This solicitation posting is for a construction project to reconstruct existing paved and gravel roads, parking lots, and trails along Forest Road #214 within the Redfish Lake Recreation Complex in the Sawtooth National Forest. Work will occur at three primary locations and includes constructing approximately 6,960 lineal feet of new asphalt roadway and trails, 1,775 lineal feet of a new asphalt trail along the lakeshore, two new paved parking lots totaling 76 vehicles, and reconstructing the North Shore Day Use Area. Construction will also remove and rehabilitate existing parking lots and roads to return areas to their pre-developed state. The contract is estimated between $1,000,000 to $5,000,000 and has an anticipated start date of June 5, 2023 for preparation with on-the-ground construction beginning August 14, 2023 and an end date of October 31, 2024. The solicitation is issued by the USDA Forest Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE, R4

FY 22 GAOA/CIP REDFISH LAKE (PHASE 3) ROAD IMPROVEMENTS

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

B. See other specification section within this package for additional requirements on submittal.

1.2 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 14 days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

Attachment 4 1240LT23R0002

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. If more than one item is shown on submittal sheet, identify item.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document. Coordinate with CO on which submittals may be able to be submitted electronically as opposed to hard copy. Typically color submittals are hardcopy only.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Notation of dimensions established by field measurement.

2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

E. Samples: Prepare physical units of materials or products, including the following:

1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

PART 3 - EXECUTION

3.1 GENERAL

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

F. Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution.

Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

END OF SECTION 013300

March 2022

SECTION 101110 – BULLETIN BOARDS

PART 1 - GENERAL

1.1 This item shall consist of furnishing and installing bulletin boards, constructed as shown on the drawings, at the locations shown on the site plan or as staked in the field, in conformity with the lines and grades established, or as directed by the Contracting Officer.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Lumber, Panels and Fasteners:

1. All lumber shall be seasoned, surfaced four sides (S4S), except where shown rough-sawn on drawings, shall not exceed a moisture content of 19 percent, and shall not be less than the following grades:

a. The posts shall be Douglas Fir No. 2 and better grade, pressure treated, as graded by the Western Wood Products Association or West Coast Lumber Inspection Bureau, or equal, unless otherwise shown on the Drawings.

b. All other beams, frames, and other dimensioned lumber shall be Douglas Fir, No. 2 or better, Construction Grade, pressure treated, conforming to paragraph 40.11 of Western Lumber Grading Rules 80 - Western Wood Products Association, latest edition.

c. Plywood Panel – MDO or ACX, Douglas Fir, rough sawn, 3/4", 303 Siding grade as graded by The Engineered Wood Association (formerly American Plywood Association), or approved equal.

2. All lumber shall be pressure treated using the "Empty Cell Process" as required by the American Wood Preservers Association (AWPA), with a copper naphthenate solution. The copper naphthenate solution shall contain not less than 6% or more than 8% copper in the form of copper naphthenate, in petroleum oil, AWPA P9, conforming to AWPA P8 and AWPA C1 for oil-borne preservatives.

3. All nails, bolts, lag screws, washers, etc., shall be galvanized.

2.2 STAIN

A. Material shall all be first quality products. The Benjamin Moore & Co. products listed are given to establish the type and quality of products to be used. Other products of equivalent quality may be submitted to the Contracting Officer for review and approval.

Top line products of Pratt & Lambert, Sherwin-Williams, Fuller-O'Brien, Olympic, and Pittsburgh paints and stains are equivalent to those listed in this specification.

B. Wood – Semi Solid Stain: Benjamin Moore #329-06 or approved equal. (max. spread rate - 350 sq. ft./gallon). Color to be approved by COR.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Posts

1. Posts shall be installed plumb and true. Backfill around posts in 6” lifts with native soil and tightly compact.

3.2 FINISH CARPENTRY

A. General

1. Joints shall be closely fitted, butted, as shown or required to provide substantial construction and a neat, finished appearance and to conceal shrinkage. Exposed wood surfaces shall be without surface imperfections which cannot be concealed readily by paint finishes. Use finishing nails set for puttying.

3.3 PREPARATION OF SURFACES

A. Surfaces to be painted shall be clean and free of dirt, dust and any other substance which might interfere with the functioning of the painting system. All surfaces to be painted shall be in proper condition to accept, and assure the proper adhesion and functioning of the particular painting system or coating specified.

B. Wood surfaces shall be hand sandpapered and dusted clean. All knots, pitch pockets, or sappy portions shall be sealed with clear shellac or knot sealer. Putty all nail holes, cracks, etc., after first or prime coat. Do not seal wood surfaces to receive stain or natural finish. Do not sandpaper saw textured or re-sawn surfaces.

C. All above grade portions, shall be stained with two coats of stain.

3.4 COLOR SCHEDULE

A. Stain: Flat, modified linseed-alkyd solid color stain; Moorwood Exterior Stain, (max.

spread rate – 350 sq. ft./gallon). A color selection sheet shall be submitted to the Contracting Officer for color selection.

