Construction Documents Summary

This is a set of construction documents for a renovation project at the U.S. Department of Veterans Affairs Medical Center in Cincinnati, Ohio. Project Number 539-26-502 involves renovating the Hot Lab (Room C212) and is classified as Construction Documents phase. The facility is fully sprinklered, and the project is under the oversight of Chief of Engineering Zach Schmidt, with construction issued on 3/26/2026.

The project includes comprehensive demolition and new work phases with strict infection control requirements. Demolition activities include removal of two lavatory fixtures, existing casework, shelving, countertops, a fume hood with all utilities, ceiling grids and tiles, vinyl floor tile and mastic (presumed asbestos-containing materials requiring full abatement procedures per VA Specification 02 82 13.19), and existing medical gas lines. The contractor must treat all suspect materials as ACM unless certified testing confirms otherwise and must coordinate asbestos abatement with Infection Control Risk Assessment (ICRA) Type IV requirements. New work involves installing lockable 0.25" lead-lined base cabinets with stainless steel countertops, upper cabinets, a 750-pound preparation enclosure with 6" exhaust duct connection, a lead-lined sink/waste cabinet with stainless steel sink, new ceiling grid and tiles, new continuous seamless heat-welded resilient sheet flooring, coved base at all walls and casework, and duplex power and data outlets 8 inches above countertops. HVAC requirements mandate 6 air changes per hour total with 2 ACH outside air and negative room pressure maintenance. The facility design specifies specific cabinet finishes, ceramic tile flooring with integral cove base, acoustic ceiling tiles, paint, and plastic laminate upper cabinet finish, with equivalent products from other manufacturers acceptable upon written approval by the Contracting Officer.

View the file

Other files

File Type Posted
36C25026Q0424 0003.docx DOCX document
36C25026Q0424 0002.docx DOCX document
36C25026Q0424 0001.docx DOCX document
Updated drawings and finish schedules.pdf PDF
Attachment 2 - VHA Directive 1192.01, Seasonal Influen..pdf PDF
36C25026Q0424.docx DOCX document
Attachment 7 - Request for Information.docx DOCX document
Attachment 3 - Specifications.pdf PDF
Attachment 5 - Instructions for VAAR 852.219-75.docx DOCX document
Attachment 6 - Contractor EMR Certification Form.docx DOCX document
Attachment 1 - Wage Determination OH20260082 01022026.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

G001

COVER SHEET

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

RENOVATE HOT LAB

CINCINNATI, OHIO (539)

3/26/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

539-26-502

DRAWING INDEX

SHEET #

G001 G101

AD101

A101 A301 A701

SHEET TITLE

COVER SHEET

ICRA PLAN

DEMOLITION PLAN

NEW WORK PLAN

INTERIOR SECTIONS

SCHEDULES

INFECTION CONTROL

CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C

OVERALL PATIENT RISK CATEGORY: HIGH RISK

CLASS OF PRECAUTION MATRIX: TYPE IV ICRA

INFECTION CONTROL

GENERAL NOTES

A. PROVIDE TEMPORARY BARRIER WALLS, BASIS OF DESIGN:

STARC SYSTEMS, FOR ACTIVITIES CAUSING DUST AND/OR

DEBRIS, OR AT EXTERIOR LOCATIONS TO PREVENT PEOPLE

OR WEATHER INTRUSION. MAINTAIN 5' CLEAR IN

CORRIDORS LESS THAN 7'6" WIDE, AND 6' CLEAR IN LARGER

CORRIDORS. PROVIDE ACCESS DOORS AS NECESSARY.

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS

V.A. MEDICAL CENTER

CINCINNATI, OHIO

RENOVATE HOT LAB

PROJECT # 539-26-502

Gamma Camera

C210

Hot Lab C212

Corridor C*2*20

Prep Rm.

C214

Elec.

C209

C211

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

G101

ICRA PLAN

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

RENOVATE HOT LAB

CINCINNATI, OHIO (539)

3/26/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

539-26-502

GENERAL NOTES

A. PROVIDE TEMPORARY BARRIER WALLS, BASIS OF DESIGN:

STARC SYSTEMS, FOR ACTIVITIES CAUSING DUST AND/OR

DEBRIS, OR AT EXTERIOR LOCATIONS TO PREVENT PEOPLE

OR WEATHER INTRUSION. MAINTAIN 5' CLEAR IN

CORRIDORS LESS THAN 7'6" WIDE, AND 6' CLEAR IN LARGER

CORRIDORS. PROVIDE ACCESS DOORS AS NECESSARY.

