This document is an attachment titled "AF 3000 SCHEDULE OF MATERIAL SUBMITTALS (Form 66 Modified)" related to the federal contract opportunity "Install Communication Ducts" with Solicitation Number W50S8Q-24-Q-0012.
The attachment outlines the required material submittals for this project, including items such as a progress schedule, excavation plan, site safety plan, and electrical materials. The contractor must submit these materials within 10 days after the Notice to Proceed (NTP) date. The federal agency involved is the Department of the Army National Guard. This is a small business set-aside contract with a project location at the Springfield OHANG Base in Springfield, OH. The contract value is between $100,000 and $250,000, and Davis-Bacon wage rates apply. Funds for this contract are anticipated to become available in mid-July.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S8Q-24-Q-0012 Comm Ducts.pdf | ||
| Attachment 3 - Springfield Base Facility Standards - FINAL - Jul 2021.pdf | ||
| Attachment 6 - Base Entry Request.pdf | ||
| Attachment 1 - SOW WAAR232015.pdf | ||
| Attachment 2 - Drawings Combined.pdf | ||
| Attachment 5 - RFI Template.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 3000
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| ( Form 66 Modified) | SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| WAAR232015 | Install Communication Path | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | MSD SHEET | OPERATING INSTRUCTIONS | OTHER |
SUBMITTAL
REQUIRED DATES DUE
BY__10__
DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||
| APPROVAL | REMARKS | ||||||||
| APPROVED | DISAPPROVED | ||||||||
| 1 | Progress Schedule | 1 | |||||||
| 2 | Progress Reports | 1 | |||||||
| 3 | Excavation Plan/Drawings | 1 | |||||||
| 5 | Site Safety Plan | 1 | |||||||
| 6 | Handholes | 1 | 1 | ||||||
| 7 | Bore Plan | 1 | |||||||
| 9 | Manholes | 1 | 1 | ||||||
| 11 | Electrical material | 1 | 1 | ||||||
| 12 | Conduit Size and material | 1 | 1 | ||||||
| 13 | Concrete if needed | 1 | 1 | ||||||
| 14 | Bollard Materials/Design Specifications | 1 | 1 | ||||||