Amd 0002 70Z08523Q2193700 signed.pdf
PDF 4 MB Posted
- Attached to
- DOCK-SIDE: USCG MIDGETT FY2024 FQ2
- Solicitation number
- 70Z08523Q2193700
About this file
This document provides the scope of work for a dockside availability period for the USCGC MIDGETT (WMSL 418) in fiscal year 2024. The availability includes cleaning and inspecting four ballast tanks and preparing and coating 33% of tank surfaces. It also includes cleaning and inspecting three fuel oil overflow tanks and one fuel oil storage tank. The contractor must submit inspection reports and maintain quality control documentation. The availability is scheduled to take place in fiscal year 2024 at the vessel's homeport.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
MARCELLA V. BROWN
SUBJECT: RFQ No. 70Z08523QP3002189 Dockside Repairs FY2023 FQ2 USCGC MIDGETT
The purpose of this amendment is to to answer questions brought for the by prospective offerors
See page 2 of this amendment for more details.
United States Coast Guard Surface Forces Logistics Center U.S. Coast Guard Island, Building 55 Alameda CA 94501-5100
Same as Block 6
70Z08523QP3002189
1 4
SEE BLK 16C
09/06/2023
9/26/2023
70Z08523Q2193700 Amendment No. 0002
DESCRIPTION OF AMENDMENT
1. The purpose of this amendment is to answer questions brought for the by prospective offerors.
Q1: We saw your sam.gov posting for the DS USCG Midgett FY24 FQ2. Under the Classification section, the Place of Performance lists “Alameda, CA 94501 USA”. However, further down in your notification under “(F) Date(s) and place(s) of delivery and acceptance” lists the USCG Base in Honolulu, Hawaii, 96819. To clarify, is the place of performance going to be at the USCG Base in Honolulu, HI or will it be in Alameda, CA? Please advise.
A1: The Place of Performance for this action is USCG Base Honolulu, Honolulu, HI 96819
Q2: Which is the correct bid submission date? RFQ+Synopsis+70Z08523Q2193700 states:
(page 2) N) Date, time and place offers are due. Quotes/Offers are due by 29 September 2023, 1:00 PM Hawaii Time. RFQ+70Z08523Q2193700 states: (page 3) SUBMISSION OF QUOTES: E-mail quotations shall be sent to the Contract Specialist and Contracting Officer.
Please indicate 70Z08523Q2193700 in the subject line. Quotes shall be submitted by 28 September 2023, no later than 1:00 PM PT.
A2: The correct bid submission date is 06 October 2023 at 1:00 p.m. Pacific Time.
Q3: Which is the correct Questions submission date? RFQ+Synopsis+70Z08523Q2193700 states: (page 2) (O) Any and all questions regarding this solicitation shall be submitted in writing to the Contract Specialist at William Zittle at William.R.Zittle@uscg.mil and Contracting Officer Marcella V. Brown at Marcella.V.Brown@uscg.mil no later than 29 September 2023, 10:00PM Pacific Time. RFQ+70Z08523Q2193700 states: (page 3) QUESTIONS: Questions regarding this solicitation shall be submitted by 18 September 2023 at 10:00 PT.
A3: See response to Question No. 2.
Q4: Will SF-1449 be provided for this solicitation?
A4: Yes, during the award of the services.
Q5: WORK ITEM 27: Temporary Services, Provide. Will the contractor be able to hook up to pier shore power/water/Air (to hook up Transformer), if so will the power be 480Vs ? This will affect overall cost to have shore power vs generator power. Will air be compressed Air?
A5: The Contractor shall furnish all necessary services IAW SFLC Std Spec 0000 3.2.7.1. Shore power will be available for contractor use. However, the Coast Guard is not responsible for any delays or disruptions to the contract due to Base power outages and similar circumstances.
Q6: WORK ITEM D-001 Tanks (Ballast), Clean and Inspect). It appears from the bid sheet that the Coast Guard is requesting a individual price for each of the four tanks. Will this Work Item be awarded as one item for all of the tanks as unit
A6: The work item will be awarded as one price, but we do request to see the breakdown in price for each individual tank.
