1240LT23R0002.pdf

PDF 2 MB Posted

Attached to
GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest
Solicitation number
1240LT23R0002
Issued by

About this file

This solicitation posting provides details for the GAOA Redfish Lake Phase 3 Improvements project to be performed on the Sawtooth National Forest. Work includes reconstructing approximately 2,150 linear feet of entrance roadway, 250 linear feet around a roundabout, and 3,110 linear feet of roadway and 1,775 linear feet of trail in the north shore area. Additional work consists of constructing new parking lots, relocating various structures, installing drainage facilities and a new waterline, and recontouring existing areas. The anticipated work period is from June 2023 to October 2024. The project value is estimated between $1,000,000 to $5,000,000. The solicitation is issued by the USDA Forest Service Intermountain Region and responses are due on February 28, 2023.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCUREMENT & PROPERTY SERVICES INSTRUCTIONAL COVER SHEET

ISSUING OFFICE:

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

INTERMOUNTAIN REGION PPS/CSA #8

1249 S VINNELL WAY, SUITE 200 BOISE,

ID 83709

SOLICITATION NO. 1240LT23R0002

OFFERS ARE SOLICITED FOR: GAOA REDFISH LAKE (PHASE 3) ROAD IMPROVEMENTS PROJECT

IMPORTANT – NOTICE TO OFFEROR:

1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.

2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)

3. All questions regarding this solicitation must be in writing and addressed to the Contracting Officer email Tanya Spanfellner, tanya.spanfellner@usda.gov.

All questions must be received no later than FEBRUARY 10 by 1630 MT to be considered prior to solicitation close date

AT A MINIMUM, OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR

RESPONSE TO THIS SOLICITATION:

1. SF-1442, Complete, date, and sign.

Provide SAM UNIQUE ENTITY IDENTIFER and email address. Block 14

2. Representations and Certifications Section K 52.204-8. You must complete Representations and

Certifications via SAM, please only submit a response to Paragraph (b)(1) Pg. 37.

3. Provide information required Section L Addenda to FAR clause 52.215-1, paragraph c Pg. 45-47

4. Fill out the pricing schedule for all items Section B-Schedule, Page 6-13

5. Provide Liability insurance verification

6. Complete Determination of responsibility, Attach 8

7. Submit Bid Guarantee 52.228-1-20% of your price

PROPOSALS ARE DUE FEBRUARY 28 BY 1630 MT

Return to:

NAME: TANYA SPANFELLNER

Email: tanya.spanfellner@usda.gov Solicitation No. 1240LT23R0002

ONLY EMAIL PROPOSALS ARE BEING ACCEPTED

Please keep a copy of your quote for your records.

NO PAPER SOLICITATIONS SHALL BE ISSUED.

IT IS THE OFFERORS RESPONSIBILITY TO WATCH FOR ANY AND ALL AMENDMENTS TO THE

SOLICITATION

mailto:tanya.spanfellner@usda.gov

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1082296

USDA-FS CSA INTERMOUNTAIN 8

1249 S VINNELL WAY

SUITE 200

BOISE ID 83709

40LT

TANYA SPANFELLNER

tanya.spanfellner@usda.gov

TANYA SPANFELLNER 208-258-1041

GAOA

x 01/12/2023

1240LT23R0002

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

GAOA Redfish Lake (Phase 3) Road Improvements Project

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 0 calendar days and complete it within ________________ ________________ calendar days after receiving

Section F, 52.211-10

02/28/2023

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA-FS CSA INTERMOUNTAIN 8

1249 S VINNELL WAY

SUITE 200

BOISE ID 83709

40LT

TANYA I. SPANFELLNER

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

SAM UEI #______________________________

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 51

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

1240LT23R0002

Delivery: 06/05/2023

Delivery Location Code: 272

USDA FS STANLEY RANGER STATION

SAWTOOTH NATIONAL RECREATION AREA

SAWTOOTH NATIONAL FOREST

STANLEY ID 83278 US

Period of Performance: 05/01/2023 to 10/31/2024

0001 FY22 GAOA/CIP Redfish Lake (Phase 3) Road

Improvements project

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Table of Contents

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

B.2 SCHEDULE NOTES

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

C.2 PROJECT LOCATION

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

C.4 TECHNICAL SPECIFICATIONS

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

H.2 OTHER REQUIREMENTS

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K.1 PROVISIONS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

L.1 PROVISIONS

SECTION M--EVALUATION FACTORS FOR AWARD

Solicitation No.: 1240LT23R0002 Project Name:GAOA REDFISH LAKE (PHASE 3) ROAD IMPROVEMENTS PROJECT

