Attachment 4 - Material Submittals - WAAR152201.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Replace HVAC Squad Ops Bldg Federal contract opportunity
- Solicitation number
- W50S8Q-22-B-0005
- Issued by
- Department of the Army National Guard
About this file
This document contains a solicitation for a federal construction contract opportunity and related submittal requirements. The 178th Wing Contracting Office at Springfield Air National Guard Base is soliciting to replace two rooftop units, four condensing units, four computer room air conditioner units, and two boilers at the Squad Ops Building 146 to upgrade the heating, ventilation, and air conditioning system. The construction period is 365 calendar days from notice to proceed, and interested contractors must be registered in the System for Award Management. The North American Industry Classification Code is 236220 for commercial and institutional building construction with an annual revenue size standard of $39.5 million. The estimated value is between $1 million and $5 million. The solicitation and plans are available on the SAM website. Questions should be directed to the listed contracting specialist by email. Material submittals are due within 10 days of notice to proceed as specified in the attached schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Absract W50S8Q-22-B-0005 30SEP2022.pdf | ||
| Bid Opening Sign-in.pdf | ||
| Attachment 1 - SOW WAAR152201(09232022).docx | DOCX document | |
| RFIs w Responses 09232022.docx | DOCX document | |
| 146 HVAC Site Walk.pdf | ||
| W50S8Q-22-B-0005.pdf | ||
| Attachment 6 - Drawings.pdf | ||
| Attachment 1 - SOW WAAR152201.docx | DOCX document | |
| Attachment 3 - Drawings.pdf | ||
| Attachment 2 - Specifications_Redacted.pdf | ||
| Attachment 5 - RFI Format.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 3000
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| ( Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| WAAR 152201 | REPLACE HVAC SQUAD OPS BLDG 146 | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | |||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | MSD SHEET | OPERATING INSTRUCTIONS |
SUBMITTAL
REQUIRED DATES DUE
BY__10__
DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 1 | Progress Schedule | |||||
| 2 | Progress Reports | |||||
| 3 | Stamped Design Documents | |||||
| 5 | Site Safety Plan | |||||
| 6 | Air Handler Units | |||||
| 7 | Boilers | |||||
| 8 | Piping & Fitting | |||||
| 9 | Insulation | |||||
| 10 | All Valves | |||||
| 11 | Paint | |||||
| 12 | Electrical Fittings | |||||
| 13 | Electrical Wire | |||||
| 14 | Electrical Devices | |||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 |