Attachment 2. Schedule.docx

DOCX document 33 KB Posted

Attached to
127EAW24R0025 - GAOA Sawmill & Bear Campground Renovations
Solicitation number
127EAW24R0025
Issued by

About this file

This document is the Schedule of Items for a solicitation by the Department of Agriculture Forest Service for the GAOA Sawmill & Bear Campground Renovations project. It details the specific construction items and quantities required, including removing and installing fire rings, food lockers, tables, trash cans, signs, spillway assemblies, and road surfacing at the two campgrounds. The solicitation has a total small business set-aside, with an estimated construction value between $500,000 and $1,000,000. The document includes optional pricing items for additional work such as barriers, entrance road surfacing, and increased aggregate depth. A pre-proposal site visit is scheduled for May 21, 2024, and requests for information are due by May 22, 2024. The contract will be awarded based on the pricing provided for all required and optional items.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
Item
Construction Items
UOI
Qty.
Unit Price
Total Price
0001
MOBILIZATION
LS
1
$
$
0002
Remove and Reinstall EXISTING FIRE RINGS at Sawmill CG
EA
1
$
$
0003
Remove EXISTING FIRE RINGS at Bear CG
EA
8
$
$
0004
Install NEW FIRE RINGS at Bear CG
EA
6
$
$
0005
Install NEW FOOD LOCKERS at Sawmill CG
EA
6
$
$
0006
Install NEW FOOD LOCKERS at Bear CG
EA
6
$
$
0007
Remove and Reset EXISTING TABLES with NEW CONCRETE ANCHORS at Sawmill CG
EA
2
$
$
0008
Remove EXISTING TABLE at Bear CG
EA
1
$
$
0009
Paint EXISTING TABLES at Sawmill CG
EA
9
$
$
0010
Paint EXISTING TABLES at Bear CG
EA
6
$
$
0011
Install NEW TRASH CAN at Sawmill CG
EA
1
$
$
0012
Incidental GRADING OF SITE AMENITIES for accessibility requirements at Sawmill CG
EA
6
$
$
0013
Incidental GRADING OF SITE AMENITIES for accessibility requirements at Bear CG
EA
6
$
$
0014
Install new SITE ID SIGN (SAWMILL CAMPGROUND) with NEW WOOD POSTS at Sawmill CG
EA
1
$
$
0015
Install new FOREST ROAD ID SIGN (BEAR CAMPGROUND) with POST at Bear CG
EA
1
$
$
0016
Remove and Replace EXISTING INFORMATION BOARD at Sawmill CG
EA
1
$
$
0017
Remove and Replace EXISTING INFORMATION BOARD at Bear CG
EA
1
$
$
0018
Install SPILLWAY ASSEMBLIES - Overside Drains (OSDs) & 10-ft Flumes at Sawmill CG
EA
7
$
$
0019
Install SPILLWAY ASSEMBLIES - Overside Drains (OSDs) & 10-ft Flumes at Bear CG
EA
2
$
$
0020
Place AGGREGATE ROCK BASE for ROAD SURFACING in Campground (No Entrance Road) - Caltrans Class 2 AB 3/4" rocks to a Depth of 6 inches at Sawmill CG*
CY
586
$
$
0021
Place AGGREGATE ROCK BASE for ROAD SURFACING in Campground (No Entrance Road) - Caltrans Class 2 AB 3/4" rocks to a Depth of 6 inches at Bear CG*
CY
162
$
$
0022
Place RIPRAP (Class 4) for DRAINS and V-DITCHES to a Depth of 12 inches at Sawmill CG*
CY
194
$
$
0023
