Attachment_4_Environmental Protection Guidelines for Contractors at PHNSY Rev SEP 2019.pdf
PDF 627 KB Posted
- Attached to
- Virginia Class San Tank IDIQ
- Solicitation number
- N32253-25-Q-0003
About this file
This is an environmental protection guidelines document for contractors working on ship projects at Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY&IMF), revised September 2019.
The guidelines detail comprehensive environmental compliance requirements including: appointment of an Environmental Manager with 5 years experience and specific qualifications in areas like RCRA and HAZWOPER; spill prevention and reporting procedures (with 15-minute notification requirements); waste management protocols for hazardous and non-regulated waste; clean water controls for dry dock operations; air quality compliance for painting and HVAC work; and PCB handling requirements. Key operational requirements include daily inspections of work areas, secondary containment for hazardous materials, proper waste segregation and disposal through the Hazardous Waste Facility (Building 1663), and specific procedures for items like fluorescent tubes, gas cylinders, and lead/chromate-containing materials. The document includes contact information for various environmental departments and requires contractors to maintain detailed environmental records, obtain necessary permits, and undergo environmental training through the ECATTS system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .