AMD 0001 Attachment 1 Schedule of Services - MIDGETT DS FQ2 FY24.xls
XLS spreadsheet 61 KB Posted
- Attached to
- DOCK-SIDE: USCG MIDGETT FY2024 FQ2
- Solicitation number
- 70Z08523Q2193700
About this file
This document is a schedule of services and pricing for a federal contract opportunity with the U.S. Coast Guard to perform dockside availability work on the USCGC MIDGETT (WMSL-418) in fiscal year 2024's second quarter. The solicitation number is 70Z08523Q2193700. Services include cleaning and inspecting various tanks, systems, and equipment; overhauling capstans; modifying piping; and providing temporary dockside services. Optional preservation work is also specified for some tanks. Pricing is listed by line item but unit prices are blank, to be filled in by bidders. A composite labor rate of $0 will apply to contract changes. The schedule of services and pricing provides details to support the solicitation for dockside maintenance and repair work on the cutter MIDGETT issued by the U.S. Coast Guard.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| SCHEDULE OF PRICING FOR: | |||||
| USCGC MIDGETT (WMSL-418) DOCKSIDE AVAILABILITY FQ2 FY2024 | |||||
| REQUEST FOR QUOTATION: 70Z08523Q2193700 - AMENDMENT 0001 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (Ballast), Clean and Inspect | $0.00 | |||
| D-001A | 5-16-2-W | $0.00 | JOB | 1 | $0.00 |
| D-001B | 5-22-0-W | $0.00 | JOB | 1 | $0.00 |
| D-001C | 5-72-0-W | $0.00 | JOB | 1 | $0.00 |
| D-001D | 5-82-0-W | $0.00 | JOB | 1 | $0.00 |
| D-003 | Tanks (MP Fuel Stowage and Overflow), Clean and Inspect | ||||
| D-003A | 5-32-1-F | $0.00 | JOB | 1 | $0.00 |
| D-003B | 5-32-2-F | $0.00 | JOB | 1 | $0.00 |
| D-003C | 5-76-1-F | $0.00 | JOB | 1 | $0.00 |
| D-005 | Circuit Breakers (Draw Out), Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-006 | Fire Detection System, Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-007 | Miscellaneous System Relief Valves, Inspect And Test | $0.00 | JOB | 1 | $0.00 |
| D-008 | Reverse Osmosis, System Groom | $0.00 | JOB | 1 | $0.00 |
| D-009 | Potable Water Pneumatic Tanks, Clean and Inspect - CANCELLED | $0.00 | JOB | 1 | $0.00 |
| D-010 | High Purity Water Tank, Clean And Inspect | $0.00 | JOB | 1 | $0.00 |
| D-011 | Cargo Handling Elevator, Annual Inspection and Test, Perform | $0.00 | JOB | 1 | $0.00 |
| D-012 | Anchor Windlass Flexible Hoses, Renew | $0.00 | JOB | 1 | $0.00 |
| D-013 | Anchor Windlass Level 2 Inspect and Repair | $0.00 | JOB | 1 | $0.00 |
| D-014 | Forward and Aft Capstans, Level 2 Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-015 | Stern Boat Launch and Recovery, Level II | $0.00 | JOB | 1 | $0.00 |
| D-016 | Folding Boom Cranes, Biennial Maintenance, Perform | $0.00 | JOB | 1 | $0.00 |
| D-017 | Helo Hangar Door, Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-018 | Sewage Holding Tank(s), Clean and Inspect | ||||
| D-018A | 3-37-2-W | $0.00 | JOB | 1 | $0.00 |
| D-020 | Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect | ||||
| D-020A | 3-34-0-W | $0.00 | JOB | 1 | $0.00 |
| D-020B | 5-74-0-W | $0.00 | JOB | 1 | $0.00 |
| D-022 | Oily Water Separator (OWS) System, Inspect and Groom | $0.00 | JOB | 1 | $0.00 |
| D-023 | Incinerator, Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-024 | Deck Covering (Polymeric), Seal | $0.00 | JOB | 1 | $0.00 |
| D-025 | Forward Gray Water Tank Strainer, Install | $0.00 | JOB | 1 | $0.00 |
| D-026 | Aft Gray Water Piping, Modify | $0.00 | JOB | 1 | $0.00 |
| D-027 | Temporary Services, Dockside | $0.00 | JOB | 1 | $0.00 |
| Total Price of Definite Items | $0.00 | ||||
| O-002 | Tanks (Ballast), Preserve “Partial” | $0.00 | |||
| O-002A | 5-16-2-W | $0.00 | JOB | 1 | $0.00 |
| O-002B | 5-22-0-W | $0.00 | JOB | 1 | $0.00 |
| O-002C | 5-72-0-W | $0.00 | JOB | 1 | $0.00 |
| O-002D | 5-82-0-W | $0.00 | JOB | 1 | $0.00 |
| O-004 | Tanks (MP Fuel Storage and Overflow), Preserve “Partial” | $0.00 | |||
| O-004A | 5-32-1-F | $0.00 | JOB | 1 | $0.00 |
| O-004B | 5-32-2-F | $0.00 | JOB | 1 | $0.00 |
| O-004C | 5-76-1-F | $0.00 | JOB | 1 | $0.00 |
| O-019 | Tanks (Sewage Holding Tank), Preserve (100%) | $0.00 | |||
| O-019A | 3-37-2-W | $0.00 | JOB | 1 | $0.00 |
| O-021 | Tanks (Grey Water Holding Tank(s) and Lift Stations), Preserve (100%) | $0.00 | |||
| O-021A | 3-34-0-W | $0.00 | JOB | 1 | $0.00 |
| O-021B | 5-74-0-W | $0.00 | JOB | 1 | $0.00 |
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES | |||||
| Labor Hour Rate | Estimated Hours | Extended Amount | |||
| $ - 0 | 1693 | $ - 0 | |||
| *NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required. |
&C(2/24/2023) Draft-0 - Page &P of &N
File details come from the government source that posted it. Updated .