B. Stain shall be applied in accordance with the applicable specification and/or manufacturer's instructions.

3.5 TOUCHING UP

A. At the completion of all construction activities, all painted and finished work shall be touched up and restored where damaged or defaced, and the entire work left free from blemished.

3.6 FINISH

A. The completed bulletin board shall be installed at the location(s) indicated on the site plan or staked in the field to the line and grade established. When the completed structure is plumb it shall be backfilled in lifts not to exceed 6 inches, watered if necessary, and compacted to the density of the surrounding natural material. When backfilling is completed, the site shall be finish graded to match the surrounding natural grade and shall be cleaned up by removing all debris and unutilized materials.

END OF SECTION 101110

SECTION 101415 – SIGN FABRICATION (WOOD)

PART 1 - GENERAL

1.1 This item shall consist of furnishing and installing Minor Site ID signs as shown on the Drawings. Final sign locations will be staked in the field by the Contracting Officer.

The contractor shall furnish all posts, signs, and hardware required to complete the full installation.

1.2 REFERENCE SPECIFICATIONS

A. The publication listed below form a part of this specification to the extent referenced.

The publication is referred to in the text by the basic designation only.

1. EM 7100-15 Standards for Forest Service Signs

1.3 SUBMITTAL

A. Sign List Submittal: The contractor shall submit a list of signs proposed for the project.

The list shall include detailed drawings showing the size of the sign, size of letters, colors, materials, sign texts, and location for installation. The Contracting Officer shall approve the submitted list, prior to the Contractor ordering the signs.

PART 2 - PRODUCTS

2.1 SIGN PANELS

A. General:

1. Signs shall conform to current editions of the Manual of Uniform Traffic Control Devices (MUTCD) and the Forest Service Manual - EM 7100-15, Standards for Forest Service Signs.

B. HDO Plywood Panel: Primer, Paint, and Stain

1. Primer – Primer shall be top-quality and oil-based conforming to Federal Specification TT-P-25.

2. Paint – Paint shall be top-quality exterior acrylic (high-acrylic) latex enamel conforming to Federal Specification TT-P-19. Unless shown otherwise in drawings, colors shall be Federal Standard 595B.

3. Stain – Stain shall be semitransparent, oil based. The final product shall match the following colors:

A. Brown 20059 B. Yellow-cream 23695

2.2 POSTS

A. Wood Posts - 4”x 6” posts shall be rough sawn standard and better Douglas Fir No. 2.

All lumber shall be pressure treated using the “Empty Cell Process” as required by the American Wood Preservers Association (AWPA), with copper naphthenate solution. The copper naphthenate solution shall contain not less that 6% or more than 8% copper in the form of copper naphthenate, in petroleum oil, AWPA P9, conforming to AWPA P8 and C1 for oil-born preservatives.

2.3 FASTENER BOLTS

A. Vandal-Proof Bolts and hardware shall be galvanized or cadmium plated steel. Bolts shall be 5/16” carriage bolts. Nuts installed with wood posts shall be NTPAFN fluted nuts. Nuts installed with tubular steel posts shall be vandal-proof tufnuts or approved equal. A known supplier is Intermountain Traffic Safety, West Valley City, Utah, phone

(801) 972-6515.

PART 3 - EXECUTION

3.1 POST SETTING

A. Post holes not larger than 18-inch diameter shall be excavated to a depth as shown on the drawings. Backfill shall be hand tamped around the wood posts so as to make the post solid and plumb. Any loose posts shall be removed and re-installed.

3.2 SIGN MOUNTING

A. Signs shall be mounted as shown on the drawings. Bolt holes shall be neatly drilled in the signs so as to prevent splintering and drilling through letters or delaminate sheathing.

Sign face sheathing or coverings shall not be broken

END OF SECTION 101415

SECTION 221100 - WATER DISTRIBUTION SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section shall consist of furnishing and installing the following:

1. Potable water distribution pipe and fittings.

2. Daylight drains.

B. This Section shall also include the flushing, testing and disinfection of waterlines.

1.2 DEFINITIONS

A. GSP: Galvanized Steel Pipe.

B. HDPE: High Density Polyethylene plastic.

C. NPWL: Non-potable waterline (includes sewerline).

D. PVC: Polyvinyl chloride plastic.

1.3 SUBMITTALS

A. Product Data: For the following:

1. Pipe and fittings.

2. Daylight drains.

B. Plan for disposal of water used for testing and disinfection of waterlines.

1.4 QUALITY ASSURANCE

A. All work is to be completed according to applicable Federal, State and Local codes. This work includes, but is not limited to, materials, installation, testing and disinfection

B. Piping materials shall bear label, stamp, or other markings of specified testing agency.

C. NSF Compliance:

1. Comply with NSF 14 for plastic potable-water-service piping. Include marking "NSF-pw" on piping.

2. Comply with NSF 61 Annex G for materials for water-service piping and specialties for domestic water. All pipes, fittings, fixtures, solder and flux shall meet the 0.25% maximum lead content rules for all wetted components.

1.5 MINIMUM SYSTEM REQUIREMENTS

A. Unless otherwise noted, the minimum working pressure for piping and specialties shall be 200 psig.

1.6 DELIVERY, STORAGE AND HANDLING

A. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.

