The provided document appears to be Attachment 4. Drawings related to the federal contract opportunity 127EAW24R0025 - GAOA Sawmill & Bear Campground Renovations.

The solicitation is for the renovation of the Sawmill and Bear Campground facilities in the Angeles National Forest, with an estimated project cost between $500,000 and $1,000,000. This is a Total Small Business Set-Aside opportunity. Key details include a mandatory pre-proposal site visit on May 21, 2024, and a deadline of May 22, 2024 for submitting Requests for Information (RFIs). Failure to inspect the site will not be grounds for a claim after contract award. The drawings provided in Attachment 4 likely contain details about the specific renovation work required for the Sawmill and Bear Campground facilities.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

SHEET OF

United States Department of Agriculture Forest Service

GREAT AMERICAN OUTDOORS ACT

SAWMILL & BEAR CAMPGROUND RENOVATIONS

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

RO PROGRAM MANAGER DATE

4/1 5/2

4 1 5:

R

LO

PE

Z C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D W

G;

CALIFORNIA

LOS ANGELES COUNTY

(R05) PACIFIC SOUTHWEST REGION

ANGELES NATIONAL FOREST

SAN GABRIEL MOUNTAINS NATIONAL MONUMENT / LOS ANGELES GATEWAY RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

1 COVERSHEET

2 GENERAL NOTES C-00

3 LIEBRE-SAWMILL RECREATION AREA MAP C-01

4 SAWMILL CAMPGROUND OVERALL SITE PLAN C-02

5 SAWMILL CAMPGROUND LAYOUT 1 C-03

6 SAWMILL CAMPGROUND LAYOUT 2 C-04

7 BEAR CAMPGROUND OVERALL SITE PLAN C-05

8 CAMPGROUND LOOP ROAD DETAIL (BASE & OPTIONS) D-01

9 CAMPGROUND ROADWAY PROFILES D-02

10 CAMPGROUND ROADWAY PROFILES D-03

11 CAMPGROUND ROADWAY PROFILES D-04

12 ROADWAY DETAILS SPILLWAY ASSEMBLY 1 D-05

13 ROADWAY DETAILS SPILLWAY ASSEMBLY 2 D-06

14 ROADWAY DETAILS ROLLING DIP D-07

15 ROADWAY DETAILS CORRUGATED HDPE PIPE D-08

16 SITE AMENITY DETAILS D-09

17 GATE DETAILS PAGE 1 of 2 D-10

18 GATE DETAILS PAGE 2 of 2 D-11

19 SITE AMENITY ACCESSIBILITY LAYOUT D-12

20 SPUR DETAILS TYPICAL LAYOUT D-13

21 SPUR DETAILS PIPE BARRIERS D-14

PROJECT LOCATION

INTERSTATE HIGHWAYS

U.S. HIGHWAYS

OREGON

NEVADA

AR

IZO

N A

MEXICO

C A L I F O

R N I A

Thousand Oaks

Los Angeles

Simi Valley

El Monte

Ontario

Rancho CucamongaPasadena

Burbank

Pomona

Santa Clarita

Palmdale

Arcadia

18138

ANGELES NATIONAL FOREST

Projects

N

DRIVING DIRECTIONS:

FROM ANGELES NATIONAL FOREST SUPERVISOR OFFICE AT 701 N SANTA ANITA AVE, ARCADIA, CA 91006 - GET ON THE I-210 W AND CONTINUE ON THE I-210 W FOR ~32 MILES UNTIL THE I-5 NORTH. DRIVE ON THE I-5 N FOR ~16 MILES AND EXIT AT EXIT 176B LAKE HUGHES ROAD IN CASTAIC. FOLLOW LAKE HUGHES ROAD FOR ~23 MILES UNTIL REACHING PINE CANYON ROAD. TURN LEFT ONTO PINE CANYON ROAD FOR ~5 MILES TO MAKE A SLIGHT LEFT ONTO 7N23. CONTINUE ON 7N23 FOR ~5 MILES TO REACH SAWMILL CAMPGROUND. CONTINUE ON 7N23 FOR ~5 MILES TO REACH BEAR CAMPGROUND.

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text San Diego

AutoCAD SHX Text Sacramento

AutoCAD SHX Text San Francisco

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text Reno

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text Angeles

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text National Forest

General Notes:

1. In addition to these notes, drawings, and specifications, the contractor shall verify and acknowledge the attachment "Mitigation Measures" to ensure compliance with resource protection measures throughout the period of performance for this project.

2. The contractor shall at once report to the Contracting Officer (CO) any errors, inconsistencies or omissions discovered in the contract documents and with information furnished by the U.S. Forest Service. If the contractor performs any construction activity knowing it involved a recognized error, without such notice to the CO, the contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction.

3. All sections mentioned below refer to the Site Amenity specific "CSI Specifications" and "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects", FP-14 latest edition, Federal Highways Administration. Specifications are in US customary units.

3. All instances in contracting documents which refer to "Plans" or "Project Plans", "Drawings" or "Project Drawings" refer to this set of drawings.

4. It is highly recommended that contractor visit the site to clarify site access for all equipment and material deliveries. All existing site features are approximate and shall be verified by the contractor.

5. No water will be available for contractor use. All water is considered incidental to individual work items.

Contractor shall secure their own water source and water secured shall be free of all deleterious material.

6. Prior to construction CO will flag appropriate areas for parking, storing and material stockpile areas.

7. No telephone will be available for contractor use and there is no network connectivity in remote areas.

Contractor is permitted to use sanitary facilities at the Picnic Area.

8. All Staging areas, bypass locations and other areas disturbed by construction activities shall be restored to previous condition as approved by CO.

9. Clean up and jobsite safety: Contractor shall clean up all debris on a daily basis. Contractor shall at all times secure and cover all tools, building materials, shoring and scaffolding in such a manner that persons cannot climb on them or have access to them.

10. Contractor shall remove from Forest Service land all material generated by on-site activities and not used in the final product.

11. Contractor shall submit a schedule of work for approval at least 5 business days prior to start of work.

12. The General Contractor shall control and supervise the performance of the work of various disciplines prior to and during respective performance of work.

13. All construction activities shall be in accordance with caltrans storm water pollution control best management practices. Contractor shall submit to the CO a written storm water management plan at least 5 business days prior to beginning work. In the event of inclement weather, this plan shall include actions to provide protective covering for excavated or soil stockpile areas and all work in progress.

14. Caltrans storm water quality handbook, Construction Site Best Management Practices Manual can be purchased from the California Department of Transportation, Publications Distribution Unit, (916) 445-3520.

