About this file

This document is an attachment titled "AF 3000 SCHEDULE OF MATERIAL SUBMITTALS (Form 66 Modified)" related to the federal contract opportunity "Install Communication Ducts" with Solicitation Number W50S8Q-24-Q-0012.

The attachment outlines the required material submittals for this project, including items such as a progress schedule, excavation plan, site safety plan, and electrical materials. The contractor must submit these materials within 10 days after the Notice to Proceed (NTP) date. The federal agency involved is the Department of the Army National Guard. This is a small business set-aside contract with a project location at the Springfield OHANG Base in Springfield, OH. The contract value is between $100,000 and $250,000, and Davis-Bacon wage rates apply. Funds for this contract are anticipated to become available in mid-July.

View the file

Other files for this federal contract opportunity

Other files attached to Install Communication Ducts, newest first.
File Type Posted
W50S8Q-24-Q-0012 Comm Ducts.pdf PDF
Attachment 3 - Springfield Base Facility Standards - FINAL - Jul 2021.pdf PDF
Attachment 6 - Base Entry Request.pdf PDF
Attachment 1 - SOW WAAR232015.pdf PDF
Attachment 2 - Drawings Combined.pdf PDF
Attachment 5 - RFI Template.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 3000

SCHEDULE OF MATERIAL SUBMITTALS
( Form 66 Modified)SCHEDULE OF MATERIAL SUBMITTALS
(Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
WAAR232015Install Communication Path
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAMSD SHEETOPERATING INSTRUCTIONSOTHER

SUBMITTAL

REQUIRED DATES DUE

BY__10__

DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Progress Schedule1
2Progress Reports1
3Excavation Plan/Drawings1
5Site Safety Plan1
6Handholes11
7Bore Plan1
9Manholes11
11Electrical material11
12Conduit Size and material11
13Concrete if needed11
14Bollard Materials/Design Specifications11