Q7: Specification/Schedule of Services mismatch. O-004 Table 1; Schedule of Services lists 3 subCLINs under work item O-004, including tank 5-76-1-F. Statement of Work, O-004 Table 1 does not include this tank. Should KTR include pricing for tank 5-76-1-F?
A7: Please exclude 5-76-1-F from O-004 in the Schedule of Services. It will not be included for partial preservation.
Q8: WI-027; Para 3.3; Temporary Services, Provide. There are no Portable Shower Trailers to rent on the Island, can the CG use Base Facilities to meet this requirement. Portable Toilets are not an issue, would recommend they be pumped twice a week which has worked well on previous availabilities.
A8: The cutter will arrange to have crewmembers use showers on Base.
Q9: WI-013; Para Table 2 Task 10; Anchor Windlass Level 2, Inspect and Repair Task. Task 10 Preservation SFLC STD Spec 5000 3.2.4 requires a SSPC 10 Blast, contractor recommends 33% partial preservation and full overcoat would best suit this level of Inspect and Repair.
A9: The Coast Guard requires full preservation for this inspect and repair. Please submit bid for full preservation per the specification.
Q10: D-26; Para 1.1-3.3.2; Temporary Services, Home Pier. KTR requests confirmation if electrical power will be provided by Cutter for all scope of work in this availability package.
A10: The Cutter will not be responsible for providing electrical power. Contractor shall furnish all necessary services IAW SFLC Std Spec 0000 3.2.7.1. Shore power will be available for contractor use. However, the Coast Guard is not responsible for any delays or disruptions to the contract due to Base power outages and similar circumstances
Q11: WI-013; para 3.1.7; Forward and Aft Capstans, Level 2 Overhaul. Both the Forward and Aft Capstans have various sized fitted bolts, the Forward Capstans Vary +/- 1 1/4 Inches, the Aft Capstans Vary +/- 1 inch, OEM will not support non-fitted bolts, simply the potential of Capstan Movement is possible, should movement occur, misalignment between the ring gear and drive gear would occur with potential catastrophic results. Contractor recommends to Re-Use Existing Bolts.
A11: The Coast Guard requires that the bolts be replaced. Contractor shall replace existing fitted bolts with the ones defined in para 3.1.7 of the specification.
Q12: Would it be possible to have TP 7183B, as it was not in the Reference package. WI 13 Call out to have this reference on the Anchors.
A12: The missing Coast Guard Drawing Technical Publication 7183B, the Government will be providing missing reference to all Contractor’s via DODSAFE for a period of 7 calendar days.
To those vendors who have requested drawings
Work Item 0010, High Purity Water Tank, Clean and Inspect is not Cancelled it is required for this Dockside Services. Per the Schedule of Pricing and Scope of Work, Attachment #2 on Amendment 0001, and Attachment #1 attached to this Amendment 0002..
The time and date set for receipt of proposal remains unchanged on 06 October 2023 at 1:00 p.m.
Pacific Time.