Caltrans Best Management Practices, WM-8 Waste Management, procedures shall be followed for all construction activities where slurries containing asphalt concrete or portland cement concrete are generated, such as from saw cutting, grinding, and grooving, and where concrete trucks and other concrete coated equipment are washed on site.

15. Soil erosion and storm water pollution control measures shall be in accordance with Section 157 Soil Erosion Control and Caltrans Best Management Practices (BMP) SC-5 fiber roll. Only temporary fiber roll materials as listed in Caltrans BMP SC-5 are approved for use on this project. All applicable material shall be certified weed and seed free.

16. Topographic maps showing major and minor contours contained herein were obtained from readily available LiDar from publicly available USGS data. No control points have been established by the Forest Service for this project. All construction staking for elevation control, grade control, site layout, structure components and roadway shall be the responsibility of the contractor. Contractor shall stake location of all road components and site amenities for CO approval before any installation takes place. Approval of the construction staking will not relieve the contractor of the responsibility for maintaining the required grades, elevations, and correcting errors, whether the errors are discovered during the actual staking work or in subsequent phases of the contract.

17. There is no pay item for Clearing and Grubbing. The project sites have been cleared for brushing, stumps and trees and there will be no conflicts with any of the developed areas within project limits that would interfere with construction activities. Care shall be taken to avoid damaging all live trees.

18. All excavation for roadways shall be in accordance with Section 204 Excavation and Embankment. All unsuitable or excess excavated material shall be placed in areas within project limits to meet grade requirements of roadways, spurs, site amenitites, or as designated by the CO. Compaction testing for density shall be in accordance with Section 204 or Section 209, and a minimum of five (5) density tests shall be performed each day, or as otherwise approved by the CO. There is no pay item for any imported fill material. If imported fill material is brought in by the contractor, it shall be subject to advance approval by CO if there is an expectation of any change in quantities.

19. Downslope riprap shall be placed in accordance with Section 251 Riprap at locations and arrangements As Shown on Drawings.

20. Written dimensions shall take precedence over scaled dimensions.

23. All work shall be performed in accordance with applicable safety standards.

24. Crushed aggregate base material located per locations on the Drawings shall be a minimum six (6) inches compacted thickness, Caltrans Class 2 Base, 34 inch maxium particle size. Placement and compaction shall be in accordance with Section 301 Untreated Aggregate Courses. If the option to place hot mix asphalt (HMA) is exercised, the crushed aggregate base material shall meet the requirements listed above with the size or Class changing to 1 12 inch maximum particle size.

25. If the option is exercised for Hot Mix Asphalt(HMA), material shall be hot bituminous plant mix (commercial source) per Caltrans 12 inch Maximum (medium). Bituminous binder shall be PG 64-10, 4% to 6% by weight of dry mineral aggregate, Two (2) inch compacted thickness, in accordance with Section 418 Asphalt Pavement Full Depth Patch, Type 2. Only release agents approved by the contracting officer shall be used on this project.

Substances used to coat asphalt transport trucks, asphalt trucks and asphalt spreading equipment shall not contain soap and shall be non-foaming and non-toxic. No diesel fuels or kerosene shall be used for cleaning tools or equipment at any time on this project. All areas where new asphalt ties to old asphalt shall be sealed with SS1H and sand after new asphalt has cured. The SS1H shall be placed to completely cover the seam and six (6) inches beyond the seam on both sides where the new asphalt ties to the existing asphalt.

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 5:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

GENERAL NOTES

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

C-00

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

© 2024 Microsoft Corporation © 2024 TomTom

Ex.

SST

52005195

51755170

705165

00519551905185

520052 0051955190

51855195

90519551

855385

53905395540054055410 54155420

538053

905390538553855390

54005405

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 5:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

LIEBRE-SAWMILL

RECREATION AREA MAP &

7N23 ROAD ACCESS PLAN

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

C-01

ANGELES

NATIONAL

FOREST

BOUNDARY

BEAR CAMPGROUND

7N23 MM9.4

SAWMILL CAMPGROUND

7N23 MM4.4

7N23 MM0.0

ENTRANCE GATE

AT INTERSECTION

WITH PINE CANYON RD;

SUITABLE STAGING AREA

FOR DELIVERIES, PARKING

7N23 MM6.4

INTERSECTION WITH

ATMORE MEADOWS RD

7N23 MM3.1

INTERSECTION WITH

BURNT PEAK RD &

MAXWELL RD

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

P

4+97

0+

0+50

1+00

1+50

2+00

2+50

3+

3+50

4+

4+

4+97

5+00

5+

6+

6+50

7+ 00 7+

8+00

8+50

9+00

9+34 9+34

9+50

10+00

10+50

11+00

11+50

12+00 12+10

12+10

12+50

13+00

13+50

14+00

14+33

+3

+5

+0

+5

+0

+5

+0

+5

+6

17+62

18+00

18+50

+0

+5

20+00

20+50

+0

21+50

22+00

22+27

22+27

22+50

23+00

+5

+0

+5

+0

+5

0 26 +0

+1

Ex.

SST

0+

0+

0+00

0+50 0+60

0+00

0+46

0+

0+

0+

0+

0+00

0+20

0+00

0+38

00 5195 5190

5185 5180

90LEGEND:

. . . . Ex. Picnic Table

. . . . Ex. Fire Ring

. . . . New Food Storage Locker

. . . . Trash Bin

. . . . Ex. Felled Tree Cache

. . . . Felled Tree Barrier

. . . . Information Board

. . . . Site Identification Sign

. . . . Road Destination Sign

. . . . Camp Site Number

. . . . Prop. V-Ditch Riprap Along Natural Drainage Areas

. . . . Prop. Metal Spillway with Riprap Dissipator

. . . . Prop. HDPE Drainage Pipe to be Placed Under Roadway

. . . . Prop.Roadway Section Surfacing for Loop or Spur

. . . . Existing 1-ft & 5-ft Contours from Lidar Topography

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 6:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

SAWMILL CAMPGROUND

OVERALL SITE PLAN

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

C-02

Feet 0 40 80

Ex. Information Board To Be Replaced

Proposed Information Board

Ex. Fire Ring and Picnic Table To Be Relocated

Ex. Fire Ring and Picnic Table To Be Relocated Here

Ex. Picnic Table To Be Relocated

Ex. Picnic Table To Be Relocated Here

Ex. Double Trash Bin

Ex. Single Trash Bin

Proposed Single Trash Bin

Install Overside Drain with Rock Disipator;

Grade Road with Rolling Dip, Typ.