B. Protect stored piping from moisture and dirt. Elevate above grade.

C. Protect flanges, fittings, and specialties from moisture and dirt.

D. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.

1.7 PROJECT CONDITIONS

A. Existing Utilities: Do not interrupt utilities serving facilities occupied by the Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify the Contracting Officer not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without the Contracting Officer’s written permission.

1.8 COORDINATION

A. Coordinate connection to existing waterlines with Contracting Officer.

B. Verify piping materials, sizes, entry locations and pressure requirements are compatible with connection point.

C. Coordinate other utility impacts.

PART 2 - PRODUCTS

2.1 GENERAL

A. All waterlines, pipes, and fittings shall be new and unused, of the type, pressure rating or class, and size specified and as shown on the Drawings.

2.2 PIPES AND FITTINGS

A. HDPE:

1. Pipe, AWWA C901:

a. Material Designation: PE 4710 resin

b. Material Classification: ASTM D1248

c. Minimum Cell Classification: ASTM D 3350, 345434C

d. Dimension Ratio and Minimum Pressure Rating: DR11, 200 psig.

2. Fittings:

a. Molded HDPE Fittings: ASTM D 3350, PE 4710 resin, butt-fusion type, made to match HDPE pipe dimensions and class.

b. Insert Fittings: Not allowed.

c. Transition Fittings to non-HDPE Pipe: Approved by HDPE pipe manufacturer. Compression-type fittings are not allowed.

3. Pipe Larger than 2-inch Diameter: Provide in 40-foot lengths rather than in rolls.

B. Galvanized Steel: ASTM A53, Schedule 40, threaded ends meeting ASME B1.20.1.

1. Fittings: Threaded, ASTM A 338.

2.3 DAYLIGHT DRAINS

A. Suction Strainer

1. Design: Galvanized (zinc plated), cold rolled, 16-gage steel strainer with threaded end to fit GSP drain pipe size.

2. Model: “RHS” Series, Round Hole Strainer, as manufactured by Campbell Manufacturing Inc., or an approved equal.

B. Insect Screens

1. For Daylight Drains: 24-mesh woven wire cloth, type 304 stainless steel standard grade, non-corrodible.

2.4 END SEALS FOR SLEEVES

A. Design: With ASTM C443 compliant gaskets.

B. Model: Link-Seal, as manufactured by Pipeline Seal & Insulator, Inc. or an approved equal.

PART 3 - EXECUTION

3.1 PIPING INSTALLATION

A. Construct the water system to the lines and grades shown or established in the field.

B. Stake locations of waterlines as shown on the Drawings. Waterline location shall be approved by the Contracting Officer before installation.

C. All waterline shall be graded to drain.

D. All pipe, fittings, and appurtenances shall be handled and installed in strict conformance to the manufacturer’s recommendations.

E. Drains, valves, and other regulating and controlling devices shall be installed in the line where called for on the drawings.

F. The interior of all pipe, fittings, and other accessories shall be kept as free as possible from dirt and foreign matter at all times. Each piece of line as it is laid shall be cleaned of all debris. When the pipeline has become dirty on the inside during shipment or storage, it shall be swabbed out by drawing a damp swab through the line before placing in trench. Care shall be exercised to keep all joining surfaces clean. Any pipe with contaminated or damaged joining surfaces, which cannot be satisfactorily cleaned or repaired, shall be discarded. Under no circumstances shall pipe be installed in water, and no pipe shall be installed when trench conditions or the weather is unsuitable for such work. At all times when work is not in progress, all open ends of the pipe and fittings shall be securely closed to the satisfaction of the Contracting Officer so that no trench water, rodents, earth, or other substance will enter the pipe or fittings.

G. Any section of pipe already installed and found to be defective shall be removed and replaced with new pipe at the Contractor’s expense.

H. Water and Non-Potable/Sewer Line Crossings

1. Potable and NPWL lines shall never be installed in the same trench.

2. If a new line crosses below an existing line, the existing line shall be supported to prevent settling.

3. Where waterlines intersect NPWLs or are within 10 horizontal feet of NPWLs, the following applies:

a. At least one of the pipes (either the waterline or NPWL) shall be constructed or reconstructed with 200 psi pipe or encased in a continuous sleeve with same rating. At crossing, extend 200 psi pipe or sleeve for a distance of 10 feet perpendicular distance from each side of the waterline. The waterline and NPWL pipes or sleeves shall be centered at the crossing so that the joints will be an equal distance and as far as possible from the crossing.

1) Sleeves: Nominal sleeve diameter to be at least 3 inches larger than nominal diameter of pipe to be encased. Install end seals in annular space at each end of sleeves.

b. Construct according to applicable federal, state and local regulations, including Idaho Department of Environmental Quality, “Idaho Rules for Public Drinking Water Systems, IDAPA 58.01.08. The Contractor is responsible for obtaining and following these regulations.

c. Where applicable, state and local regulations supersede the above requirements.