USCGC MIDGETT (WMSL 757)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2024
Developed By: Christian L Jaictin
(Rev-1, 05 September 2023)
MVBrown Typewritten Text 70Z08523Q2193700 Amendment No. 0002
MVBrown Typewritten Text Attachment #1
Scope of Work
USCGC MIDGETT (WMSL-418) DOCKSIDE AVAILABILITY FY2024
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .................................................................................. x Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics ............................................................................................................................ xiii General Requirements WORK ITEM 1: Tanks (Ballast), Clean and Inspect WORK ITEM 2: Tanks (Ballast), Preserve (Partial) WORK ITEM 3: Tanks (MP Fuel Storage and Overflow), Clean and Inspect WORK ITEM 4: Tanks (MP Fuel Overflow), Preserve (Partial) WORK ITEM 5: Circuit Breakers (Draw Out), Inspect and Test WORK ITEM 6: Fire Detection System, Inspect and Test WORK ITEM 7: Miscellaneous System Relief Valves, 5 Year Certification WORK ITEM 8: Reverse Osmosis, System Groom
WORK ITEM 9: CANCELLED <REV 1>
WORK ITEM 10: High Purity Water Tank, Clean And Inspect WORK ITEM 11: Cargo Handling Elevator, Annual Inspection and Test, Perform WORK ITEM 12: Anchor Windlass Flexible Hoses, Renew WORK ITEM 13: Anchor Windlass Level 2, Inspect and Repair WORK ITEM 14: Forward and Aft Capstans, Level 2 Overhaul WORK ITEM 15: Stern Boat Launch and Recovery, Level II WORK ITEM 16: Folding Boom Cranes, Biennial Maintenance, Perform WORK ITEM 17: Helo Hangar Door, Inspect and Test WORK ITEM 18: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 19: Tanks (Sewage Holding Tank), Preserve (100%) WORK ITEM 20: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 21: Tanks (Grey Water Holding), Preserve (100%) WORK ITEM 22: Oily Water Separator (OWS) System, Inspect and Groom WORK ITEM 23: Incinerator, Inspect and Test WORK ITEM 24: Deck Covering (Polymeric), Seal WORK ITEM 25: FWD Gray Water Tank Strainers, Install WORK ITEM 26: Aft Gray Water Piping, Modify WORK ITEM 27: Temporary Services, Provide iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
05SEP23 1 9 Work Item Cancelled
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 418A-WMSL 801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 418A-WMSL-100-001, Rev A, General Arrangement
Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements
Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements
Coast Guard Drawing 418A-WMSL-100-006, Rev A, Inboard and Outboard Profiles
Coast Guard Drawing 418A-WMSL-101-005, Rev A, Shell Expansion Scantlings
Coast Guard Drawing 418A-WMSL-114-001, Rev -, Fairwaters and Rope Guard Installation Details &
L/M
Coast Guard Drawing 418A-WMSL-114-002, Rev N-A, Stern Tube Bossing and Shaft Handling Padeyes
Coast Guard Drawing 418A-WMSL-528-001, Rev A, Plumbing and Interior Deck Drain Diagram
Coast Guard Drawing 418A-WMSL-530-001, Rev C, Potable Water System Diagram
Coast Guard Drawing 418A-WMSL-530-001, Rev C, Potable Water Systems Diagram
Coast Guard Drawing 418A-WMSL-540-001, Rev B, Fuel Oil Diagram
Coast Guard Drawing 418A-WMSL-540-002, Rev A, Diesel Engine and Gas Turbine LO fill, Trans, &
Service System
Coast Guard Drawing 418A-WMSL-542-001, Rev A, JP-5 System Diagram
Coast Guard Drawing 418A-WMSL-551-001, Rev A, Compressed Air Diagram
Coast Guard Drawing 418A-WMSL-555-001, Rev A, AFFF System Diagram