Roadbed RECONDITIONING (to 6" Depth), Compaction Method FSSS 204.11(a) for Roadways and Ditches at Sawmill CG*
CY
939
$
$
0024
Roadbed RECONDITIONING (to 6" Depth), Compaction Method FSSS 204.11(a) for Roadways and Ditches at Bear CG*
CY
182
$
$
0025
Install 18" CORRUGATED METAL PIPES (CMPs) Assume 20-ft Sections of HDPE at Sawmill CG
EA
18
$
$
0026
Install 18" CORRUGATED METAL PIPES (CMPs) Assume 20-ft Sections of HDPE at Bear CG
EA
2
$
$
0027
Drainage Excavation, INTERSECTING DIP CONSTRUCTION for Spillway Assemblies at Sawmill CG
EA
7
$
$
0028
Drainage Excavation, INTERSECTING DIP CONSTRUCTION for Spillway Assemblies at Bear CG
EA
2
$
$
0029
Relocate FELLED TREES for BARRIERS at Sawmill CG
LS
1
$
$
0030
Relocate FELLED TREES (from Atmore Meadows Road) for BARRIERS at Bear CG
LS
1
$
$
0031
Install NEW GATE at Bear CG
JOB
1
$
$
0032
Install NEW GATE at Sawmill CG
JOB
1
$
$
BASE ITEMS TOTAL:
$_______
B.1SCHEDULE OF ITEMS – OPTION 1 BARRIERS FOR SAWMILL
Item
Construction Items
UOI
Qty.
Unit Price
Total Price
0033
Mobilization
LS
1
$
$
0034
Install PIPE TUBING BARRIERS for Spurs at Sawmill CG
LF
637
$
$
0035
Remove EXISTING GUARDRAIL at Sawmill CG
JOB
1
$
$
OPTION 1 TOTAL:
$___________
B.1SCHEDULE OF ITEMS – OPTION 2 ENTRANCE ROADS AGGREGATE ROCK BASE, DEPTH 6 INCHES
Item
Construction Items
UOI
Qty.
Unit Price
Total Price
0036
Mobilization
LS
1
$
$
0037
Place AGGREGATE ROCK BASE for ROAD SURFACING in Bear CG (Entrance Road) - Caltrans Class 2 AB 3/4" rocks to a Depth of 6 inches
CY
65
$
$
0038
Place AGGREGATE ROCK BASE for ROAD SURFACING in Sawmill CG (Entrance Road) - Caltrans Class 2 AB 3/4" rocks to a Depth of 6 inches
CY
260
$
$
OPTION 2 TOTAL:
$___________
B.1SCHEDULE OF ITEMS – OPTION 3 ADD AGGREGATE ROCK BASE THICKNESS TO BASE ITEMS
Item
Construction Items
UOI
Qty.
Unit Price
Total Price
0039
Mobilization
LS
1
$
$
0040
Place AGGREGATE ROCK BASE for ROAD SURFACING in Sawmill CG - Caltrans Class 2 AB 3/4" rocks to a Depth of 10 inches (Add 4 inches to Base Thickness)
CY
564
$
$
0041
Place AGGREGATE ROCK BASE for ROAD SURFACING in Bear CG - Caltrans Class 2 AB 3/4" rocks to a Depth of 10 inches (Add 4 inches to Base Thickness)
CY
148
$
$
OPTION 3 TOTAL:
$___________
B.1SCHEDULE OF ITEMS – OPTION 4 ADD HOT MIX ASPHALT TO AGGREGATE BASE SURFACES
Item
Construction Items
UOI
Qty.
Unit Price
Total Price
0042
Mobilization
LS
1
$
$
0043
Place Hot Mix Asphalt (HMA) on all Sawmill CG Roadways to a Depth of 2
TON
552
$
$
0044
Place Hot Mix Asphalt (HMA) on all Bear CG Roadways to a Depth of 2
TON
146
$
$
OPTION 4 TOTAL:
$___________
BASE PLUS 4 OPTIONS TOTAL:
$__________

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.

* One award will be made from this solicitation, contractors must submit pricing for all items.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name:
POC & Title:
Email:
Phone Number:
UEI Number:
Tax ID:

File details come from the government source that posted it. Updated .