Entrance to Sawmill at 7N23 MM6.4

Entrance Road Typical Roadway

Width is 14-feet

Install New Gate & Remove Existing Guardrail (Option Item)

SAWMILL CG LOOP ROADS & SPURS - ROADWAY WORK ITEMS (FP-14 SPECIFICATIONS)

SEGMENT

STATION

START

STATION

END

LENGTH @

CENTERLINE

(FT)

SEGMENT

WIDTH (FT)

ROADWAY

RECOND. TO

6" DEPTH (SF)

6" SURFACE

AGG. ROCK

BASE (CY)

ADD 4" AGG.

ROCK BASE

(CY) OPTION

V-DITCH RIPRAP

CLASS 4 (CY)

METAL

SPILLWAY OR

HDPE DRAIN

ADD 2" HMA

SUFACE (TONS)

OPTION

ENTRANCE RD 0+00

@7N23 9+34

@LOOP 1

934 14 14,056 260

(OPTION)

(OPTION)

5 5 SPILLWAYS 170

(OPTION)

LOOP 1 9+34 14+33 499 16 7,984 148 99

(OPTION)

70 3 SPILLWAYS

3 HDPE DRAINS

(OPTION)

LOOP 2 14+33

@LOOP 1

22+27 795 16 12,720 236 157

(OPTION)

79 2 HDPE DRAINS 154

(OPTION)

LOOP 3 22+27

@LOOP 2

26+12

@LOOP 1

388 16 6,208 115 77

(OPTION)

60 3 HDPE DRAINS 75

(OPTION)

SPUR 1 0+00

@LOOP 1

0+42 42 16 672 12 8

(OPTION)

-- -- 8

(OPTION)

SPUR 2 0+00

@LOOP 2

0+60 60 16 960 18 12

(OPTION)

-- -- 12

(OPTION)

SPUR 3 0+00

@LOOP 2

0+46 46 16 736 14 9

(OPTION)

-- -- 9

(OPTION)

SPUR 4 0+00

@LOOP 3

0+41 41 16 656 12 8

(OPTION)

-- -- 8

(OPTION)

SPUR 5 0+00

@LOOP 3

0+38 38 16 608 11 8

(OPTION)

-- -- 7

(OPTION)

SPUR 6 0+00

@LOOP 3

0+43 43 16 688 13 8

(OPTION)

-- -- 8

(OPTION)SITE ID SIGN TO BE REPLACED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

P

8+50

9+00

9+34 9+34

9+50

10+00

10+50

11+00

11+50

12+00 12+10

12+10

12+50

13+00

13+50

14+00

14+33

+3

+5

+0

+5

+0

+5

+0

23+00

+5

+0

+5

+0

0 25 +5

+0

+1

Ex.

SST

0+

0+

0+00

0+50 0+60

0+

0+

0+00

0+20

0+00

0+38

5185 5180

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 5:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

SAWMILL CAMPGROUND

LAYOUT PLAN 1

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

C-03

Feet 0 20 40

Ex. Information Board To Be Replaced

Ex. Fire Ring and Picnic Table To Be Relocated

Trash Bin To Be Installed

Ex. Fire Ring and Picnic Table To Be Relocated Here

Prop. Information Board

Ex. Double Trash Bin

5-ft wide V-Ditch with Riprap Class 4

Draining towards Pipe Inlet, Typ.

Place 18" HDPE Pipe

Below Spurs & Parking Areas, Typ.

Install Overside Drain with Rock Disipator;

Grade Road with Rolling Dip, typ.

Spur W idth

16-ft, Typ.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

P

10+50

+5

+0

+5

+0

+5

+6

17+62

18+00

18+50

+0

+5

20+00

20+50

+0

21+50

22+00

22+27

22+27

22+50

23+00

+5

Ex.

SST

0+00

0+50 0+60

0+00

0+46

0+

0+

0+00

0+20

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 5:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

SAWMILL CAMPGROUND

LAYOUT PLAN 2

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

C-04

Feet

0 20 40

Ex. Fire Ring and Picnic Table To Be Relocated

Ex. Fire Ring and Picnic Table To Be Relocated Here

Ex. Picnic Table To Be Relocated

Ex. Picnic Table To Be Relocated Here

Ex. Double Trash Bin

Prop. Information Board

Place 18" Pipe Inlet & HDPE Drain at V-Ditch to Drain on other side of Roadway

5-ft Wide V-Ditch with

Riprap Class 4 , Typ.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

0+00

0+50

1+00

1+50

2+00

2+37

6+

7+

7+

498+00

498+50

2+372+50

3+

3+

4+00

4+50

5+

5+50

5+73

0+00

0+33

0+

0+ 300+00

0+45

-0+00

0+29

0+00

0+34

0+00

0+37

Entrance to Bear CG at 7N23 MM9.4

PLACE NEW GATE

(OPTION ITEM)

LEGEND:

. . . . Ex. Picnic Table

. . . . Ex. Fire Ring

. . . . New Food Storage Locker

. . . . Trash Bin

. . . . Ex. Felled Tree Cache

. . . . Felled Tree Barrier

. . . . Information Board

. . . . Site Identification Sign

. . . . Road Destination Sign

. . . . Camp Site Number

. . . . Prop. V-Ditch Riprap Along Natural Drainage Areas

. . . . Prop. Metal Spillway with Riprap Dissipator

. . . . Prop. HDPE Drainage Pipe to be Placed Under Roadway

. . . . Prop.Roadway Section Surfacing for Loop or Spur

. . . . Existing 1-ft & 5-ft Contours from Lidar Topography

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 6:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

BEAR CAMPGROUND

OVERALL SITE PLAN

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

C-05

SAWMILL CG LOOP ROADS & SPURS - ROADWAY WORK ITEMS (FP-14 SPECIFICATIONS)

SEGMENT

STATION

START

STATION

END

LENGTH @

CENTERLINE

(FT)

SEGMENT

WIDTH (FT)

ROADWAY

RECOND. TO

6" DEPTH (SF)

6" SURFACE

AGG. ROCK

BASE (CY)

ADD 4" AGG.