B. CONTRACTOR SHALL COMPLY WITH ALL VA INFECTION

CONTROL POLICIES AND THE PROJECT‑SPECIFIC ICRA

CLASSIFICATION ISSUED BY THE FACILITY.

C. CONTRACTOR SHALL INSTALL , NEGATIVE PRESSURE

DEVICES, AND PROTECTIVE MEASURES AS REQUIRED FOR

THE DURATION OF CONSTRUCTION.

D. CONTRACTOR SHALL PROVIDE DAILY CLEANING OF ALL

CONSTRUCTION AND ADJACENT AREAS AFFECTED BY

WORK.

E. CONTRACTOR SHALL PROTECT ALL ADJACENT SPACES,

OCCUPIED AREAS, PATHS OF TRAVEL, AND EXISTING

EQUIPMENT FROM DAMAGE OR CONTAMINATION.

PLAN NOTES

1. INSTALL TEMPORARY CONSTRUCTION PARTITION ANTE ROOM TO

MATCH THE ICRA LEVEL REQUIREMENTS.

SCALE | 3/8" = 1' - 0"

ICRA PLAN

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

AD101

DEMOLITION PLAN

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

RENOVATE HOT LAB

CINCINNATI, OHIO (539)

3/26/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

539-26-502

SCALE | 3/4" = 1' - 0"

DEMOLITION PLAN

GENERAL NOTES

A. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE

OVERCURRENT PROTECTIVE DEVICE. COMPLETELY REMOVE ALL

ABANDONED WIRING.

B. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND

CONDUCTORS PASSING THROUGH RENOVATED AREAS AND

SERVICING UNDISTURBED AREAS.

C. PATCH AND REPAIR ALL SURFACES AFFECT BY DEMOLITION TO

MATCH ADJACENT FINISHES.

D. EXISTING FLOOR TILE AND MASTIC ARE PRESUMED TO CONTAIN

ASBESTOS (PACM).

REMOVAL AND DISPOSAL SHALL COMPLY WITH VA SPECIFICATION

02 82 13.19 – ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.

E. EXISTING LABORATORY COUNTERTOP IS PRESUMED TO CONTAIN

ASBESTOS COMPONENTS. REMOVAL AND DISPOSAL SHALL

COMPLY WITH VA SPECIFICATION 02 82 11 – TRADITIONAL

ASBESTOS ABATEMENT.

F. CONTRACTOR SHALL TREAT ALL SUSPECT MATERIALS AS ACM

UNLESS A CERTIFIED HAZARDOUS MATERIALS SURVEY CONFIRMS

OTHERWISE. TESTING, AIR MONITORING, CONTAINMENT, PPE, AND

DISPOSAL SHALL FOLLOW APPLICABLE VA AND REGULATORY

REQUIREMENTS.

G. CONTRACTOR SHALL COORDINATE ASBESTOS ABATEMENT WITH

ICRA REQUIREMENTS AND MAINTAIN ENVIRONMENTAL CONTROLS

THROUGHOUT ABATEMENT AND DEMOLITION.

H. IF ANY ADDITIONAL SUSPECT MATERIALS ARE DISCOVERED

DURING DEMOLITION, CONTRACTOR SHALL STOP WORK IN THE

AFFECTED AREA AND NOTIFY THE COR IMMEDIATELY.

PLAN NOTES

1. REMOVE TWO EXISTING LAVATORY FIXTURES.

2. REMOVE EXISTING BASE AND WALL CASEWORK, SHELVING, AND

COUNTERTOPS.

3. REMOVE EXISTING FUME HOOD INCLUDING ALL UTILITIES,

CONNECTIONS, AND SUPPORTS.

4. REMOVE EXISTING WALL‑MOUNTED PHONE AND ASSOCIATED

CABLING.

5. PROTECT ALL EXISTING LIGHT FIXTURES, DIFFUSERS, SPRINKLER

HEADS, AND DEVICES FOR REINSTALLATION.