Coast Guard Drawing 418A-WMSL-593-001, Rev A, Bilge & Oil Pollution Control System Diagram
Coast Guard Drawing 418A-WMSL-593-002, Rev B, Sewage System Diagram
Coast Guard Drawing 418A-WMSL-801-001 Rev B, Booklet of General Plan
Coast Guard Drawing 418A-WMSL-801-001, Rev -, Booklet of General Plans
Coast Guard Drawing 418A-WMSL-801-001, Rev A Booklet of General Plans
Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 418A-WMSL-801-004, Rev A, Booklet of General Plans
Coast Guard Drawing 750-WMSL_100_023, Rev J, Unit 2120 Structure – 1st Pltf to 2nd Deck Fr 35 to
Fr 44 (ASC100212)
Coast Guard Drawing 750-WMSL_100_13, Rev L, Unit 1210 Structure – Inner Bottom to 1st Platform –
Fr 10 to Fr 22 (ASC100121) v (Rev-0)
Coast Guard Drawing 750-WMSL_100_17, Rev L, Unit 1310 Structure – Inner Bottom to 1st Platform –
Fr 22 to Fr 35 (ASC100131)
Coast Guard Drawing 750-WMSL_100_23, Rev J, Unit 2120 Structure – 1st Platf to 2nd Deck Fr 35 to Fr
44 (ASC100212)
Coast Guard Drawing 750-WMSL_100_40, Rev L, Unit 3210 Structure – Inner Bot to 1st Platform – Fr
76 to Fr 88 (ASC100321)
Coast Guard Drawing 750-WMSL_100_40, Rev L, Unit 3210 Structure – Inner Bot To 1st Platform – Fr
76 To Fr 88 (ASC100321)
Coast Guard Drawing 750-WMSL_520_1, Rev H, Seawater Cooling System Diagram (ASC520001)
Coast Guard Drawing 750-WMSL-085-012, Rev B, Docking Drawing (NSC 8 SRD) (ASC085007H)
Coast Guard Drawing 750-WMSL-085-025, Rev -, Compartment Areas & Volumes NSC 3 & Follow
(AS3085012)
Coast Guard Drawing 750-WMSL-100-083 Rev A, General Arrangements NSC5 & Follow (AS5100001)
Coast Guard Drawing 750-WMSL-100-083, Rev A, General Arrangements NSC 5 & Follow
Coast Guard Drawing 750-WMSL-100-36, Rev N, Unit 3110 Structure 1st Platform and Below Frs 65-77
(ASC100311)
Coast Guard Drawing 750-WMSL-100-37, Rev H, Unit 3120 Structure – 1st Platf to 2nd Dk- Fr 64 to Fr
76 (ASC100312)
Coast Guard Drawing 750-WMSL-100-531, Rev D, Structural Mods Iwo New Aft Folding Cranes, Hamilton, James & Munro
Coast Guard Drawing 750-WMSL-114-012, Rev -, Rudder and Appendages Drawing (ASC114006H)
(NSC 8)
Coast Guard Drawing 750-WMSL-161-001, Rev F, Strut Castings (ASC161001)
Coast Guard Drawing 750-WMSL-161-002, Rev A, Stern Tube & L/M (ASC161002)
Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication Details Ship
Wide (ASC167001)
Coast Guard Drawing 750-WMSL-169-001, Rev E, HELO Hangar Door Installation (ASC169001)
Coast Guard Drawing 750-WMSL-243-007, Rev E, Propulsion Shafting System Arrangement
(ASC243008)
Coast Guard Drawing 750-WMSL-243-021, Rev -, Propulsion Shafting and Appendage (ASC243001H)
(SRD) (NSC 8)
Coast Guard Drawing 750-WMSL-300-024, Rev C, Unit 2240 - Main Dk Fr 44 to Fr 52 Arr of Elect Eqpt
(ASC300224)
Coast Guard Drawing 750-WMSL-303-002, Rev D, Coordination of Protective Devices (ASC303004)
Coast Guard Drawing 750-WMSL-320-010, Rev G, Power Sys Deck Plan – Second Dk, Aft of Fr 52
(ASC3200016)
Coast Guard Drawing 750-WMSL-320-012, Rev G, Power Sys Deck Plan – Main Deck Fwd of Fr 52
(ASC320007)
Coast Guard Drawing 750-WMSL-320-016, Rev F, Power Sys Deck Plan – 01 Level (ASC320009)
Coast Guard Drawing 750-WMSL-320-038, Rev B, Electrical One Line Diagram (ASC320001)
Coast Guard Drawing 750-WMSL-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes
Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)
Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets
(ASC436010)
vi (Rev-0)
Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic
(ASC436028)