ROCK BASE

(CY) OPTION

V-DITCH RIPRAP

CLASS 4 (CY)

METAL

SPILLWAY OR

HDPE DRAIN

ADD 2" HMA

SUFACE (TONS)

OPTION

ENTRANCE RD 0+00

@7N23 2+37

@LOOP 1

237 14 3318 62

(OPTION)

(OPTION)

10 2 HDPE DRAINS 40

(OPTION)

LOOP 1 2+37 5+73 336 16 5,376 100 66

(OPTION)

-- -- 65

(OPTION)

SPUR 1 0+00

@LOOP 1

0+33 33 16 528 10 7

(OPTION)

-- -- 6

(OPTION)

SPUR 2 0+00

@LOOP 2

0+30 30 16 480 9 6

(OPTION)

-- -- 6

(OPTION)

SPUR 3 0+00

@LOOP 2

0+45 45 16 720 13 9

(OPTION)

-- -- 9

(OPTION)

SPUR 4 0+00

@LOOP 3

0+30 30 16 480 9 6

(OPTION)

-- -- 6

(OPTION)

SPUR 5 0+00

@LOOP 3

0+34 34 16 544 10 7

(OPTION)

-- -- 7

(OPTION)

SPUR 6 0+00

@LOOP 3

0+37 37 16 592 11 7

(OPTION)

-- -- 7

(OPTION)

ABANDON EX.

NATIVE SURFACE

LOOP; NOT IN

CONTRACT

FIRE RING

TO BE REMOVED

FIRE RING

TO BE REMOVED

PICNIC TABLE

TO BE REMOVED

INFORMATION BOARD TO

BE REMOVED

NEW FOOD STORAGE LOCKERS

TO BE INSTALLED USING

NO-DIG METHOD

NEW HDPE DRAIN PIPES

WITH RIPRAP DISIPATORS

FIRE RING TO BE REMOVED

AND REPLACED

FIRE RINGS TO BE REMOVED

AND REPLACED

FIRE RING TO BE REMOVED

AND REPLACED

FIRE RING TO BE REMOVED

AND REPLACED

FIRE RING TO BE REMOVED

AND REPLACED

NEW FOOD STORAGE LOCKERS

TO BE INSTALLED USING

NO-DIG METHOD

FOREST ROAD DESTINATION

SIGN TO BE INSTALLED

NEW INFORMATION BOARD

TO BE INSTALLED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

LC

LC

LC

LC LC

LC

LC

LC

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 5:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

CAMPGROUND

LOOP ROAD DETAILS

(BASE + OPTIONS)

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-01

V-DITCH CLASS 4 RIPRAP, 18" DEEP X 5' WIDE;

PLACE DRY ANNULAR FINES OR PERMEABLE

AGGREGATE BASE TO FILL VOIDS

BASE: TYPICAL ROADWAY SECTIONS (LOOP ROADS & SPURS)

NOT TO SCALE

DRIVABLE SURFACE

VARIES FROM 12' TO 16' (TYP.)

RECONDITION ROAD TO A DEPTH OF 6 INCHES &

RECOMPACT SUB-BASE WITH EXCAVATED NATIVE SURFACE

GEOTEXTILE FABRIC PLACED ALONG

BOTTOM OF SUBGRADE/ RIPRAP

AGGREGATE SURFACE COURSE,

PERMEABLE (NO FINES) USING 3/4"

AGGREGATE ANGULAR ROCKS

DETAIL NOTES (BASE BID):

1. BASE BID ASSUMES NO HOT MIX ASPHALT, IF OPTION ITEM IS EXERCISED, DO NOT USE THESE DETAILS.

2. USE 3/4" AGGREGATE ROCKS IF NO ASPHALT IS PLACED AS WEARING SURFACE (BASE BID).

3. DEPTH OF AGGREGATE ROCKS VARIES FROM 6" TO 10" IN AREAS WITHOUT DRAINAGE FEATURES; MINIMUM 12" DEPTH IN SECTIONS WITH

DRAINAGE FEATURES (CORRUGATED METAL PIPES).

4. FOR CRUSHED AGGREGATE COURSE , USE PERMEABLE BASE MATERIAL CONFORMING TO FP-14 SUPPLEMENTAL SPECIFICATIONS TABLE 703-2(a).

5. CROSS SLOPE OF AGGREGATE SURFACE WILL NOT EXCEED 2% AT LINEAR SECTIONS OF HORIZONTAL ALIGNMENT AND WILL SLOPE TOWARDS

DIRECTION OF NATURAL SLOPE

6. AT INTERSECTIONS AND CURVES, SLOPE MAY NOT EXCEED MAXIMUM OF 10% IN ANY DIRECTION.

7. REFER TO ROAD PROFILES FOR APPROXIMATE FINAL ELEVATION OF ROAD SURFACE AFTER RECONDITIONING OF ROADS.

8. SEE SPUR ROAD DETAILS TO SEE DRAIN INLET AND OUTLET WHERE NEEDED.

9. USE EXCESS EXCAVATION MATERIAL FOR DITCH & ROAD EMBANKMENTS AS NEEDED; SLOPE REGRADING SHALL BE STEEPER THAN 2:1 SLOPE.

10. SUBMIT THE FOLLOWING TO THE CONTRACTING OFFICER FOR APPROVAL:

10.1. TARGET VALUES & MATERIAL SOURCE FOR RIPRAP AND AGGREGATE BASES COURSES.

2:1 FILL (MAX)

2:1 CUT (MAX) 2:1 FILL (MAX)

VARIES

(DAYLIGHT TO

EXISTING

GROUND) VARIES

(DAYLIGHT TO

EXISTING

GROUND)

5'

(TYP.)

OPTION: TYPICAL ROADWAY SECTIONS (LOOP ROADS & SPURS)

NOT TO SCALE

DETAIL NOTES (OPTION BID):

1. HOT MIX ASPHALT SHALL BE CALTRANS 1/2" TYPE A, PG 64-10, 2" TO 3" DEPTH

2. USE 1 1/2" AGGREGATE ROCKS IF ASPHALT IS PLACED AS WEARING SURFACE (OPTION ITEM BID).

3. DEPTH OF AGGREGATE ROCKS VARIES FROM 5" TO 8" IN AREAS WITHOUT DRAINAGE FEATURES; MINIMUM 12" DEPTH IN SECTIONS WITH DRAINAGE

FEATURES (CORRUGATED METAL PIPES).

4. FOR CRUSHED AGGREGATE COURSE , USE PERMEABLE BASE MATERIAL CONFORMING TO FP-14 SUPPLEMENTAL SPECIFICATIONS TABLE 703-2(a).

5. PAVED SURFACE SHALL DRAIN TOWARDS DIRECTION OF NATURAL SLOPE AND CROSS SLOPE OF WILL BE 2% AT LINEAR SECTIONS OF HORIZONTAL

ALIGNMENT

6. AT INTERSECTIONS AND CURVES, SLOPE MAY NOT EXCEED MAXIMUM OF 10% IN ANY DIRECTION.

7. REFER TO ROAD PROFILES FOR APPROXIMATE FINAL ELEVATION OF ROAD SURFACE AFTER RECONDITIONING OF ROADS.

8. SEE SPUR ROAD DETAILS TO SEE DRAIN INLET AND OUTLET WHERE NEEDED.

9. USE EXCESS EXCAVATION MATERIAL FOR DITCH & ROAD EMBANKMENTS AS NEEDED; SLOPE REGRADING SHALL BE STEEPER THAN 2:1 SLOPE.

10. SUBMIT THE FOLLOWING TO THE CONTRACTING OFFICER FOR APPROVAL:

10.1. TARGET VALUES & MATERIAL SOURCE FOR RIPRAP AND AGGREGATE BASES COURSES.

5'

(TYP.)

EXISTING

GROUND

EXISTING GROUND TO

BE REGRADED

2% TOWARDS DIRECTION OF NATURAL SLOPE

2:1 2:1

EXISTING

GROUND

TYPE 4A LOOP ROAD (V-DITCH BOTH SIDES)4A

TYPE 3A LOOP ROAD (V-DITH ONE SIDE)3A

TYPE 2A LOOP OR SPUR ROAD2A

TYPE 1A LOOP OR SPUR ROAD W BURIED CMP1A

V-DITCH CLASS 4 RIPRAP, 18" DEEP X 5' WIDE;

PLACE DRY ANNULAR FINES OR PERMEABLE

AGGREGATE BASE TO FILL VOIDS

DRIVABLE SURFACE

VARIES FROM 12' TO 16' (TYP.)

RECONDITION ROAD TO A DEPTH OF 6 INCHES &

RECOMPACT SUB-BASE WITH EXCAVATED NATIVE SURFACE

GEOTEXTILE FABRIC PLACED ALONG

BOTTOM OF SUBGRADE/ RIPRAP

AGGREGATE SURFACE COURSE,

PERMEABLE (NO FINES) USING 1-1/2"

AGGREGATE ANGULAR ROCKS

2:1 FILL (MAX)

EXISTING GROUND TO

BE REGRADED

2% TOWARDS DIRECTION OF NATURAL SLOPE

2:1

EXISTING

GROUND

TYPE 4B LOOP ROAD (V-DITCH BOTH SIDES)4B

2:1 FILL (MAX)

2:1 CUT (MAX)

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

5'

(TYP.)

EXISTING

GROUND

2:1

V-DITCH CLASS 4 RIPRAP, 18" DEEP X 5' WIDE;

PLACE DRY ANNULAR FINES OR PERMEABLE

AGGREGATE BASE TO FILL VOIDS

DRIVABLE SURFACE

VARIES FROM 12' TO 16' (TYP.)

RECONDITION ROAD TO A DEPTH OF 6 INCHES &

RECOMPACT SUB-BASE WITH EXCAVATED NATIVE SURFACE

GEOTEXTILE FABRIC PLACED ALONG

BOTTOM OF SUBGRADE/ RIPRAP

AGGREGATE SURFACE COURSE,

PERMEABLE (NO FINES) USING 3/4"

AGGREGATE ANGULAR ROCKS

2:1 FILL (MAX)

EXISTING GROUND TO

BE REGRADED

2% TOWARDS DIRECTION OF NATURAL SLOPE

2:1

EXISTING

GROUND

2:1 FILL (MAX)

2:1 CUT

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

EXISTING

GROUND

TYPE 3B LOOP ROAD (V-DITH ONE SIDE)

V-DITCH CLASS 4 RIPRAP, 18" DEEP X 5' WIDE;

PLACE DRY ANNULAR FINES OR PERMEABLE

AGGREGATE BASE TO FILL VOIDS

DRIVABLE SURFACE

VARIES FROM 12' TO 16' (TYP.)

RECONDITION ROAD TO A DEPTH OF 6 INCHES &

RECOMPACT SUB-BASE WITH EXCAVATED NATIVE SURFACE

GEOTEXTILE FABRIC PLACED ALONG

BOTTOM OF SUBGRADE/ RIPRAP

2:1 FILL (MAX)

EXISTING GROUND TO

BE REGRADED

2% TOWARDS DIRECTION OF NATURAL SLOPE

2:1

EXISTING

GROUND

2:1 FILL (MAX)

2:1 CUT

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

EXISTING

GROUND

HOT MIX ASPHALT WEARING SURFACE

3B

2% TOWARDS DIRECTION OF NATURAL SLOPE

TYPE 2B LOOP OR SPUR ROAD2B

DRIVABLE SURFACE

VARIES FROM 12' TO 16' (TYP.)

RECONDITION ROAD TO A DEPTH OF 6 INCHES &

RECOMPACT SUB-BASE WITH EXCAVATED NATIVE SURFACE

GEOTEXTILE FABRIC PLACED ALONG

BOTTOM OF SUBGRADE/ RIPRAP

AGGREGATE SURFACE COURSE,

PERMEABLE (NO FINES) USING 3/4"

AGGREGATE ANGULAR ROCKS

EXISTING GROUND TO

BE REGRADED

2% TOWARDS DIRECTION OF NATURAL SLOPE

2:1 FILL (MAX)

EXISTING

GROUND

2:1 CUT

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

EXISTING

GROUND

2:1 FILL (MAX)

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

5'

(TYP.)

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

5'

(TYP.)

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

5'

(TYP.)

AGGREGATE SURFACE COURSE,

PERMEABLE (NO FINES) USING 1-1/2"

AGGREGATE ANGULAR ROCKS HOT MIX ASPHALT WEARING SURFACE

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

AGGREGATE SURFACE COURSE,

PERMEABLE (NO FINES) USING 1-1/2"

AGGREGATE ANGULAR ROCKS HOT MIX ASPHALT WEARING SURFACE

HOT MIX ASPHALT WEARING SURFACE

DRIVABLE SURFACE

VARIES FROM 12' TO 20' (TYP.)

RECONDITION ROAD TO A DEPTH OF 6 INCHES &

RECOMPACT SUB-BASE WITH EXCAVATED NATIVE SURFACE GEOTEXTILE FABRIC PLACED ALONG

BOTTOM OF SUBGRADE/ RIPRAP

AGGREGATE SURFACE COURSE,

PERMEABLE (NO FINES) USING 3/4"

AGGREGATE ANGULAR ROCKS

2% MIN. TOWARDS DIRECTION OF NATURAL SLOPE

DRIVABLE SURFACE

VARIES FROM 12' TO 16' (TYP.)