I. Culvert Crossings: Where waterline crosses a road culvert, adjust grade of waterline to provide a minimum of 12 inches of separation between the waterline and culvert, unless otherwise noted on the Plans, maintaining slope of waterline to drain.

J. A minimum of one-foot separation shall be maintained between electric and waterlines in the same trench. Unless the electric conductors are in conduit the waterline shall be a minimum of one foot below the electric conductors.

K. Bury piping with depth of cover over top of at least 30 inches, unless otherwise shown on the Plans.

L. Cutting and Handling of Pipe

1. Cutting of pipe for closure pieces or for other reasons shall be done in a neat manner by methods, which will not damage the pipe. The pipe and fittings shall be handled in such a manner as to ensure delivery and final placement in good, undamaged condition. Particular care shall be exercised not to injure the pipe surfaces or coatings. Damaged pipe shall not be used in the work.

M. Laying Pipe

1. No pipe shall be placed in the trench until the Contracting Officer has approved the trench and bedding.

2. Do not drop pipe into trench. If HDPE pipe is fusion welded above ground outside of the trench, gently lay pipe into the trench. Ensure installation procedures meet the manufacturer’s requirements.

3. Pipes shall be placed true to the lines and grades shown on the Drawings and as specified. Complete water system shall be constructed to drain by gravity to drains for seasonal shutdown. Waterlines shall be constructed to drain at a minimum grade of 0.50%. Waterlines not meeting this requirement shall be removed by the Contactor and replaced at no cost to the Government.

4. Each section of the pipe shall rest upon the pipe bed for the full length of its barrel.

5. Backfill the pipe within 24 hours after installing the pipe in the trench, leaving the joints and one foot of pipe on each side of each joint exposed until testing is complete.

6. When work is not in progress, securely close open ends of pipe and fittings.

7. When high density polyethylene or solvent weld joint pipe is used, it shall be weaved in the trench to provide horizontal slack in the line for expansion and contraction.

8. High density polyethylene pipe shall be allowed to cool to within 20ºF of the shaded trench bottom temperature before backfilling.

9. When pipes are installed in a structure or utility box, they shall be adequately supported.

10. Use proper fittings in order to follow the required line and grades and to avoid excessive curvature. Deflections from a straight line or grade, as required by vertical curves, horizontal curves, or offsets, shall not exceed the manufacturer's recommended maximum joint deflection or curvature for their pipe.

11. When more than one pipeline is in the same trench, the pipes shall be separated by at least eight horizontal inches, or as shown on the Drawings.

12. Bends that result in joint tension or permanent pipe deformation are prohibited.

13. Pipelines may be relocated slightly, if necessary, to avoid existing obstacles.

However, the required slopes must be maintained.

N. Branch Connections

1. Branch connections to the main shall be made with tees.

2. Horizontal tees for waterline laterals shall not be permitted. The branch side of tees shall be up when drainage is toward the tee, and down when drainage is away from the tee.

3. Waterline tees shall be the same diameter as the largest pipe connected to the tee.

O. Pipe Joints

1. Joints shall be made, using jointing materials and applied with the proper accessories, in accordance with the manufacturer's instructions. Completed joints shall be watertight, and capable of passing the required hydrostatic testing. If pipe and fittings are assembled with a lubricant, it must be nontoxic.

2. Dissimilar Joints: Connections between two dissimilar pipes or fittings shall be installed in manner recommended by the pipe manufacturer and approved by the Contracting Officer. Use adapters compatible with both piping materials, outer diameters and system working pressure.

a. For HDPE pipelines:

1) Use HDPE/GSP transition fittings for connections to galvanized steel pipe.

2) Use HDPE/PVC transition fittings for connections to PVC pipe.

b. For other situations, use fittings to suit the actual conditions.

c. Compression-type fittings are not allowed.

3. Threaded Metal Joints:

a. Thread pipes with tapered pipe threads according to ASME B1.20.1, apply tape or joint compound, and apply wrench to fitting and valve ends into which pipes are being threaded.

b. Exposed threaded pipe joints on galvanized steel pipe shall be painted with mastic following the manufacturer’s application procedures.

c. Field cut ends shall be squared off by grinding or filing; ends shall be reamed with all chips and flakes removed.

d. Field cut threads or machined joints shall be made with sharp tools to sharp finished ends.

4. HDPE Heat-Fusion Joints

a. According to ASTM D 2657 and piping manufacturer's written instructions.

b. The joining method shall be butt fusion method and shall be performed in accordance with the pipe manufacturer's recommendations. Butt fusion equipment used in the joining procedures shall be capable of meeting all conditions recommended by the pipe manufacturer, including but not limited to, temperature requirements, alignment, and fusion pressures.

c. Personnel trained in butt fusion techniques by the manufacturer of the pipe, shall supervise or perform butt fusion operations.

d. Butt fusion shall be performed between pipe ends or pipe ends and fitting and valve outlets, of like outside diameter and wall thickness, SDR or DR. Butt fusion joining between same diameters but unlike wall thickness shall not be permitted. Transitions between unlike wall thickness shall be made with a transition nipple (a short length of the heavier wall pipe with one end machined to the lighter wall) or by mechanical means.

e. Branch connections to the main shall be made with polyethylene fittings, and butt fused.

f. Bent Strap Test: On each day that butt fusions are to be made, perform a “Bent Strap Test.” The first fusion of the day shall be a trial fusion. The trial fusion shall be allowed to cool completely, and then fusion test straps shall be cut out. The test strap shall be 12" (min) or 30 times the wall thickness in length with the fusion in the center, and 1" (min) or 1.5 times the wall thickness in width. Bend the test strap until the ends of the strap touch. If the fusion fails at the joint, a new trial fusion shall be made, cooled completely and tested. Butt fusion of pipe to be installed shall not commence until a trial fusion has passed the bent strap test.