6. REMOVE EXISTING CEILING GRID AND TILES IN THEIR ENTIRETY.

7. REMOVE EXISTING VINYL FLOOR TILE AND MASTIC THROUGHOUT

ROOM C212. FLOORING IS PRESUMED ACM AND SHALL BE

REMOVED UNDER FULL ABATEMENT PROCEDURES.

8. REMOVE AND PROPERLY CAP ALL EXISTING MEDICAL GAS LINES

WITHIN ROOM C212 IN ACCORDANCE WITH VA SPECIFICATIONS

AND NFPA 99.

76 8

9'-71 8"

11'-67 8"

12'-27 8"

4'

4'

7'-67 8"

16'-27 8"

9 10 11

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

A101

NEW WORK PLAN

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

RENOVATE HOT LAB

CINCINNATI, OHIO (539)

3/26/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

539-26-502

SCALE | 3/4" = 1' - 0"

NEW WORK PLAN

GENERAL NOTES

A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND

EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.

B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER

REQUIREMENTS AND VA SPECIFICATIONS.

C. CONTRACTOR SHALL PROVIDE BLOCKING, BRACING, AND

SUPPORTS FOR ALL NEW CASEWORK AND EQUIPMENT.

D. FLOORING INSTALLATION SHALL MEET VA MASTER SPEC

REQUIREMENTS (DIVISION 09 – RESILIENT SHEET FLOORING).

E. PROVIDE FLOOR TRANSITIONS WHERE REQUIRED AND

COORDINATE HEIGHTS WITH ADJACENT FLOORS.

F. PROVIDE RIGGING AND LIFTING SERVICES FOR INSTALLATION OF

THE 750‑LB PREPARATION ENCLOSURE.

G. PROVIDE TESTING, ADJUSTING, AND BALANCING (TAB) FOR ALL

HVAC SYSTEMS SERVING THE HOT LAB. CONTRACTOR SHALL

VERIFY 6 ACH TOTAL AND 2 ACH OUTSIDE AIR AND MAINTAIN

NEGATIVE ROOM PRESSURE. SEE AIRFLOW SCHEDULE.

PLAN NOTES

1. INSTALL NEW LOCKABLE 0.25" LEAD‑LINED BASE CABINETS AND

STAINLESS STEEL COUNTERTOP WITH HOLES AS NOTED IN

CABINET SCHEDULE. SEE INTERIOR SECTIONS FOR DETAILS.

2. INSTALL UPPER CABINETS. SEE INTERIOR SECTIONS PLAN AND

CABINET SCHEDULE.

3. INSTALL PREPARATION ENCLOSURE ON NEW COUNTERTOP. SEE

CABINET SCHEDULE

4. PROVIDE 6" EXHAUST DUCT CONNECTION AND BLOWER

ASSEMBLY FOR PREPARATION ENCLOSURE PER MANUFACTURER

REQUIREMENTS.

5. INSTALL NEW LEAD‑LINED SINK/WASTE BASE CABINET AND NEW

STAINLESS‑STEEL SINK. SEE CABINET SCHEDULE

6. PATCH AND PAINT WALLS THROUGHOUT ROOM.

7. INSTALL NEW CEILING GRID AND TILES. SEE FINISH SCHEDULE

8. INSTALL NEW RESILIENT SHEET FLOORING THROUGHOUT ROOM

C212. FLOORING SHALL BE CONTINUOUS, SEAMLESS, AND

HEAT‑WELDED AT ALL SEAMS. SEE FINISH SCHEDULE

9. PROVIDE INTEGRAL COVED BASE AT ALL WALLS, CASEWORK, AND

MILLWORK PER VA FINISH STANDARDS. SEE FINISH SCHEDULE

10. ALL SUBFLOOR SHALL BE PREPARED AFTER ACM REMOVAL,

INCLUDING LEVELING, PATCHING, AND CLEANING TO RECEIVE

NEW SHEET FLOORING.

11. INSTALL DUPLEX POWER OUTLET 8 INCHES ABOVE COUNTERTOP

12. INSTALL DUPLEX DATA DROP 8 INCHES ABOVE COUNTERTOP

A301

A301

CB-1

21.5"

3'-01

2" CB-5CB-5 CB-2 CB-3

EXISTING RACEWAY TO REMAIN

EXISTING DATA OUTLET TO REMAIN

11'-2"

CB-6 CB-4 CB-7

INSTALL NEW

DATA OUTLET

INSTALL DUPLEX

POWER RECEPTACLE

OUTLET

1'

1'

7'-67 8"

EXISTING ACCESS

PANEL TO REMAIN

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

A301

INTERIOR SECTIONS

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

RENOVATE HOT LAB

CINCINNATI, OHIO (539)

3/26/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

539-26-502

SCALE |1" = 1'-0"

INTERIOR SECTIONS1

SCALE |1" = 1'-0"

INTERIOR SECTIONS2

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

A701

REFLECTED CEILING PLAN

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

RENOVATE HOT LAB

CINCINNATI, OHIO (539)

3/26/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

539-26-502

FINISH SCHEDULE - ROOM C212

CODE FINISH TYPE MANUFACTURER PRODUCT/COLOR COMMENTS

ACT-1

CT-1

P-1

WSF-1

ACOUSTIC CEILING TILE

PAINT

WELDED SHEET FLOORING

ARMSTRONG

BENJAMIN MOORE

MANNINGTON

FINE FISSURED, 1728, 24" X 24", WHITE

981 WIND'S BREATH, SATIN

BIOSPEC MD, NEW GLACIER 15364

* EQUIVALENT PRODUCTS FROM OTHER MANUFACTURERS THAT MEET REQUIREMENTS OF TECHNICAL SPECIFICATIONS WILL BE ACCEPTABLE UPON APPROVAL, IN WRITING, BY THE CONTRACTING OFFICER

CERAMIC TILE AMERICAN OLEAN MATTE ALMOND 0087, 6"x6" GROUT: LATICRETE SPECTRALOCK PRO PREMIUM GROUT, COLOR: 85 ALMOND

PL-1 PLASTIC LAMINATE FORMICA NATURAL TEAK 8849058, MATTE FINISH USE FOR UPPER CABINET FINISH

CABINET SCHEDULE - ROOM C212

NAME BOD: MANUFACTURER

Cabinet, W-H, 2 Shelf, 2 DO, Sloping Top, 38Hx48Wx13D Metal wall cabinet with two adjustable shelves. Color:White

Lead-Lined Waste Cabinet (MS-WC-25/30.5-24-36.5) Exterior dimensions - 30.5W x 24D x 36.5H. Color:White

4" INTEGRAL COVE BASE

Lead-Lined Unit Dose Cabinet w/ Sharps Well and Sharps Hole (MS-UDC-25/30.5-24-36.5)

Exterior dimensions - 30.5W x 24D x 36.5H. Color:White

Lead-Lined Phantom Cabinet (MS-PC-25/11.6-24-36) Exterior dimensions - 11.6W x 24D x 36H. Color:White

Lead-Lined PET Unit Dose Cabinet

(MS-PUDC-25/36.5-24.75-36.5)

Exterior dimensions - 36.5W x 24.75D x 36.5H. Color:White

CODE

CB-1

CB-2

CB-3

CB-4

CB-5

COMMENTS

MARSHIELD

MARSHIELD

MARSHIELD

MARSHIELD

Lead-Lined Sink and Waste Cabinet (244-130)

Exterior dimensions - 30.5W x 24.D x 36H. Color:WhiteCB-6 PINESTAR

AIRFLOW SCHEDULE - ROOM C212

ROOM NAME

INDOOR DESIGN

TEMPERATURE

COOLING HEATING

F C F C

INDOOR

RELATIVE

HUMIDITY

% RH

MAX

% RH

MIN

MIN

TOTAL

ACH

MIN

OA

ACH

ROOM AIR

RETURN

EXHAUST G

EXHAUST S

MAX

NOISE

LEVEL

NC

ROOM

AIR

BALANCE

INDIVIDUAL

ROOM CONTROL

TEMP FLOW

75 24 70 21 60 30 6 2 EXHAUST (G) 35 (-) YES CVNMRP1: NUCLEAR MED "HOT LAB"

Lead-Lined Decay and Storage Cabinet

(MS-DSC-25/36.5-24-36.5)

Exterior dimensions - 36.5W x 24.75D x 36.5H. Color:WhiteCB-7 MARSHIELD