RECONDITION ROAD TO A DEPTH OF 6 INCHES &

RECOMPACT SUB-BASE WITH EXCAVATED NATIVE SURFACE

GEOTEXTILE FABRIC PLACED ALONG

BOTTOM OF SUBGRADE/ RIPRAP

EXISTING GROUND TO

BE REGRADED

EXISTING

GROUND

2:1 CUT

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

EXISTING

GROUND

2:1 FILL (MAX)

VARIES

(DAYLIGHT TO

EXISTING

GROUND)

TYPE 1B LOOP OR SPUR ROAD W BURIED CMP1B

DRIVABLE SURFACE

VARIES FROM 12' TO 20' (TYP.)

RECONDITION ROAD TO A DEPTH OF 6 INCHES &

RECOMPACT SUB-BASE WITH EXCAVATED NATIVE SURFACE GEOTEXTILE FABRIC PLACED ALONG

BOTTOM OF SUBGRADE/ RIPRAP

AGGREGATE SURFACE COURSE,

PERMEABLE (NO FINES) USING 3/4"

AGGREGATE ANGULAR ROCKS

2% MIN. TOWARDS DIRECTION OF NATURAL SLOPE

2' MIN. TO TOP OF CMP INLET

WITH 2:1 MAX SLOPE

2.5' MIN. TO TOP OF CMP OUTLET

WITH 2:1 MAX SLOPE

CLASS 4 GROUTED RIPRAP TO DAYLIGHT ONTO

CMP (BOTH SIDES OF ROADWAY)

PLACE NEW CORRUGATED METAL PIPE (CMP) WITH

DIAMETER RANGING FROM 18" TO 24", PER PLAN

12" MIN.

COVERNEW CMP INLET END SECTION V-DITCH CLASS 4 RIPRAP AT INLET AND

OUTLET OF CMP PER PLAN

2' MIN. TO TOP OF CMP INLET

WITH 2:1 MAX SLOPE

2.5' MIN. TO TOP OF CMP OUTLET

WITH 2:1 MAX SLOPE

CLASS 4 GROUTED RIPRAP TO DAYLIGHT ONTO

CMP (BOTH SIDES OF ROADWAY)

PLACE NEW CORRUGATED METAL PIPE (CMP) WITH

DIAMETER RANGING FROM 18" TO 24", PER PLAN

12" MIN.

COVERNEW CMP INLET END SECTION V-DITCH CLASS 4 RIPRAP AT INLET AND

OUTLET OF CMP PER PLAN

2:1 FILL (MAX)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL CL 1 PROFILE

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 4+97

.0

.0

.0

.0

.3

.3

.1

.1

0+50

.9

.9

.5

.5

.0

.0

.3

.3

.5

.5

1+00

.8

.8

.8

.8

.0

.0

.6

.6

.0

.0

1+50

.6

.6

.0

.0

.0

.0

.9

.9

.9

.9

2+00

.8

.8

.0

.0

.2

.2

.5

.5

.0

.0

2+50

.1

.1

.8

.8

.3

.3

.7

.7

.8

.8

3+00

.0

.0

.9

.9

.0

.0

.5

.5

.4

.4

3+50

.8

.8

.1

.1

.3

.3

.1

.1

.8

.8

4+00

.6

.6

.5

.5

.3

.3

.2

.2

.1

.1

4+50

.9

.9

.0

.0

.0

.0

.0

.0

.9

.9

0.93% -5.42% 17.81% 2.41% -7.82%15.70%

-11.60%

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL CL 2 PROFILE

4+975+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+34

5+00

.6

.6

.3

.3

.0

.0

.6

.6

.1

.1

5+50

.6

.6

.1

.1

.6

.6

.1

.1

.5

.5

6+00

.1

.1

.8

.8

.5

.5

.9

.9

.2

.2

6+50

.7

.7

.0

.0

.4

.4

.7

.7

.0

.0

7+00

.5

.5

.0

.0

.6

.6

.2

.2

.9

.9

7+50

.5

.5

.4

.4

.2

.2

.9

.9

.6

.6

8+00

.1

.1

.7

.7

.0

.0

.5

.5

.6

.6

8+50

.0

.0

.1

.1

.4

.4

.7

.7

.2

.2

9+00

.5

.5

.4

.4

.6

.6

.7

.7

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL CL 3 PROFILE

9+34 9+50 10+00 10+50 11+00 11+50 12+00 12+10

.8

.8

9+50

.0

.0

.4

.4

.7

.7

.2

.2

.9

.9

10+00

.7

.7

.0

.0

.9

.9

.4

.4

.9

.9

10+50

.9

.9

.4

.4

.5

.5

.5

.5

.2

.2

11+00

.7

.7

.3

.3

.6

.6

.9

.9

.1

.1

11+50

.7

.7

.3

.3

.7

.7

.9

.9

.2

.2

12+00

.5

.5

.8

.8

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL CL 4 PROFILE

12+10 12+50 13+00 13+50 14+00 14+33

.3

.3

.9

.9

.2

.2

12+50

.9

.9

.7

.7

.6

.6

.4

.4

.2

.2

13+00

.9

.9

.6

.6

.7

.7

.9

.9

.3

.3

13+50

.9

.9

.9

.9

.7

.7

.7

.7

.9

.9

14+00

.0

.0

.4

.4

.5

.5

.7

.7

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL CL 5 PROFILE

14+33 14+50 15+00 15+50 16+00 16+50 17+00 17+50 17+62

.1

.1

14+50

.6

.6

.9

.9

.4

.4

.0

.0

.5

.5

15+00

.1

.1

.8

.8

.8

.8

.8

.8

.7

.7

15+50

.9

.9

.9

.9

.3

.3

.5

.5

.6

.6

16+00

.6

.6

.4

.4

.1

.1

.0

.0

.0

.0

16+50

.0

.0

.0

.0

.9

.9

.6

.6

.1

.1

17+00

.9

.9

.9

.9

.6

.6

.4

.4

.4

.4

17+50

.6

.6

.9

.9

-31.02%5.63%

-16.02%

5.04%

-15.96%

11.99%

-17.74%

5.77%

-4.43% -0.99%

-6.44%

-3.06% 2.72%

4.75%

9.06%

0.18%

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 6:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

CAMPGROUND

ROADWAY PROFILES

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-02

2109ROADWAY PROFILES (LOOP ROADS)