5. Plastic Piping Solvent-Cemented Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

a. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and PVC socket fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.

P. Install piping by directional boring, tunneling, jacking, or combination, under streets and other obstructions that cannot be disturbed.

3.2 IDENTIFICATION

A. Wrap all buried, non-metallic, nonperforated piping with tracer wire.

B. Use detectable warning tape over piping and at outside edges of underground structures.

3.3 DAYLIGHT DRAINS

A. Install suction strainer and insect screens on the atmospheric outlet of daylight drains.

Attach insect screens to pipe with stainless steel hose clamps.

B. Minimum grade of slope of drain shall be 1%.

C. Place riprap securely around outlet with a minimum 12” air gap.

3.4 HYDROSTATIC TESTING

A. General

1. The Contractor shall conduct pressure and leakage tests on all newly constructed portions of the water system, including water mains, service lines, fittings, valves, and hydrants. New waterlines that are extensions or modifications of an existing water system shall be tested at the test pressure specified here unless the Contracting Officer specifies another pressure. Pneumatic testing will not be allowed.

2. The contractor shall ensure that any appurtenance attached to the pipeline at the time of testing is rated to withstand the pressures that will exist during testing.

3. Conduct piping tests before joints are covered and after thrust blocks, if required, have hardened sufficiently. Joints shall remain uncovered until testing is completed satisfactorily.

4. The Contractor shall furnish the pump, pipe, gauge, measuring device, connections, and all other necessary equipment, and shall furnish the necessary personnel to conduct the tests. All equipment, gauges, and attachments shall be subject to approval by the Contracting Officer.

5. The Contracting Officer shall be present during the testing period.

6. Waterlines shall be tested in sections not to exceed 2,000 ft in length or a maximum pressure differential of 30 psi in the test section.

7. No paints, asphalts, tars, enamels, or other types of pipe compounds shall be used to eliminate leaks.

B. Pressure and Leakage Test

1. The test pressure shall:

a. Equal at least 125% of the normal working pressure at the highest elevation of the test but not exceed 200 psi at any point being tested.

b. Not vary by more than +/- 5 psi from the established test pressure.

c. Not exceed twice the rated pressure of valves when the test section includes closed valves.

2. Pressure Test Procedure

a. Equipment: The test pressure shall be applied by means of a pump connected to the pipe in a manner satisfactory to the Contracting Officer.

b. Preparation: Fill pipeline 24 hours before testing. Use only potable water.

Each valved section of pipeline shall be slowly filled with water and all air shall be expelled from the pipeline. Apply test pressure to stabilize system.

c. Pressurization:

1) Increase pressure in 50-psig increments and inspect each joint between increments.

2) Hold at test pressure for 1 hour.

3) Decrease to 0 psig.

4) Slowly increase again to test pressure and hold for 1 more hour. If the test pressure cannot be sustained within +/- 5 psi during this time, then the system will be determined to have leakage.

5) Leakage shall be verified by the Contractor and the Contracting Officer.

6) Locate and repair leaking joints with new materials and repeat test until leakage is within allowed limits. All visible leaks are to be repaired regardless of the amount of leakage.

d. Examination: All exposed pipe, fittings, valves, and joints shall be carefully examined. Any cracked or defective pipe, fitting, or valve discovered shall be repaired or replaced by the Contractor at his own expense with new material and the test repeated until satisfactory to the Contracting Officer.

3. Results

a. The Contractor shall furnish a written report to the Contracting Officer describing the results of each test. The report must identify the specific portions of the pipeline tested, the pressure, the duration of the tests, and the amount of leakage.

3.5 CLEANING AND DISINFECTION

A. Clean and disinfect water-distribution piping as follows:

1. Purge new water-distribution piping systems and parts of existing systems that have been altered, extended, or repaired before use.

2. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in AWWA C651 or as described below:

a. Flushing Pipelines

1) After the pressure and leakage testing has been completed, all water pipes shall be thoroughly flushed.

2) Flushing shall remove all debris from the pipeline, including HDPE pipe shavings, gravel and any other material that may have accidentally entered the pipeline during construction.

3) Remove all self-closing faucets and drinking fountains from hydrants before flushing lines. Failure to do so will likely clog the internal parts of the faucet.