Coast Guard Drawing 750-WMSL-500-002, Rev E, Resilient Hanger Details & Installation (ASC500002)
Coast Guard Drawing 750-WMSL-501-004, Rev D, Misc Independent Tanks Design and Details and
L/M (ASC501004)
Coast Guard Drawing 750-WMSL-505-001, Rev C, List of Relief Valves (ASC505001)
Coast Guard Drawing 750-WMSL-505-006, Rev D, List of Hoses (ASC505006)
Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping And Machinery Insulation And L/M
(ASC508001)
Coast Guard Drawing 750-WMSL-516-002, Rev J, Chilled Water System Diagram (ASC516002)
Coast Guard Drawing 750-WMSL-528-015, Rev E, Plumbing & Interior Deck Drains and Vent System
Unit 2110 (ASC528211-PD)
Coast Guard Drawing 750-WMSL-528-502, Rev -, Forward Gray Water Tank Transfer to Aft Tank
Coast Guard Drawing 750-WMSL-528-503, Rev A, Aft Gray Water Tank Strainer Install
Coast Guard Drawing 750-WMSL-528-504, Rev -, FWD Gray Water Tank Strainer Install
Coast Guard Drawing 750-WMSL-530-001, Rev G, Potable Water Systems Diagram
Coast Guard Drawing 750-WMSL-530-019, Rev D, Potable Water Unit 3120
Coast Guard Drawing 750-WMSL-530-019, Rev E, Potable Water Unit 3120 (ASC 530312-PW)
Coast Guard Drawing 750-WMSL-556-008, Rev D, Anchor Windlass Hydraulic Diagram (ASC556005)
Coast Guard Drawing 750-WMSL-556-019, Rev D, Misc. Hydraulic Piping Unit 1240 (ASC556124-HY)
Coast Guard Drawing 750-WMSL-562-002, Rev C, Rudder (ASC562002)
Coast Guard Drawing 750-WMSL-572-002, Rev D, Elevator Arr & Instl (ASC572002)
Coast Guard Drawing 750-WMSL-582-001, Rev D, Anchoring, Mooring, and Towing Arrangement
(ASC582001)
Coast Guard Drawing 750-WMSL-582-002, Rev H, Mooring and Towing Arrangement (ASC582002)
(Unsigned)
Coast Guard Drawing 750-WMSL-582-503, Rev -, Mooring Arrangement
Coast Guard Drawing 750-WMSL-583-004, Rev K, Stern Launch & Recovery Arrangement & Details
(ASC583004)
Coast Guard Drawing 750-WMSL-583-508, Rev -, Installations IWO Aft Folding Cranes
Coast Guard Drawing 750-WMSL-593-011, Rev B, Solid Waste System Schematic (ASC593026)
Coast Guard Drawing 750-WMSL-801-013, Rev -, Booklet of General Plans (ASC801001H) (SRD)
(NSC 8)
Coast Guard Drawing FL-1702-11, Rev -, Inspection Of Sheaves
Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 7082, SWBS 533, Dec 2020, Potable and Chilled Water Tanks
Coast Guard Technical Publication (TP) 7087, Jan 2022, Pressure Relief Valve
Coast Guard Technical Publication (TP) 7107, SWBS 531, Jun 2007, Reverse Osmosis Water Purifier-
SW6994463CNG
Coast Guard Technical Publication (TP) 7108A, SWBS 573, Jan 2022, Stores Elevator - Model 20833 vii (Rev-0)
Coast Guard Technical Publication (TP) 7165, 7-Feb 2019, Ship Service Switchboards 1S, 2S, 3S and
1SP Shore Power Volume 1
Coast Guard Technical Publication (TP) 7166, 7-Feb 2019, Ship Service Switchboards 1S, 2S, 3S and
1SP Shore Power Volume 2
Coast Guard Technical Publication (TP) 7167, 7-Feb 2019, Ship Service Switchboards 1S, 2S, 3S and
1SP Shore Power Volume 3
Coast Guard Technical Publication (TP) 7181A, SWBS 169, Jan 2022, Helo-Hangar Doors - operation &
Maintenance Manual
Coast Guard Technical Publication (TP) 7183B 21 Feb-19, Anchor Windlass - Model 2344A000
Coast Guard Technical Publication (TP) 7346A, SWBS 593, May 2019, Bilge Water Separator Ultra-Sep
Coast Guard Technical Publication (TP) 7809, SWBS 583, Apr 2021, Boat Retrieval Equipment – Boat
Hoist, Centerline & Carriage Winches
Coast Guard Technical Publication (TP) 7903, SWBS 583, Apr 2019, Aft Boat handling system –Model
FB90-28
Coast Guard Technical Publication (TP) 7946, SWBS 593, May 2021, Incineration Plant - Installation, Operation, Maintenance & Spare Parts
Coast Guard Technical Publication (TP) 9556, SWBS 436, Feb 2022, Fire Detection System (For Hull
755)
Coast Guard Technical Publication (TP) 9557, SWBS 582, Jun 2021, Forward & Aft Capstan – Model
4A0100
Coast Guard Technical Publication (TP) 9701, SWBS 436, Sept 2020, Fire Detection System (For Hull
756)
Coast Guard Technical Publication (TP) 9847, SWBS 436, July 2022, Fire Detection System (For Hull
758)
Fire Prevention and Response
Surface Force Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020 General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2022, General
Requirements for Drawing Preparation
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2022, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard
Electrical Cable Test viii (Rev-0)
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, And Installation
Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2022, Inspect, Test and Recondition AC Synchronous Machines In-Place
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking
OTHER REFERENCES
Air Capable Ship Aviation Bulletin 1L (2009)
American National Standards Institute (ANSI/EASA) AR100-2020, Recommended Practice for the
Repair of Rotating Electrical Apparatus
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2019, Disinfection of Water-Storage Facilities
American Society of Mechanical Engineers (ASME) A17.2, Guide for the Inspection of Elevators, Escalators and Moving Walks.
ANSI/EASA Standard AR100-2015: Recommended Practice for the Repair of Rotating Electrical
Apparatus
ANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical
Apparatus.
ASTM International (ASTM) D1330, 2022, Standard Specification for Rubber Sheet Gaskets
Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2023, Commercial Diving Operations
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
MIL-D-16791G, 2020, Detergents, General Purpose (Liquid, Nonionic)
MIL-PRF-24613A, 2017, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-PRF-24667C w/Int. Amendment 1, 2018, Coating System, Non-Skid, for Roll, Spray, or Self-
Adhering Application ix (Rev-0)
National Fire Protection Association (NFPA) 72, 2019 Edition, National Fire Alarm and Signaling Code
Naval Sea System Command (NAVSEA) Technical Manual (TM) S6435-TP-MMI-010, Rev 5, Angle
Relief Valves BCS Series for Air/Gas Service
Naval Sea Systems Command (NAVSEA) Technical Manual (TM) S6435-TL-MMI-010, Rev 9, Angle
Relief Valve – Type D50
Naval Sea Systems Command (NAVSEA) Technical Manual (TM) S6435-UU-MMO-010, Rev 5, Angle
Relief Valve – Model D50FF
NAVSEA 4730/3, 2004, Driver Hull Inspection Data
NAVSEA S0600-AA-PRO-170, Rev 2 Change A, 2014, Underwater Ship Husbandry Manual, Chapter 17
Inspections
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
NFPA 70E: 2015 Edition Standard for Electrical Safety in the Work Place
Schneider Electric Maintenance and Field Testing Guide for Masterpact NT and NW Circuit Breaker
Instruction Bulletin No.06131b1202 Oct 2014
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2016, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP 11), 2016, Bare Metal Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2018, Power Tool Cleaning
Underwater Ship Husbandry Manuals
USEPA Test Method 1664, Feb 1999, N-Hexane Extractable Material and Silica Cell Treated N-Hexane
Extractable Material by Extraction and Gravimetry.