NOT TO SCALE

SAWMILL CENTERLINE 1 PROFILE (0+00 TO 4+97)1

SAWMILL CENTERLINE 1 PROFILE (4+97 TO 9+34)2

SAWMILL CENTERLINE 2 PROFILE3

SAWMILL CENTERLINE 3 PROFILE4

SAWMILL CENTERLINE 4 PROFILE5

ROLLING DIP

WITH NEW SPILLWAY

ROLLING DIP

WITH NEW SPILLWAY

ROLLING DIP

WITH NEW SPILLWAY

ROLLING DIP

WITH NEW SPILLWAY

ROLLING DIP

WITH NEW SPILLWAY

ROLLING DIP

WITH NEW SPILLWAY

INTERSECTION WITH SAWMILL

CENTERLINE 5 & CENTERLINE 7

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

SPUR 02 ℄ INTERSECTION WITH SAWMILL

CENTERLINE 5 & CENTERLINE 6

SPUR 01 ℄

ENTRANCE ROAD

@7N23

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL CL 6 PROFILE

17+62 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+27

.2

.2

.5

.5

.3

.3

18+00

.5

.5

.8

.8

.4

.4

.9

.9

.7

.7

18+50

.4

.4

.9

.9

.6

.6

.0

.0

.3

.3

19+00

.8

.8

.5

.5

.7

.7

.9

.9

.8

.8

19+50

.7

.7

.2

.2

.5

.5

.0

.0

.3

.3

20+00

.6

.6

.0

.0

.4

.4

.4

.4

.7

.7

20+50

.4

.4

.0

.0

.5

.5

.6

.6

.3

.3

21+00

.5

.5

.6

.6

.7

.7

.0

.0

.7

.7

21+50

.4

.4

.5

.5

.8

.8

.6

.6

.7

.7

22+00

.1

.1

.1

.1

.2

.2

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL CL 7 PROFILE

22+27 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+12

.9

.9

.0

.0

22+50

.7

.7

.7

.7

.5

.5

.2

.2

.9

.9

23+00

.8

.8

.7

.7

.3

.3

.0

.0

.2

.2

23+50

.5

.5

.8

.8

.8

.8

.8

.8

.2

.2

24+00

.0

.0

.5

.5

.1

.1

.4

.4

.7

.7

24+50

.0

.0

.4

.4

.8

.8

.0

.0

.8

.8

25+00

.7

.7

.1

.1

.6

.6

.2

.2

.0

.0

25+50

.5

.5

.3

.3

.3

.3

.8

.8

.0

.0

26+00

.4

.4

.0

.0

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

BEAR CL 1 PROFILE

0+00 0+50 1+00 1+50 2+00 2+37

.9

.9

.1

.1

.0

.0

.8

.8

0+50

.4

.4

.9

.9

.0

.0

.7

.7

.4

.4

1+00

.9

.9

.3

.3

.2

.2

.2

.2

.2

.2

1+50

.3

.3

.3

.3

.1

.1

.8

.8

.6

.6

2+00

.6

.6

.2

.2

.9

.9

.6

.6

-9.54%

-16.60%-5.63% -11.31% -10.34%

-14.90% -0.24% -10.04%

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

BEAR CL 2 PROFILE

2+37 2+50 3+00 3+50 4+00 4+50 5+00 5+50 5+73

.0

.0

2+50

.5

.5

.9

.9

.3

.3

.9

.9

.9

.9

3+00

.9

.9

.9

.9

.0

.0

.1

.1

.7

.7

3+50

.0

.0

.3

.3

.9

.9

.9

.9

.3

.3

4+00

.6

.6

.9

.9

.0

.0

.1

.1

.0

.0

4+50

.9

.9

.7

.7

.2

.2

.8

.8

.0

.0

5+00

.1

.1

.3

.3

.9

.9

.8

.8

.9

.9

5+50

.0

.0

.4

.4

.5

.5

-2.79% -5.43%6.25% -7.46% 7.18% -7.13% 7.35%

2.93% -2.11% -10.38% -1.39% -6.77%

-13.92%7.30% -10.38%

-4.81% 0.47% 3.88% -0.53% -7.24% -0.49% 2.08%

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

CAMPGROUND

ROADWAY PROFILES

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-03

2110ROADWAY PROFILES (LOOP ROADS)

NOT TO SCALE

SAWMILL CENTERLINE 5 PROFILE6

SAWMILL CENTERLINE 6 PROFILE7

BEAR CENTERLINE 1 PROFILE8

BEAR CENTERLINE 2 PROFILE9

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT SPUR 03 ℄

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

SPUR 04 ℄

SPUR 06 ℄

SPUR 05 ℄

INTERSECTION WITH

ENTRANCE ROAD AND

CENTERLINE 2

ENTRANCE ROAD

@7N23

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

SPUR 01 ℄ SPUR 02 SPUR 03 ℄ SPUR 04

SPUR 05 ℄

SPUR 06 ℄

PARKING AT SST

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL SPUR 1 PROFILE

-0+10 0+00 0+500+52

0+00

.1

.1

.0

.0

.9

.9

.2

.2

0+50

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL SPUR 2 PROFILE

-0+10 0+00 0+50 0+70

0+00

.7

.7

.3

.3

.8

.8

.9

.9

.0

.0

0+50

.0

.0

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL SPUR 3 PROFILE

-0+10 0+00 0+50 0+56

0+00

.0

.0

.6

.6

.3

.3

.4

.4

0+50

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL SPUR 4 PROFILE

-0+10 0+00 0+50

0+00

.1

.1

.0

.0

.1

.1

.1

.1

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL SPUR 5 PROFILE

-0+10 0+00 0+48

0+00

.0

.0

.0

.0

.5

.5

.8

.8

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL SPUR 6 PROFILE

-0+10 0+00 0+50 0+53

0+00

.7

.7

.1

.1

.0

.0

.1

.1

0+50

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

SAWMILL SST PKG LOT PROFILE

-0+10 0+00 0+30

0+00

.1

.1

.4

.4

.5

.5

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

BEAR SPUR 1 PROFILE

-0+10 0+00 0+43

0+00

.8

.8

.0

.0

.9

.9

.1

.1

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

BEAR SPUR 2 PROFILE

-0+10 0+00 0+40

0+00

.4

.4

.7

.7

.9

.9

.5

.5

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

BEAR SPUR 3 PROFILE

-0+10 0+00 0+50 0+55

0+00

.2

.2

.0

.0

.7

.7

.5

.5

0+50

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

BEAR SPUR 4 PROFILE

-0+10 0+00 0+39

0+00

.4

.4

.8

.8

.1

.1

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

BEAR SPUR 5 PROFILE

-0+10 0+00 0+44

0+00

.3

.3

.5

.5

.2

.2

.9

.9

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

BEAR SPUR 6 PROFILE

-0+10 0+00 0+47

0+00

.8

.8

.1

.1

.5

.5

.7

.7

-0.86% -5.77% -1.92%

3.37% 0.40% -2.23% 4.86% 1.34% 0.52%

-0.55% 5.28% -0.75% 0.37% -4.73% -4.47%

0.61% -2.14%

1.80% -0.54% 10.07%

5.18% 8.90%

2.16% 0.55% 8.72%

4.96% 7.61%

0.51% 6.07%

-1.24% -1.09% -6.41% -4.68%

-14.41%

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

CAMPGROUND

ROADWAY PROFILES

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-04

2111ROADWAY PROFILES (SPURS)