4) If no hydrants or other outlets are installed at the end of the waterline, an outlet at the end of each lateral shall be provided. Outlets shall be large enough to develop a velocity in the waterlines of at least 2.5 feet per second (see Table l for necessary flows). If necessary, use a booster pump or other method to obtain the necessary flows.

5) Minimum velocities must be obtained in all mainlines, laterals and drainlines.

6) Ensure flushing outlets have adequate drainage and no damage or erosion will occur from the flushing process. Install hoses and/or pipe extensions if necessary.

TABLE 1

Required Flow in Gallons per Minute (GPM) to provide 2.5 feet per second

Flushing Velocity

Type of Pipe

Nominal Pipe Size (inches)

HDPE

(SDR 11)

PVC

(160 psi)

Galv. Steel (Schedule 40)

1 7 9 7 1 ¼ 11 15 12 1 ½ 14 19 16 2 22 30 27

2 ½ - 44 38 3 49 64 58

3 ½ - 84 77 4 81 106 100 5 - 162 156 6 175 229 225 8 274 388 390 10 461 603 615 12 648 848 872

b. Requirement of Chlorination

1) Pipelines: After flushing, all new waterlines and repaired portions of, or extensions to, existing waterlines shall be disinfected by chlorination. Chlorination shall provide a minimum of 25 mg/l residual after 24 hours contact in the system. This may be expected with an application of 50 mg/l, although some conditions may require more.

The entire system including the storage tank or spring box shall be filled with the disinfecting solution. All taps, hydrants, and other outlets shall be opened and left open until chlorine is noticeable by odor or testing in the water coming from each. Immediately close taps, hydrants, and other outlets. The chlorinated water shall be retained in the waterlines for at least 24 hours. An alternative of introducing a chlorine solution of 300 mg/l for a period of 3 hours is also approved.

2) Reservoirs Only: For large reservoirs where water is not going to be reused to disinfect connecting distribution lines, or where it is not economical to treat the entire contents with 50 mg/l of chlorine, disinfection can be accomplished by swabbing or spraying the walls, floor, and ceiling with a chlorine solution containing 300 mg/l of available chlorine. A minimum of 3 hours shall elapse before the structure is flushed and returned to service.

c. Preparation of Disinfecting Mixture: Chlorine-bearing compounds used for disinfection shall comply with ANSI/NSF 60.

1) Calcium hypochlorite must be prepared as a water mixture for introduction into the waterlines. The powder should first be made into a paste and then thinned to either a 1 percent or 5.25 percent chlorine solution.

2) Sodium hypochlorite is already a water mixture.

3) Table 2 gives the amount of chlorine-bearing compound to mix to obtain either a 1 percent or 5.25 percent solution.

4) Table 3 gives the amount of a 1 percent or 5.25 percent solution required to obtain a 50 mg/l solution for various volumes.

5) Table 4 gives the volume of water contained in each 100 feet of pipe of various sizes.

TABLE 2

Amount of Chlorine-bearing Compound to Mix to Obtain a 1% or 5.25% Solution

Product 1% Solution 5.25% Solution Amount of Compound

Gallons of Water

Amount of Compound

Gallons of Water

Calcium Hypochlorite (65%

Cl)

1 pound 7.67 1 pound 1.36

Sodium Hypochlorite (5.25% Cl)

1 gallon 4.25 1 gallon 0

TABLE 3

Amount of Chlorine-Water Solution Required to make 50 mg/l

Chlorine Solution for Various Volumes Volume

(Gallons) 5.25%

Solution 1.00%

Solution 100 1.52 cup 0.50 gal.

500 0.48 gal. 2.50 gal.

1,000 0.95 gal. 5.00 gal.

5,000 4.76 gal. 25.0 gal.

10,000 9.52 gal. 50.0 gal.

50,000 47.6 gal. 250 gal.

100,000 95.2 gal. 500 gal.

TABLE 4

Volume in Gallons per 100 feet of Pipe

Type of Pipe Nominal Pipe Size

(inches)

HDPE

(SDR 11)

PVC

(160 psi) Galv. Steel

(Schedule 40) 1 4.6 5.8 4.5

1 1/4 7.3 9.6 7.8 1 1/2 9.6 12.6 10.6

2 15.0 19.6 17.4 2 1/2 - 28.8 24.9

3 32.6 42.6 38.4 3 1/2 - 55.6 51.4

4 53.8 70.4 66.1 5 - 107.5 103.9 6 116.7 152.6 150.1 8 182.8 258.6 259.9 10 307.2 401.8 409.6 12 432.2 565.2 581.4

6)

d. Method of Chlorine Application: The preferred method is to fill the storage tank (for a distribution system) or the spring head box (for a supply system) with chlorinated water of the proper strength. The water shall then be released through the outlet lines to the remainder of the system and retained there for the required period of time. If either of these points of application is unavailable, chlorinated water of the proper strength may be added to the beginning of the pipeline extension, or to any valved section of the extension, through a corporation stop installed by the Contractor in the top of the pipe.

Other methods may be approved by the Contracting Officer.

e. Testing of Chlorine Residual: To ascertain the concentration, the chlorine residual shall be measured by the Contracting Officer in accordance with the procedures described in the current edition of “Standard Methods for the Examination of Water and Wastewater,” or AWWA M12, or by using an appropriate high-range chlorine test kit.

f. Final Flushing and Testing: Following the retention period, as specified in this Section, all heavily chlorinated water shall be thoroughly flushed from the pipeline until the chlorine concentration in the water leaving any part of the line is no higher than 1 mg/1.

g. Disposal:

1) Heavily chlorinated water shall not be drained directly into streams, rivers, lakes or drainage ditches which lead to surface water.

2) When emptying the lines or tank after the 24-hour period, whether the system has passed or failed, the chlorine solution shall be neutralized before being discharged. Neutralize system by adding sodium thiosulfate to the storage tank in accordance with Table 5 below. Let the sodium thiosulfate sit in the storage tank for 24-hours and then release the water from the tank and flush the system. Residual chlorine at the outlets shall be minimal.

TABLE 5

Amounts of Chemical Required to Neutralize Various Residual Chlorine Concentrations in

1,000 gallons of Water Residual Chlorine Concentration mg/L

Pounds of Sodium Thiosulfate (Na2 S2 O3 – 5H2O)

1 0.012 2 0.024 10 0.12 50 0.60

h. Bacteriological Examination: After the system has been disinfected as specified, but before the new water piping is put to use or connected to existing piping, the Contractor shall test the water for bacteriological contamination from representative points in the system as approved by the Contracting Officer. The coliform organisms shall be tested for presence/absence in accordance with State drinking water regulations. If coliform bacteria are present, testing shall be repeated in accordance with State drinking water regulations. If the report of this examination is unsatisfactory, the system shall be flushed and the disinfection procedure repeated until the results of bacteriological examinations are satisfactory.

END OF SECTION 221100

SECTION 221102 - CURB VALVES AND BOXES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Curb Valves and Boxes.

1.2 QUALITY ASSURANCE

A. All work is to be completed according to applicable Federal, State and Local codes.

B. NSF Compliance:

C. All products in contact with potable water shall comply with NSF 61 Annex G. All pipes, fittings, fixtures, solder and flux shall meet the 0.25% maximum lead content rules for all wetted components.

1.3 SUBMITTALS

A. Product data.

PART 2 - PRODUCTS

2.1 CURB VALVES AND BOXES

A. Valves: Valves shall be the same nominal size as the line in which they are installed or as indicated on the Drawings.

1. Valve Operating Wrenches: Steel, tee-handle with one pointed end, stem of length to operate deepest buried valve, and end matching curb valve. Furnish one valve operating wrench or shut-off rod with every five (or fraction thereof) curb boxes installed, as indicated on the Drawings.

2. Metal Valves

a. 3/4-Inch Through 2-Inch Valves:

1) Design: Minneapolis Top, Solid Tee Head, AWWA C 800.

2) Model: “Mark II Oriseal” Valve, Mueller H-10287, as manufactured by Mueller Company, or an approved equal.

b. Valves Larger than 2-Inches:

1) Design: AWWA C 509, NSF 61, gate valves with iron body, “O” ring stem seals, nonrising stem, with 2-inch square wrench nut head.

2) Ends: Threaded, flanged, hub, spigot, mechanical joint or other as appropriate for connection to line in which they are installed.

3) Model: Mueller A-2360, as manufactured by Mueller Company, or an approved equal.

B. Curb Boxes:

1. Lids: Lockable, with pentagon-type bolt, compatible with valve box; labeled

“WATER”.

2. Pentagon Lid Keys: Furnish one key with every five (or fraction thereof) curb boxes installed.

3. Curb Boxes for Metal Valves:

a. For 3/4-Inch Through 2-Inch Valves: Extension type, Minneapolis pattern base. Models below as manufactured by Mueller Company or an approved equal.

1) 3/4-Inch and 1-Inch Valves: Mueller H-10302.

2) 1-1/4-Inch Through 2-Inch Valves: Mueller H-10304.

3) Outside roadways, a galvanized pipe and threaded cap may be used in lieu of a commercial curb box, as indicated on the Drawings.

b. For Valves Larger Than 2-Inches: Buffalo type, two piece, 5-1/4-Inch, Series 6855 as manufactured by Tyler Corporation, or an approved equal.

C. Gravel: Hard, durable, screened material, 1/4-inch to 1-inch in size, free of soil or clay lumps.

PART 3 - EXECUTION

3.1 CURB VALVE AND BOX INSTALLATION

A. Crushed Gravel Bed: Under each valve, 12-inch minimum diameter, 12-inch minimum depth.

B. Knockouts: Remove knockouts from valve box.

C. Curb Box Position: Centered over valve bonnet, no part in contact with valve. The curb valve box shall not rest on the pipe, but shall be fully supported by the gravel base.

D. Curb Box Lid: Flush with finished grade, unless indicated otherwise on the Drawings.

END OF SECTION 221102

SECTION 221103 - PLUMBING APPURTENANCES

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes piping, fittings, valves, and other plumbing devices within utility boxes or at other designated locations.

1.2 SUBMITTALS

A. Product, Operation, and Maintenance Data: For the following:

1. Ball valves and combination air valves

2. Hose bibbs and vacuum breakers

1.3 MINIMUM SYSTEM REQUIREMENTS

A. Unless otherwise noted, the minimum working pressure for piping and specialty valves and devices shall be 200 psig.

1.4 QUALITY ASSURANCE

A. NSF Compliance:

1. All products in contact with potable water shall comply with NSF 61 Annex G. All pipes, fittings, fixtures, solder and flux shall meet the 0.25% maximum lead content rules for all wetted components.

PART 2 - PRODUCTS

2.1 GENERAL

A. All plumbing appurtenances shall be new and unused, of the type, pressure rating or class, and size specified and as show on the Drawings.

2.2 BALL VALVE

A. Description: Bronze, 400 psi, threaded NPT end connections.

B. Model: LFB6000 Lead Free Ball Valve as manufactured by Watts Regulator, or an approved equal.

2.3 HOSE BIBB

A. Description: Rough brass finish, male inlet, 3/4-inch hose thread outlet.

B. Model: Manufactured by Arrowhead Brass Products, Chicago Faucet Company, or an approved equal.

1. Vacuum Breaker: Model #LF8A Lead Free, ASSE 1011, Non-removable vacuum breaker, as manufactured by Watts Regulator Company, or an approved equal.

2. Hose: Provide 10-foot length of 3/4-inch plastic hose for connection to vacuum breaker.

2.4 UNION

A. Description: Female type, malleable iron, 150 pound, with ground brass to iron seat.

B. Model: Manufactured by Crane Company, or an approved equal.

2.5 PIPE AND FITTINGS

A. Galvanized Steel: ASTM A53, Schedule 40, threaded ends meeting ASME B1.20.1.

1. Fittings: Threaded, ASTM A 338.

2.6 COMBINATION AIR VALVE FOR PIPELINES

A. Description: AWWA C512, single body, float-operated, hydromechanical device with two orifices, cast iron body, stainless steel float, 300 psig rated working pressure, and NPS 1” threaded inlet.

1. Large Orifice Function: Automatically releases large quantities of accumulated air under pressure or admits large quantities of air during filling of piping

2. Small Orifice Function: When large orifice is closed, releases small pockets of air under pressure, automatically and independently of the large orifice.

B. Acceptable Models:

1. Model: UL 10 Universal Air Release Valve as manufactured by Crispin-Multiplex Mfg. Company, or an approved equal.

2. Model: No. 143C Combination Air Valve as manufactured by the APCO Valve and Primer Corporation, or an approved equal.

3. Model: 201C.2 Combination Air Valve as manufactured by the Val-Matic Valve and Mfg. Corporation, or an approved equal.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install piping, fittings, valves, and other plumbing devices within utility buildings, utility boxes or at other locations according to the manufacturer’s written instructions and as indicated on the Drawings. Install so water can be drained from each appurtenance for winterization of the system.

END OF SECTION 221103

January 2023

SECTION 221105 - WATER HYDRANTS

PART 1 - GENERAL

1.1 SUMMARY

A. Provides for furnishing and installing hydrants as follows:

1. A self-closing faucet and hose bibb with backflow preventer.

1.2 LOCATION

A. General location of all hydrants are shown on the drawings.

B. Exact location and orientation shall be approved by the Contracting Officer.

1.3 SUBMITTALS

A. Manufacturer's Literature and Maintenance Data: Faucet, hose bibb, vacuum breaker and backflow preventer.

B. Certification that washed rock meets the gradation requirements of this section.

C. Maintenance information to be included in maintenance manual.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Products shall be kept free from damage during delivery, storage, and handling. Protect from dirt and moisture during storage.

1.5 QUALITY ASSURANCE

A. NSF Compliance:

1. All products in contact with potable water shall comply with NSF 61 Annex G. All pipes, fittings, fixtures, solder and flux shall meet the 0.25% maximum lead content rules for all wetted components.

PART 2 - PRODUCTS

2.1 GENERAL MATERIALS

A. Lumber: S4S, hem-fir, No. 1, ACQ- or CAB- treated with 0.60 pcf retention

B. Framing Anchors: 16 gage, galvanized, 3-1/4 inches high with 1-1/4 inch long flanges

1. Model: GA2 model angle connector, as manufactured by Simpson Strong, or an approved equal.

C. Galvanized Steel Drain Grate

1. Design: 1/2” x 2” on-center press-locked close mesh, ADA compliant, hot-dipped galvanized steel, and 1-1/2” depth with welded lugs. Length and width shall be as shown on the Drawings.

2. Model: 8-P-2 as manufactured by Alabama Metal Industries Corporation (AMICO), or an approved equal.

D. Washed Rock for Gravel Sump: 3/4-inch to 1-inch washed and screened material, without lumps of soil, clay or organic material.

2.2 FOREST SERVICE STANDARD HYDRANTS

A. Pipe and Fittings: As specified in Section 221100 “Water Distribution System.”

1. Galvanized Steel…