Attachment 4 - GFP Report-MIDGETT DS.pdf

PDF 122 KB Posted

Attached to
DOCK-SIDE: USCG MIDGETT FY2024 FQ2
Solicitation number
70Z08523Q2193700
Issued by

About this file

This document is a government property report template to be completed by a contractor performing maintenance on the US Coast Guard Cutter MIDGETT under solicitation number 70Z08523Q2193700. The report requires the contractor to account for all government property received for the contract, including its description, value, and dates received and installed. It also requires the contractor to provide disposition instructions for unused, serviceable, salvage, or scrap property indicating its current location and how it will be returned, turned in, or disposed of. Both the contractor and government property administrator must sign the completed report, which then accompanies the contractor's final invoice.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

Solicitation No.: 70Z08523Q2193700

GOVERNMENT PROPERTY REPORT

The Contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.

CONTRACT NUMBER: 70Z08523............ VESSEL: CGC MIDGETT

CONTRACTOR POINT OF CONTACT:

TELEPHONE NUMBER:

CONTRACTOR’S ADDRESS:

The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.

1 2 3 4 5 6

TYPE OF PROPERTY

RECEIVED (INCLUDE

NAME, DESCRIPTION

, NSN AND SERIAL #)

VALUE OF

PROPERTY

DATE RECEIVED DATE INSTALLED/

CONSUMED

USE THIS BLOCK

TO RECORD :

1.CURRENT

LOCATION OF

PROPERTY IN THE

POSSESSION OF THE

CONTRACTOR FOR

USE DURING THE

AVAILABILITY OR

OTHERWISE BEING

TEMPORARILY HELD

UNTIL BEING

RETURNED

TO/REINSTALLED ON

CUTTER.

2. DISPOSITION

INSTRUCTIONSFOR

UNUSED,

SERVICEABLE,

SALVAGE OR SCRAP

PROPERTY. STATE

WHICH APPLY.

DATE

DISPOSITION

CARRIED OUT

DESCRIPTION NSN\SERIAL\P/N

*Definitions (all property defined below will require disposition instructions):Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.

Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.Scrap – defined as property having no value except for it basic material content.

The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.

PROPERTY ADMINISTRATOR DATE

(Sign at time disposition instructions are given)

CONTRACTOR SIGNATURE DATE (sign after execution of disposition instructions)

NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice. (07/02)

File details come from the government source that posted it. Updated .