NOT TO SCALE

PROFILE NOTES:

1. ALL PROFILES TO MATCH MAIN ALIGNMENT AT CENTERLINE OF ROADS.

2. SPUR LENGTHS PER PLAN, GRADING TO DAYLIGHT BEYOND SPUR.

3. FINAL ELEVATION OF WEARING SURFACE WILL BE DEPENDENT ON BASE OR OPTION SELECTION OF

PAVEMENT SECTION FOR AGGREGATE ROCK BASE OR HOT-MIX ASPHALT.

SAWMILL SPUR 1 PROFILE1

SAWMILL SPUR 4 PROFILE4

SAWMILL SPUR 2 PROFILE2 SAWMILL SPUR 3 PROFILE3

SAWMILL SPUR 5 PROFILE5 SAWMILL SPUR 6 PROFILE6

SAWMILL SST PARKING PROFILE7 BEAR SPUR 1 PROFILE8 BEAR SPUR 2 PROFILE9 BEAR SPUR 3 PROFILE10

BEAR SPUR 4 PROFILE11 BEAR SPUR 5 PROFILE12 BEAR SPUR 6 PROFILE13

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

CENTERLINE 3 ℄

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

NEW HDPE 18" PIPE WITH

12" MIN. DEEP ROADWAY

EMBANKMENT

CENTERLINE 4 ℄

CENTERLINE 5 ℄

CENTERLINE 6 ℄ CENTERLINE 6 ℄ CENTERLINE 6 ℄

CENTERLINE 2 ℄ CENTERLINE 2 ℄

CENTERLINE 2 ℄

CENTERLINE 2 ℄

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

ROADWAY DETAILS

SPILLWAY ASSEMBLY 1

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-05

SPILLWAY ASSEMBLIES

NOT TO SCALE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

ROADWAY DETAILS

SPILLWAY ASSEMBLY 2

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-06

SPILLWAY ASSEMBLIES

NOT TO SCALE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

ADJACENT ROADBED.

(2) BERM NOT REQUIRED WHEN DIP EMPTIES ONTO

NATURAL GROUND OR IN INSLOPED ROADS.

B EC

G H

(SEE SCHEDULE)

SKEWED

AS STAKED

DOWN GRADE BREAK WITH

GRADE CROSS SLOPECROSS SLOPE

BERM OR DIKE

12" MIN. HEIGHT

PLAN VIEW

% OF GRADE UNDER 5 8 9 10 1276

"A" LENGTH 45' 50' 55' 60' 65' 70' 80

2.8' 3.0'2.6'2.5'2.3'2.2'2.1'"D" DEPTH

DIMENSION SCHEDULE

PROFILE B.C.E.

PROFILE F.G.H

NOTES:

(1) MATERIAL EXCAVATED SHALL BE PLACED

BY COMPACTION METHOD SPECIFIED FOR

H

F

G D

1/2"/D

B

C E

VARIES VARIES

10' MIN. VERT. CURVES

"A"20'

VARIES "A"

(SEE SCHEDULE)

F

PERSPECTIVE VIEW

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

ROADWAY DETAILS

ROLLING DIP

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-07

ROLLING DIP DETAILS

NOT TO SCALE

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text G

AutoCAD SHX Text

DOWN GRADE

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

ORIGINAL SLOPE LINE

AutoCAD SHX Text

ORIGINAL

AutoCAD SHX Text

GRADE LINE

AutoCAD SHX Text B

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text

20' MIN

AutoCAD SHX Text 10'

AutoCAD SHX Text

(MIN)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

ROADWAY DETAILS

CORRUGATED HDPE PIPE

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-08

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

FRONT and SIDE ELEVATION

FRONT and SIDE ELEVATION

FRONT and SIDE ELEVATION

PLAN VIEW

39"

Existing Native Soil Surface

Existing Native Soil Surface PLAN VIEW1

2 inch x 36 inch rebar

4 inch x 7 inch bolts

NOTES:

1. Details are for general reference.

They may not accurately reflect the exact site amenity models that are planned for purchase.

2. Native soil surrounding amenities should be compacted to a firm and stable surface. Please see campsite accessibility layout diagram on sheet D-11.

Existing Native Soil Surface

6 inch x 6 inch treated wood timbers

6 inch x 6 inch treated wood timbers

NOTE:

1. Details are for general installation reference. Please check with ANF staff about exact food locker size and what length timbers will be required.

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

SITE AMENITY DETAILS

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-09

TRASH CAN RECEPTACLES WITH CONCRETE PAD1

FOOD LOCKERS WITH CONCRETE PAD

INSTALLATION METHOD FOR SAWMILL CG2B

INFORMATION BOARD3

ACCESSIBLE FIRE RING4

FOOD LOCKERS WITH NO-DIG INSTALLATION

METHOD FOR BEAR CG2A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

GATE DETAIL PAGE 1 of 2

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-10

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/1 5/2

4 1 7:

RL

OP

EZ

C:

\U

SE

RS

\R

LO

PE

Z\

DO

CU

ME

NT

S\

GA

OA

S

AW

MI

LL

B

EA

R

CG

S

.D

W G

(R05)

PACIFIC SOUTHWEST REGION

GAOA

SAWMILL & BEAR

CAMPGROUND

RENOVATIONS

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY

RANGER DISTRICT

GATE DETAIL PAGE 2 of 2

4/01/2024

.DWG

ROSADO/HERNANDEZ

ANF

R. LOPEZ

D-11

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

NOTES:

1. SITE AMENITIES TO BE LOCATED AS SHOWN ON PLAN SHEETS UNLESS MARKED OTHERWISE IN

THE FIELD BY FOREST SERVICE ENGINEER OR LANDSCAPE ARCHITECT

2. CAMPSITES, PICNIC TABLES, FIRE RINGS, AND FOOD LOCKERS SHALL BE CONSTRUCTED AS

SHOWN ON THE PLANS AND AS APPROVED IN…