Attachment_4_Limitations_on_Subcontracting_Breakout.xlsx
XLSX spreadsheet 92 KB Posted
- Attached to
- Red Rock Canyon NCA Admin Building Repairs Federal contract opportunity
- Solicitation number
- 140L0625R0004
About this file
The file is an Excel spreadsheet template for Limitations on Subcontracting Breakout, specifically designed for compliance with FAR 52.219-14(e)(3) or (4) regulations. The template is associated with the Red Rock Canyon NCA Admin Building Repairs & Rodent Remediation solicitation (140L0625R0004) issued by the Department of the Interior Bureau of Land Management National Office. The spreadsheet provides a detailed breakdown mechanism for tracking total proposed amounts, material costs, labor costs, and subcontractor allocations, with specific sections for small business and large business subcontractor labor. The template requires contractors to calculate and demonstrate compliance with self-performance requirements, particularly focusing on labor cost percentages and subcontracting limitations to ensure small business participation and regulatory adherence.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0625R0004_Amd_0003.pdf | ||
| Attachment_7__Past_Performance_Questionnaire-Revised_0003.docx | DOCX document | |
| Sol_140L0625R0004_Amd_0002.pdf | ||
| Attachment10_QuestionsAnswers_1_0002.pdf | ||
| 25R0004_RedRockContPages_7APR25_LM_0001.docx | DOCX document | |
| Sol_140L0625R0004_Amd_0001.pdf | ||
| Attachment_9_Site_Visit_Roster_0001.pdf | ||
| Attachment_1_Scope_of_Work_Drawings_Photos_Jan2025.pdf | ||
| Sol_140L0625R0004.pdf | ||
| Attachment_7_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_3_Price_Breakout_Sheet.pdf | ||
| Attachment_2_DOL_Wage_Determination_NV20240038.pdf | ||
| Attachment_6_RFI_Form.xlsx | XLSX spreadsheet | |
| Attachment_5_SF1442Completion_Instructions_18Jun2024.pdf | ||
| Attachment_8_Brand_Name_Justification.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | |
| Type of Set-Aside | Small Business |
| Performance Period | |
| Required Self-Performance | 15% |
(A) Total Amount Proposed¹
(B) Total Material Cost2
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor3 | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost4 $0.00
| (G) Limitation on Subcontracting Percentage5 | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost |
| *Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1. |
| *Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 4: Total labor costs consist of all contractual costs other than material. |
| *Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .