Construction Documents Summary
This is a set of construction documents for a renovation project at the U.S. Department of Veterans Affairs Medical Center in Cincinnati, Ohio. Project Number 539-26-502 involves renovating the Hot Lab (Room C212) and is classified as Construction Documents phase. The facility is fully sprinklered, and the project is under the oversight of Chief of Engineering Zach Schmidt, with construction issued on 3/26/2026.
The project includes comprehensive demolition and new work phases with strict infection control requirements. Demolition activities include removal of two lavatory fixtures, existing casework, shelving, countertops, a fume hood with all utilities, ceiling grids and tiles, vinyl floor tile and mastic (presumed asbestos-containing materials requiring full abatement procedures per VA Specification 02 82 13.19), and existing medical gas lines. The contractor must treat all suspect materials as ACM unless certified testing confirms otherwise and must coordinate asbestos abatement with Infection Control Risk Assessment (ICRA) Type IV requirements. New work involves installing lockable 0.25" lead-lined base cabinets with stainless steel countertops, upper cabinets, a 750-pound preparation enclosure with 6" exhaust duct connection, a lead-lined sink/waste cabinet with stainless steel sink, new ceiling grid and tiles, new continuous seamless heat-welded resilient sheet flooring, coved base at all walls and casework, and duplex power and data outlets 8 inches above countertops. HVAC requirements mandate 6 air changes per hour total with 2 ACH outside air and negative room pressure maintenance. The facility design specifies specific cabinet finishes, ceramic tile flooring with integral cove base, acoustic ceiling tiles, paint, and plastic laminate upper cabinet finish, with equivalent products from other manufacturers acceptable upon written approval by the Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026Q0424 0003.docx | DOCX document | |
| 36C25026Q0424 0002.docx | DOCX document | |
| 36C25026Q0424 0001.docx | DOCX document | |
| Updated drawings and finish schedules.pdf | ||
| Attachment 2 - VHA Directive 1192.01, Seasonal Influen..pdf | ||
| 36C25026Q0424.docx | DOCX document | |
| Attachment 7 - Request for Information.docx | DOCX document | |
| Attachment 3 - Specifications.pdf | ||
| Attachment 5 - Instructions for VAAR 852.219-75.docx | DOCX document | |
| Attachment 6 - Contractor EMR Certification Form.docx | DOCX document | |
| Attachment 1 - Wage Determination OH20260082 01022026.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
G001
COVER SHEET
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
RENOVATE HOT LAB
CINCINNATI, OHIO (539)
3/26/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
539-26-502
DRAWING INDEX
SHEET #
G001 G101
AD101
A101 A301 A701
SHEET TITLE
COVER SHEET
ICRA PLAN
DEMOLITION PLAN
NEW WORK PLAN
INTERIOR SECTIONS
SCHEDULES
INFECTION CONTROL
CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C
OVERALL PATIENT RISK CATEGORY: HIGH RISK
CLASS OF PRECAUTION MATRIX: TYPE IV ICRA
INFECTION CONTROL
GENERAL NOTES
A. PROVIDE TEMPORARY BARRIER WALLS, BASIS OF DESIGN:
STARC SYSTEMS, FOR ACTIVITIES CAUSING DUST AND/OR
DEBRIS, OR AT EXTERIOR LOCATIONS TO PREVENT PEOPLE
OR WEATHER INTRUSION. MAINTAIN 5' CLEAR IN
CORRIDORS LESS THAN 7'6" WIDE, AND 6' CLEAR IN LARGER
CORRIDORS. PROVIDE ACCESS DOORS AS NECESSARY.
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
V.A. MEDICAL CENTER
CINCINNATI, OHIO
RENOVATE HOT LAB
PROJECT # 539-26-502
Gamma Camera
C210
Hot Lab C212
Corridor C*2*20
Prep Rm.
C214
Elec.
C209
C211
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
G101
ICRA PLAN
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
RENOVATE HOT LAB
CINCINNATI, OHIO (539)
3/26/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
539-26-502
GENERAL NOTES
A. PROVIDE TEMPORARY BARRIER WALLS, BASIS OF DESIGN:
STARC SYSTEMS, FOR ACTIVITIES CAUSING DUST AND/OR
DEBRIS, OR AT EXTERIOR LOCATIONS TO PREVENT PEOPLE
OR WEATHER INTRUSION. MAINTAIN 5' CLEAR IN
CORRIDORS LESS THAN 7'6" WIDE, AND 6' CLEAR IN LARGER
CORRIDORS. PROVIDE ACCESS DOORS AS NECESSARY.
B. CONTRACTOR SHALL COMPLY WITH ALL VA INFECTION
CONTROL POLICIES AND THE PROJECT‑SPECIFIC ICRA
CLASSIFICATION ISSUED BY THE FACILITY.
C. CONTRACTOR SHALL INSTALL , NEGATIVE PRESSURE
DEVICES, AND PROTECTIVE MEASURES AS REQUIRED FOR
THE DURATION OF CONSTRUCTION.
D. CONTRACTOR SHALL PROVIDE DAILY CLEANING OF ALL
CONSTRUCTION AND ADJACENT AREAS AFFECTED BY
WORK.
E. CONTRACTOR SHALL PROTECT ALL ADJACENT SPACES,
OCCUPIED AREAS, PATHS OF TRAVEL, AND EXISTING
EQUIPMENT FROM DAMAGE OR CONTAMINATION.
PLAN NOTES
1. INSTALL TEMPORARY CONSTRUCTION PARTITION ANTE ROOM TO
MATCH THE ICRA LEVEL REQUIREMENTS.
SCALE | 3/8" = 1' - 0"
ICRA PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
AD101
DEMOLITION PLAN
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
RENOVATE HOT LAB
CINCINNATI, OHIO (539)
3/26/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
539-26-502
SCALE | 3/4" = 1' - 0"
DEMOLITION PLAN
GENERAL NOTES
A. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE
OVERCURRENT PROTECTIVE DEVICE. COMPLETELY REMOVE ALL
ABANDONED WIRING.
B. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND
CONDUCTORS PASSING THROUGH RENOVATED AREAS AND
SERVICING UNDISTURBED AREAS.
C. PATCH AND REPAIR ALL SURFACES AFFECT BY DEMOLITION TO
MATCH ADJACENT FINISHES.
D. EXISTING FLOOR TILE AND MASTIC ARE PRESUMED TO CONTAIN
ASBESTOS (PACM).
REMOVAL AND DISPOSAL SHALL COMPLY WITH VA SPECIFICATION
02 82 13.19 – ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.
E. EXISTING LABORATORY COUNTERTOP IS PRESUMED TO CONTAIN
ASBESTOS COMPONENTS. REMOVAL AND DISPOSAL SHALL
COMPLY WITH VA SPECIFICATION 02 82 11 – TRADITIONAL
ASBESTOS ABATEMENT.
F. CONTRACTOR SHALL TREAT ALL SUSPECT MATERIALS AS ACM
UNLESS A CERTIFIED HAZARDOUS MATERIALS SURVEY CONFIRMS
OTHERWISE. TESTING, AIR MONITORING, CONTAINMENT, PPE, AND
DISPOSAL SHALL FOLLOW APPLICABLE VA AND REGULATORY
REQUIREMENTS.
G. CONTRACTOR SHALL COORDINATE ASBESTOS ABATEMENT WITH
ICRA REQUIREMENTS AND MAINTAIN ENVIRONMENTAL CONTROLS
THROUGHOUT ABATEMENT AND DEMOLITION.
H. IF ANY ADDITIONAL SUSPECT MATERIALS ARE DISCOVERED
DURING DEMOLITION, CONTRACTOR SHALL STOP WORK IN THE
AFFECTED AREA AND NOTIFY THE COR IMMEDIATELY.
PLAN NOTES
1. REMOVE TWO EXISTING LAVATORY FIXTURES.
2. REMOVE EXISTING BASE AND WALL CASEWORK, SHELVING, AND
COUNTERTOPS.
3. REMOVE EXISTING FUME HOOD INCLUDING ALL UTILITIES,
CONNECTIONS, AND SUPPORTS.
4. REMOVE EXISTING WALL‑MOUNTED PHONE AND ASSOCIATED
CABLING.
5. PROTECT ALL EXISTING LIGHT FIXTURES, DIFFUSERS, SPRINKLER
HEADS, AND DEVICES FOR REINSTALLATION.
6. REMOVE EXISTING CEILING GRID AND TILES IN THEIR ENTIRETY.
7. REMOVE EXISTING VINYL FLOOR TILE AND MASTIC THROUGHOUT
ROOM C212. FLOORING IS PRESUMED ACM AND SHALL BE
REMOVED UNDER FULL ABATEMENT PROCEDURES.
8. REMOVE AND PROPERLY CAP ALL EXISTING MEDICAL GAS LINES
WITHIN ROOM C212 IN ACCORDANCE WITH VA SPECIFICATIONS
AND NFPA 99.
76 8
9'-71 8"
11'-67 8"
12'-27 8"
4'
4'
7'-67 8"
16'-27 8"
9 10 11
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
A101
NEW WORK PLAN
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
RENOVATE HOT LAB
CINCINNATI, OHIO (539)
3/26/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
539-26-502
SCALE | 3/4" = 1' - 0"
NEW WORK PLAN
GENERAL NOTES
A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND
EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.
B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER
REQUIREMENTS AND VA SPECIFICATIONS.
C. CONTRACTOR SHALL PROVIDE BLOCKING, BRACING, AND
SUPPORTS FOR ALL NEW CASEWORK AND EQUIPMENT.
D. FLOORING INSTALLATION SHALL MEET VA MASTER SPEC
REQUIREMENTS (DIVISION 09 – RESILIENT SHEET FLOORING).
E. PROVIDE FLOOR TRANSITIONS WHERE REQUIRED AND
COORDINATE HEIGHTS WITH ADJACENT FLOORS.
F. PROVIDE RIGGING AND LIFTING SERVICES FOR INSTALLATION OF
THE 750‑LB PREPARATION ENCLOSURE.
G. PROVIDE TESTING, ADJUSTING, AND BALANCING (TAB) FOR ALL
HVAC SYSTEMS SERVING THE HOT LAB. CONTRACTOR SHALL
VERIFY 6 ACH TOTAL AND 2 ACH OUTSIDE AIR AND MAINTAIN
NEGATIVE ROOM PRESSURE. SEE AIRFLOW SCHEDULE.
PLAN NOTES
1. INSTALL NEW LOCKABLE 0.25" LEAD‑LINED BASE CABINETS AND
STAINLESS STEEL COUNTERTOP WITH HOLES AS NOTED IN
CABINET SCHEDULE. SEE INTERIOR SECTIONS FOR DETAILS.
2. INSTALL UPPER CABINETS. SEE INTERIOR SECTIONS PLAN AND
CABINET SCHEDULE.
3. INSTALL PREPARATION ENCLOSURE ON NEW COUNTERTOP. SEE
CABINET SCHEDULE
4. PROVIDE 6" EXHAUST DUCT CONNECTION AND BLOWER
ASSEMBLY FOR PREPARATION ENCLOSURE PER MANUFACTURER
REQUIREMENTS.
5. INSTALL NEW LEAD‑LINED SINK/WASTE BASE CABINET AND NEW
STAINLESS‑STEEL SINK. SEE CABINET SCHEDULE
6. PATCH AND PAINT WALLS THROUGHOUT ROOM.
7. INSTALL NEW CEILING GRID AND TILES. SEE FINISH SCHEDULE
8. INSTALL NEW RESILIENT SHEET FLOORING THROUGHOUT ROOM
C212. FLOORING SHALL BE CONTINUOUS, SEAMLESS, AND
HEAT‑WELDED AT ALL SEAMS. SEE FINISH SCHEDULE
9. PROVIDE INTEGRAL COVED BASE AT ALL WALLS, CASEWORK, AND
MILLWORK PER VA FINISH STANDARDS. SEE FINISH SCHEDULE
10. ALL SUBFLOOR SHALL BE PREPARED AFTER ACM REMOVAL,
INCLUDING LEVELING, PATCHING, AND CLEANING TO RECEIVE
NEW SHEET FLOORING.
11. INSTALL DUPLEX POWER OUTLET 8 INCHES ABOVE COUNTERTOP
12. INSTALL DUPLEX DATA DROP 8 INCHES ABOVE COUNTERTOP
A301
A301
CB-1
21.5"
3'-01
2" CB-5CB-5 CB-2 CB-3
EXISTING RACEWAY TO REMAIN
EXISTING DATA OUTLET TO REMAIN
11'-2"
CB-6 CB-4 CB-7
INSTALL NEW
DATA OUTLET
INSTALL DUPLEX
POWER RECEPTACLE
OUTLET
1'
1'
7'-67 8"
EXISTING ACCESS
PANEL TO REMAIN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
A301
INTERIOR SECTIONS
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
RENOVATE HOT LAB
CINCINNATI, OHIO (539)
3/26/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
539-26-502
SCALE |1" = 1'-0"
INTERIOR SECTIONS1
SCALE |1" = 1'-0"
INTERIOR SECTIONS2
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
A701
REFLECTED CEILING PLAN
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
RENOVATE HOT LAB
CINCINNATI, OHIO (539)
3/26/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
539-26-502
FINISH SCHEDULE - ROOM C212
CODE FINISH TYPE MANUFACTURER PRODUCT/COLOR COMMENTS
ACT-1
CT-1
P-1
WSF-1
ACOUSTIC CEILING TILE
PAINT
WELDED SHEET FLOORING
ARMSTRONG
BENJAMIN MOORE
MANNINGTON
FINE FISSURED, 1728, 24" X 24", WHITE
981 WIND'S BREATH, SATIN
BIOSPEC MD, NEW GLACIER 15364
* EQUIVALENT PRODUCTS FROM OTHER MANUFACTURERS THAT MEET REQUIREMENTS OF TECHNICAL SPECIFICATIONS WILL BE ACCEPTABLE UPON APPROVAL, IN WRITING, BY THE CONTRACTING OFFICER
CERAMIC TILE AMERICAN OLEAN MATTE ALMOND 0087, 6"x6" GROUT: LATICRETE SPECTRALOCK PRO PREMIUM GROUT, COLOR: 85 ALMOND
PL-1 PLASTIC LAMINATE FORMICA NATURAL TEAK 8849058, MATTE FINISH USE FOR UPPER CABINET FINISH
CABINET SCHEDULE - ROOM C212
NAME BOD: MANUFACTURER
Cabinet, W-H, 2 Shelf, 2 DO, Sloping Top, 38Hx48Wx13D Metal wall cabinet with two adjustable shelves. Color:White
Lead-Lined Waste Cabinet (MS-WC-25/30.5-24-36.5) Exterior dimensions - 30.5W x 24D x 36.5H. Color:White
4" INTEGRAL COVE BASE
Lead-Lined Unit Dose Cabinet w/ Sharps Well and Sharps Hole (MS-UDC-25/30.5-24-36.5)
Exterior dimensions - 30.5W x 24D x 36.5H. Color:White
Lead-Lined Phantom Cabinet (MS-PC-25/11.6-24-36) Exterior dimensions - 11.6W x 24D x 36H. Color:White
Lead-Lined PET Unit Dose Cabinet
(MS-PUDC-25/36.5-24.75-36.5)
Exterior dimensions - 36.5W x 24.75D x 36.5H. Color:White
CODE
CB-1
CB-2
CB-3
CB-4
CB-5
COMMENTS
MARSHIELD
MARSHIELD
MARSHIELD
MARSHIELD
Lead-Lined Sink and Waste Cabinet (244-130)
Exterior dimensions - 30.5W x 24.D x 36H. Color:WhiteCB-6 PINESTAR
AIRFLOW SCHEDULE - ROOM C212
ROOM NAME
INDOOR DESIGN
TEMPERATURE
COOLING HEATING
F C F C
INDOOR
RELATIVE
HUMIDITY
% RH
MAX
% RH
MIN
MIN
TOTAL
ACH
MIN
OA
ACH
ROOM AIR
RETURN
EXHAUST G
EXHAUST S
MAX
NOISE
LEVEL
NC
ROOM
AIR
BALANCE
INDIVIDUAL
ROOM CONTROL
TEMP FLOW
75 24 70 21 60 30 6 2 EXHAUST (G) 35 (-) YES CVNMRP1: NUCLEAR MED "HOT LAB"
Lead-Lined Decay and Storage Cabinet
(MS-DSC-25/36.5-24-36.5)
Exterior dimensions - 36.5W x 24.75D x 36.5H. Color:WhiteCB-7 MARSHIELD