Attachment10_QuestionsAnswers_1_0002.pdf

PDF 122 KB Posted

Attached to
Red Rock Canyon NCA Admin Building Repairs Federal contract opportunity
Solicitation number
140L0625R0004
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document is a Request for Information (RFI) for the Red Rock Canyon NCA Administration Building Repairs project, solicitation number 140L0625R0004. The RFI contains eight specific questions and responses from the Bureau of Land Management (BLM) regarding project details, including hazardous materials testing, potential mold issues, HVAC equipment, furniture removal, construction debris management, and rodent remediation requirements.

Key details include: No hazardous report has been done for lead/asbestos, mold is not expected but would be handled as a changed condition, existing line sets should not be priced for replacement, and HVAC unit switches will remain in place. BLM will remove specific furniture and paperwork prior to contractor work, and the contractor is responsible for cleaning construction-related debris. For rodent control, BLM will add the building to an existing pest control contract after the contractor completes initial rodent, feces, and urine removal, with the contractor maintaining a rodent-free environment until all contracted work is completed.

View the file

Other files for this federal contract opportunity

Other files attached to Red Rock Canyon NCA Admin Building Repairs, newest first.
File Type Posted
Sol_140L0625R0004_Amd_0003.pdf PDF
Attachment_7__Past_Performance_Questionnaire-Revised_0003.docx DOCX document
Sol_140L0625R0004_Amd_0002.pdf PDF
25R0004_RedRockContPages_7APR25_LM_0001.docx DOCX document
Sol_140L0625R0004_Amd_0001.pdf PDF
Attachment_9_Site_Visit_Roster_0001.pdf PDF
Attachment_1_Scope_of_Work_Drawings_Photos_Jan2025.pdf PDF
Attachment_6_RFI_Form.xlsx XLSX spreadsheet
Attachment_5_SF1442Completion_Instructions_18Jun2024.pdf PDF
Attachment_4_Limitations_on_Subcontracting_Breakout.xlsx XLSX spreadsheet
Attachment_8_Brand_Name_Justification.pdf PDF
Sol_140L0625R0004.pdf PDF
Attachment_7_Past_Performance_Questionnaire.docx DOCX document
Attachment_3_Price_Breakout_Sheet.pdf PDF
Attachment_2_DOL_Wage_Determination_NV20240038.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information

Solicitation:

Title:

Inquiry number

Solicitation / Drawing / Spec / Other

Section/ Sheet/ Page Question Government Response

1 NA NA

Has a Hazordous Report been done to test for lead/asbestos? No

2 SOW 7.6

Is mold expected? If mold is visible and/or discovered, how should we proceed?

The SOW was developed with the expectation that mold is not present. This is based on brief visual inspections performed by other contractors, comments from mold remediation specialists, and BLM's experience. The thought is that the Red Rock environment is dry enough that mold will not be present.

If mold is found it would be considered a changed condition and would have to be dealt with through a contract modification.

3 SOW 7.5 P

The SOW suggests that we avoid removing and replacing line sets. We do not think that the current line sets are compatible with new equipment, however we will check. If they cannot be used, should new line sets be included in the price?

No. New line sets should not be considered in the price.

4 SOW 7.5

Existing HVAC Units have a switch at each location, please explain the purpose of this switch? Do they need to be removed and those areas patched and painted?

The switch is for FCU power. These will not be removed.

5 SOW

7.8 Office

Ceiling

This room is filled with paperwork, most of which is covered in feces. Will these items need to be cleaned and turned over?

BLM will remove these items prior to contractor commencing work.

140L0625R0004

Red Rock Canyon NCA Administration Building Repairs

6 NA NA

There are areas with furniture, will furniture be moved by BLM prior to the start of construction?

Refer to SOW Ex 6:

Area 1 - BLM will remove loose leaf files, bookcases, and conference table prior to Contractor commencing work.

Area 6 - work in this area includes replacement of FCU's, thermostats and crawl space rodent remediation. Area

10 is a sesond story "mezzanine", BLM will remove book cases as needed to allow Contractor to gain access to the ceiling area. The existing electronics - servers, routers, transmitters must remain in place. Area 6 - Remaining cubical walls and desks can be moved as needed by contractor to gain as needed access to FCU's, thermostats and crawl space entry locations. Furniture and bookcases in all other areas are expected to be moved as needed to gain access to FCU's and thermostats, etc.

7 SOW 7.10 a

Clean Adjacent Buildings - Please expound on this epectation. Is this construction debris that may have blown in that area or "dust"? How do we determine if dust is from construction or from something else?

Please advise.

If any construction material or debris orignating from the contractors operations i.e., sawdust, paint, wrapping, wood, piles of demolition material, general trash - food, wrappings, bottles, etc is blown to other areas, that material shall be removed by the Contractor.

8 SOW 7.1

Is there a maintence requirement for the Rodent

Company? For example, once the intial extraction and cleanup is performed will they be required to check the site for X amount of days/months, or does BLM have a pest company that will immediately perform this work perhaps per a maintence IDIQ?

BLM has an existing pest control contract for all facilities at Red Rock excluding the Adminitration Bldg. Once the contractor has completed all tasks related to this solicitation, BLM will add the building to the existing pest control contract. It will be the contractors responsbility to remove rodents, feces and urine from the Admin building during the period of performance.

For instance if the Contractors rodent control specialist clears/cleans the Administration fo rodents, feces, and urine in accordance with the approved work plan before all other contract work has been completed, it will be the Contractors responsibility to maintain a rodent, feces, urine free building unitl all the contracted work has been completed.