equipment. One rack PDU shall be powered via the UPS. Example vertical rack PDU meeting these requirements is the AP9551; equivalent units are acceptable. IF generator power is available one UPS and PDU will be connected via the emergency power.

• The contractor shall provide and install a bonding system compliant with the requirements of ANSI/TIA-607-D, to include a Primary Bonding Busbar (PBB), Rack Bonding Busbar (RBB), Telecommunications Equipment Bonding Conductor (6 AWG), and Rack Bonding Conductor (6 AWG). Install RBB in the top rear RU position in the network rack. Network rack and cable tray sections shall be bonded. Unit Bonding Conductors (UBCs) and their connection to the RBB and network equipment by others.

See Appendix B, sheet 24 of the Infrastructure Standard for Telecommunications Spaces for additional guidance.

• The contractor will provide and install conduit pathways from the Telecommunications Room point of demarcation to connect the building with AT&T or the local telephone company vaults.

• The contractor will work with AT&T or the local exchange carrier (LEC) to bring in both fiber and copper infrastructure into the Telecommunications Room. If carrier equipment requires power to ensure the facility has internet during a power outage, install the carrier equipment in the network rack and power via the UPS.

• Questions about telecommunications infrastructure guidance can be directed to OIT.

• Cable tray at the top of each rack bolted to the back wall to support WAO cable weight.

• Cable tray on any wall under the penetrations where cabling enters the TR run to rack tray

• All racks shall be centered 36” off the back & a side wall allowing for additional racks expansion

• All drop locations within the facility shall be quad receptacles (except ceiling mounts dual)

• The longest run cannot exceed 80m (260 ft), allows for patch cables

• Must include cable test results for every run, excel or PDF document

• Must include VISIO diagram of all cables installed

• Must provide as-built documentation prior to first inspection for occupancy.