x (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
9 N Bladder, Water NSN: 4510-01-601-2564 PN:
660603996
1 ea. 2,506.00
15 N Spring, Sheave NSN: 5360-01-672-8829 PN:
P2-965-0024
8 ea. 185.00
15 N Pins, Spring NSN: 5315-01-672-8220 PN:
B2-066-0056
6 ea. 400.00
15 N Pins, Cotter NSN: 5315-01-672-8187 PN:
81-E-0628
6 ea. 1.50
15 N Flat Washer, 2 ½”
Nominal, TY A 5”OD x 2 5/8” ID x 0.238”
THK
NSN: 5310-01-672-8737 PN:
61-E-16
6 ea. 1.50
15 N Jacking Bolt, Sheave NSN: 5306-01-672-9033 PN:
B2-033-0026
8 ea. 275.00
15 N Lubricating Oil, Gear PN: MOBILGEAR SHC 220 40 gal. 100.00
15 N Carriage Winch Brake
Spring
PN: P2-965-0021 Rev A 2 ea. 1,400.00
15 N Carriage Winch Brake
Band Assembly
PN: C2-423-0007 2 ea. 150.00
15 N Centerline Winch
Brake Spring
PN: P2-965-0021 Rev A 1 ea. 1,400.00
15 N Centerline Winch
Brake Band Mounting
Spring
PN: P2-965-0022 NSN: 5360-
01-598-3504
1 ea. 1,750.00
15 N Centerline Winch
Brake Band Assembly
PN: C2-423-0005 NSN: 3950-
01-598-3240
1 ea. 154.00
15 N Centerline Winch
Clutch Shoe
PN: A2-084-0004 2 ea. 2,700.00
15 N Centerline Winch
Torsional Clutch
Spring
PN: P2-965-0020 1 ea. 950.00
15 Y *CB-OTH Mark IV N/A 1 ea. N/A
15 Y *Long Range
Interceptor II
N/A 1 ea. N/A
16 Y *CB-OTH Mark IV
(Coast Guard Drawing
26B-CB-IV-801-001)
N/A 1 ea. N/A
16 Y *Long Range
Interceptor II (LRI-II)
Cutter Boat
N/A 1 ea. N/A
22 Y Monitor, Smart Bilge NSN: 2040-01-600-0112Â 1 ea 4,700.00
26 N Strainer, Sediment (3 NSN: 4730-01-428-3199 2 ea. 5,500.00 xi (Rev-0) inch IPS, Simplex
Basket, 1/2 inch
Perforated) *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Tanks (Ballast), Clean and Inspect
3 Tanks (MP Fuel Storage and Overflow), Clean and Inspect
5 Circuit Breakers (Draw Out), Inspect and Test
6 Fire Detection System, Inspect and Test
8 Reverse Osmosis, System Groom
12 Anchor Windlass Flexible Hoses, Renew
13 Anchor Windlass Level 2, Inspect and Repair
16 Folding Boom Cranes, Biennial Maintenance, Perform
17 Helo Hangar Door, Inspect and Test
18 Sewage Holding Tank(s), Clean and Inspect
20 Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect
22 Oily Water Separator (OWS) System, Inspect and Groom xiii (Rev-0)
PRINCIPAL CHARACTERISTICS
418' WMSL
PHYSICAL
Length overall 418' 0"
Length between perpendiculars 390' 0"
Maximum beam 54' 0"
Beam @ 01 level 47' 9-1/8"
Depth (01 level @ side to baseline) 39' 2-3/4"
01 deck camber foredeck 1/4" in 1'-0"
Minimum berth depth 20' 0"
Height of highest projection Approximately 119'
Draft, design 14.40'
Design displacement 3925 long tons
MACHINERY
Two diesel engines MTU 20V, 20-cylinder 9,730 SHP each
One gas turbine General Electric LM2500; 29,500 SHP
Type of propulsion CODAG
Electrical system 24 Volt DC
Two controllable pitch propellers Rolls-Royce 5 blade, 14' 0" diameter; 229 RPM max
Two reduction gears RENK
One cross connect gear RENK
HULL
Hull material 5086 Aluminum
HSLA-80 Steel
ABS EH 36 Steel
ABS AH 36
Frame spacing
FWD of FR 9 2' 3"
FR 9 to FR 10 6' 9"
FR 10 to FR 98 4' 1"
FR 98 to FR 99 3'-8"
ELECTRICAL
Power Three 1360 kW, 450 V, 60 Hz, 3 Phase, 1800 RPM Caterpillar 3512B diesel engines with Baylor ship service generators
Shore tie cable Seven MIL-C-24368/2 (NATO) shore power receptacles, 400 A each
TANK CAPACITIES
Diesel oil 220,359 gal
Fresh water 12,454 gal
JP-5 Fuel 35,182 gal
1 (Rev-0)
00000_0522_FLT
REC_00000_FLT_Commercial Project @ CG Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire
Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety
Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, seven (7) days before the Arrival Conference.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast
Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3 (Rev-0)
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurements” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5 inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-
Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-
130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with
NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-
Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Weldox 900 are considered the same as those for welding HY-130.
4 (Rev-0)
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is H1869030036.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’
Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous
Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements
5 (Rev-0) and individual position requirements; coordinate removal of waste containers; and maintain the Environmental
Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor must be aware of the following:
3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g. crane services, parking, or facility usage).
3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 8636. Add missing paragraphs between 3.2 and 3.5 of Std Spec 8636 as follows:
“3.3 Access cut boundaries. The Contractor shall ensure that access cuts comply with the requirements and restrictions detailed in the following and in SFLC Std Spec 0740 and referenced codes.
3.3.1 Location of boundaries. Boundaries of access cuts and closure plates shall, in general, be located between principal ship framing, bulkheads, and other structural members and shall be at least three inches from any of these members or from the toes of other welds. A reduction in this three-inch minimum may be approved by the KO on a case-by-case basis provided sufficient clearance is maintained for welding and inspection requirements. The boundaries of access cuts and closure plates should land on existing butts or seams, wherever practicable. The boundaries of prior access cuts should be utilized wherever possible. Boundaries may extend across one or more frames as required for the size of the opening.
3.3.2 Access hole dimensions and arrangements. Holes or access cuts shall be the minimum size necessary and shall be in accordance with the following:
• Rectangular access cuts and closure plates welded into primary hull structure shall be at least 12 inches wide in the lesser dimension.
• For circular access cuts, the minimum diameter shall be 4T, where T = thickness of the involved structural member, but not less than three inches.
• Circular closure plates for access cuts less than two feet in diameter shall be
6 (Rev-0) dished 1/16 to 1/8 inch to allow for shrinkage when welded.
• Corners of rectangular access cuts and closure plates shall have a minimum radius of 6 inches except when a boundary lands on an existing hull longitudinal seam or transverse butt weld.
• Corners at an existing seam or butt shall intersect at a 90-degree angle.
• Cuts that are to cross existing butts or seams shall do so at an angle of 90 degrees plus or minus 15 degrees.
• In primary hull structure, existing welds forming the boundary of a cut shall be cut back 3 inches beyond the toe of the access cut, except that the cut back shall not intersect or cross an existing weld, frame, or structural member. In which case, the cut back may be reduced to a minimum of two inches in length.
• Existing welds crossed by the cut shall not be cut back.
3.3.3 Primary hull structure. Primary Hull Structure includes the shell, main strength decks, principal longitudinal bulkheads, vertical keel, deep web girders and stiffeners designed to withstand the ship bending stress.
3.3.4 Mechanically fastened joints. Welding closer than six inches to a mechanically fastened joint should be avoided. When access cuts cross or come within six inches of a mechanically fastened joint, the fasteners shall be checked for tightness and if necessary, loose fasteners shall be seal welded or removed, and replaced for a distance of 6 inches beyond the edge of the cut. When a cut crosses a mechanically fastened seam the cut plates shall be repaired using single V welds backed with glass tape (MIL-C-20079) to prevent fusion between the mechanically fastened plates.
3.4 Ship integrity maintenance. The Contractor shall maintain safety and ship integrity by installing temporary guarding and coaming, in addition to weathertight and watertight closures. Remove these temporary fabrications after closing the hull access, and grind surfaces flush in way of removals. For shell plating cuts made at or below the waterline where temporary closures are impractical, the Contractor shall secure each vulnerable compartment and subdivision to minimize potential damage to the extent permitted by the scope and urgency of the work.
3.4.1 Guarding. Install temporary guards in accordance with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .