Attachment 4 - MSS 20220217.xls
XLS spreadsheet 49 KB Posted
- Attached to
- Fire Alarm Systems Replacement Federal contract opportunity
- Solicitation number
- FA301022R0009
About this file
This document contains a material submittals schedule and solicitation for a fire alarm systems replacement project. The material submittals schedule outlines 22 required submittals for the Dolan Hall Fire Alarm/MNS project numbered MAHG20-1109, including certificates of compliance, shop drawings, samples, manufacturer recommendations, warranties, catalog data, and operating instructions. It specifies due dates for submission, receipt, and return of each item.
The related federal contract opportunity is solicitation number FA301022R0009 for the replacement of the fire alarm system at Dolan Hall at Keesler Air Force Base, with an estimated value between $500,000 and $1,000,000. It is set aside for Service-Disabled Veteran-Owned Small Businesses. An on-site visit is scheduled for March 15, 2022 and COVID-19 protocols are in place. Offerors are directed to sections of the solicitation for proposal preparation, evaluation factors, and instructions to acknowledge any amendments. The soliciting agency is the Department of the Air Force Air Education and Training Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 12 - Questions and Answers.pdf | ||
| Solicitation Amendment FA301022R00090001 SF 30.pdf | ||
| Replace Fire Alarm Systems Sign In Sheet.pdf | ||
| Attachment 2 - Specifications_UFCs 20190510.pdf | ||
| Attachment 11 - Notice of Compliance.pdf | ||
| Solicitation - FA301022R0009.pdf | ||
| Attachment 5 - Submittal Procedures 20220217.pdf | ||
| Attachment 6 - Wage Det MS20220050 20220218 Rev1.pdf | ||
| Attachment 7 - Past Performance Reference List.pdf | ||
| Attachment 10 - Brand Name JA 20220225.pdf | ||
| Attachment 3 - DWG 20220217.pdf | ||
| Attachment 8 - Past Performance Questionnaire.pdf | ||
| Attachment 1 - SOW 20220217.pdf | ||
| Attachment 9 - SF 1444.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | ||||||||||||||||||||||
| MAHG20-1109 | Remove/Replace Fire Alarm/MNS Dolan Hall B4116 | Solicitation / Contract Number: WO 82991 | ||||||||||||||||||||
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HazMat Questionnaire | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 2 | HazMat MSDS | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 3 | Hazmat Reporting Entry Form | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 4 | Hazmat Reporting Entry Form | 1 | End of Contract | |||||||||||||||||||
| 5 | Recycling and Landfill Report | 1 | End of Contract | |||||||||||||||||||
| 6 | Warranty (Manufacturer's) | 1 | End of Contract | |||||||||||||||||||
| 7 | 1-Year Warranty (Contractor) | 1 | End of Contract | |||||||||||||||||||
| 8 | Miscellanous Material conduit/wire | 1 | 10 Days after NTP | |||||||||||||||||||
| 9 | Fire Alarm Panel | 1 | 10 Days after NTP | |||||||||||||||||||
| 10 | MNS Panel - Monaco | 1 | 10 days after NTP | |||||||||||||||||||
| 11 | Devices | 1 | 10 days after NTP | |||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .