Attachment 4 Form 66-1.xlsx

XLSX spreadsheet 63 KB Posted

Attached to
Construction of Lateral Drift Trainer at Columbus AFB
Solicitation number
FA302221R0008
Issued by

About this file

This document is a schedule of material submittals for the construction of a new Lateral Drift Trainer facility at Columbus AFB. The scope of work includes providing complete construction documents, specifications, and calculations for the construction of the LDT building. It will also include demolishing an existing Swing Landing Trainer after construction is complete.

The schedule outlines submittal requirements for general, environmental, architectural, civil, mechanical, electrical, special systems, and other/miscellaneous project components. It specifies the item descriptions, specification references, number of copies required, and dates for contractor approval requests and receipts from/to the Civil Engineer. Submittals include shop drawings, samples, data, manuals, plans, calculations, and certificates of compliance for items like demolition, fall protection, hazardous materials handling, architectural elements, cast-in-place concrete, and an airfield waiver for demolition equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General

Project No:Project Title:Date:
OPP#1054914covered lateral drift trainer2-Nov-18
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
1Work/Construction PlanBASIC
2Demolition PlanBASIC
4As-Built DrawingsBASIC
5Progress ScheduleBASIC
6Guarantees and WarrantiesBASIC
8Fall Protection PlanBASIC

AF Form 66 (Substitute) GENERAL Page&Pof&N

SCHEDULE OF MATERIAL SUBMITTALS

Environmental

Project No:Project Title:Date:
OPP#1054914covered lateral drift trainer2-Nov-18
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
9Appropriate SDSBASIC
13Hazardous waste reportBASIC
14Hazardous Material Report (AF Form 3000)BASIC
16Recycled Material Report/Construction Debris reportBASIC
19< 1 acre-Storm Water Pollution Prevention Plan with Best Management Practices IdentifiedBASIC
20Weekly Inspection Reports for Projects < 1 acreBASIC
21EISA 438 report if footprint > 5000 SF.BASIC
24State Notification for Demolition & Renovation 10 day noticeBASIC
25State of Mississippi or DoD certification for termite treatment applicator. Show registration in IPMIMS web program.BASIC

AF Form 66 (Substitute) Environmental Page&Pof &N

SCHEDULE OF MATERIAL SUBMITTALS

Architectural

Project No:Project Title:Date:
OPP#1054914covered lateral drift trainer2-Nov-18
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
25Architectural drawingsBASIC
29Primer/PaintBASIC
30Sealant/CaulkBASIC
50Pre-Engineered Metal Building, foundation and structural design, gutters and downspoutsBASIC
51Equipment ManualsBASIC
52Test ReportsBASIC

AF Form 66 (Substitute) Architectural Page&Pof&N

Civil

Project No:Project Title:Date:
OPP#1054914covered lateral drift trainer2-Nov-18
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
53Structutral plan and calculationsBASIC
54Site/Civil Plan and calculationsBASIC
55concrete reinforcementBASIC
56cast-in-place concreteBASIC
57Test ReportsBASIC

AF Form 66 (Substitute) CIVIL Page&Pof &N

Mechanical

Project No:Project Title:Date:
OPP#1054914covered lateral drift trainer2-Nov-18
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
59NoneBASIC

AF Form 66 (Substitute) Mechanical Page&Pof&N

Electrical

Project No:Project Title:Date:
OPP#1054914covered lateral drift trainer2-Nov-18
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
None

AF Form 66 (Substitute) Electrical Page&Pof &N

Special Systems

Project No:Project Title:Date:
OPP#1054914covered lateral drift trainer2-Nov-18
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
None

AF Form 66 (Substitute) Special Systems Page&Pof &N

Other&Misc

Project No:Project Title:Date:
OPP#1054914covered lateral drift trainer2-Nov-18
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
129Airfield Waiver
Prepared by CE but contractor must supply:
1. Site Plan/Area of Work
2. Type of Equipment to be used
3. Maximum height of equipment
4. Work Hours (24/7, nights, non-flying, etc).
5. Work Schedule

Height of equipment on the airfield

Waiver needed because demolition
of Swing Landing Trainer will be
partially in Clear Zone

AF Form 66 (Substitute) Other and Misc Page&Pof &N