M.1 PROVISIONS

M.2 PROPOSAL EVALUATION

M.3 TECHNICAL EVALUATION FACTORS

Solicitation No.: 1240LT23R0002

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES

FY22 GAOA/CIP Redfish Lake (Phase 3) Road Improvements Project

Sawtooth National Forest Sawtooth National Recreation Area

Custer County, Idaho

B.1 Schedule of Items

Base Bid – Entrance Area

Item No. Description Qty Unit of Measure

Method of Measure Unit Price Total Price

15101 Mobilization 1 Lump Sum LSQ $___________ $______________

15201 Construction Staking 1 Lump Sum LSQ $___________ $______________

15401 Contractor Testing 1 Lump Sum LSQ $___________ $______________

15701 Erosion Control 1 Lump Sum LSQ $___________ $______________

20101 Clearing and Grubbing 1 Lump Sum LSQ $___________ $______________

20301 Removal of Structures and Obstructions 1 Lump

Sum LSQ $___________ $______________

20401

Roadway/Trail Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction

1 Lump Sum LSQ $___________ $______________

20402 Select Borrow Including Haul, Watering, and Compaction 300 Cubic

Yard AQ $___________ $______________

20403 Subexcavation (Subgrade Stabilization) 217 Cubic

Yard CQ $___________ $______________

20404

Roadway/Trail Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction

1 Lump Sum LSQ $___________ $______________

20405 Waste, Haul and Disposal of Unsuitable or Excess Material 250 Cubic

Yard AQ $___________ $______________

20406 Barrier Rock Placement Complete 60 Each AQ $___________ $______________

20701 Earthwork Geotextile – Class 1, Nonwoven, Type A 8712 Square

Yard CQ $___________ $______________

21101 Roadway Obliteration, Full Recontouring 1 Lump

Sum LSQ $___________ $______________

25101 Placed Riprap, Class 3 20 Cubic Yard AQ $___________ $______________

Solicitation No.: 1240LT23R0002

30101

3/4"-0” Crushed Aggregate Base, Including Haul, Watering, and Compaction Method ‘E’

1308 Cubic Yard CQ $___________ $______________

30102

1/2"-0” Crushed Aggregate Surfacing, Including Haul, Watering, and Compaction Method ‘E’

427 Cubic Yard CQ $___________ $______________

30401 Full Depth Reclamation, Including Haul and Stockpiling 5516 Square

Yard CQ $___________ $______________

40301 Asphalt Concrete Pavement, Type I 1128 Ton AQ $___________ $______________

60201

12-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Bedding, Backfill and Compaction

40 Lineal Foot CQ $___________ $______________

61901 Steel Gate, Type 1 1 Each CQ $___________ $______________

61902 Steel Gate, Type 2 1 Each CQ $___________ $______________

62401 Furnishing & Placing Topsoil 340 Cubic Yard CQ $___________ $______________

62501 Seeding (Upland) 2 Acre CQ $___________ $______________

63301 Permanent Signing 1 Lump Sum LSQ $___________ $______________

63401 Permanent Pavement Striping 1 Lump Sum LSQ $___________ $______________

63501 Temporary Traffic Control 1 Lump Sum LSQ $___________ $______________

TOTAL BASE BID – ENTRANCE AREA $_____________________

Base Bid – Roundabout Area

Item No. Description Qty Unit of Measure

Method of Measure Unit Price Total Price

15101 Mobilization 1 Lump Sum LSQ $___________ $______________

15201 Construction Staking 1 Lump Sum LSQ $___________ $______________

15401 Contractor Testing 1 Lump Sum LSQ $___________ $______________

20301 Removal of Structures and Obstructions 1 Lump

Sum LSQ $___________ $______________

20302 Asphalt Pavement Removal 27 Square Yard CQ $___________ $______________

Solicitation No.: 1240LT23R0002

20401

Roadway/Trail Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction

1 Lump Sum LSQ $___________ $______________

20402

Roadway/Trail Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction

1 Lump Sum LSQ $___________ $______________

20403 Barrier Rock Placement Complete 50 Each AQ $___________ $______________

20701 Earthwork Geotextile – Class 1, Nonwoven, Type A 300 Square

Yard CQ $___________ $______________

30101 3/4"-0” Crushed Aggregate Base, Including Haul, Watering, and Compaction Method ‘E’

60 Cubic Yard CQ $___________ $______________

40301 Asphalt Concrete Pavement, Type I 55 Ton AQ $___________ $______________

62501 Seeding (Upland) 0.1 Acre CQ $___________ $______________

63301 Permanent Signing 1 Lump Sum LSQ $___________ $______________

63401 Permanent Pavement Striping 1 Lump Sum LSQ $___________ $______________

63501 Temporary Traffic Control 1 Lump

TOTAL BASE BID – ROUNDABOUT AREA $_____________________

Base Bid – North Shore Area

Measure

Method of Measure Unit Price Total Price

15101 Mobilization 1 Lump Sum LSQ $___________ $______________

15201 Construction Staking 1 Lump Sum LSQ $___________ $______________

15401 Contractor Testing 1 Lump Sum LSQ $___________ $______________

15701 Erosion Control 1 Lump Sum LSQ $___________ $______________

20101 Clearing and Grubbing 1 Lump Sum LSQ $___________ $______________

20301 Removal of Structures and Obstructions 1 Lump

Sum LSQ $___________ $______________

20302 Remove Existing Waterline 1 Lump Sum LSQ $___________ $______________

20303 Relocate Existing Precast Concrete Vault Toilet 1 Lump

Sum LSQ $___________ $______________

Solicitation No.: 1240LT23R0002

20401

Roadway/Trail Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction

1 Lump Sum LSQ $___________ $______________

20402 Select Borrow Including Haul, Watering, and Compaction 1000 Cubic

Yard AQ $___________ $______________

20403

Roadway/Trail Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction

1 Lump Sum LSQ $___________ $______________

20404 Waste, Haul and Disposal of Unsuitable or Excess Material 500 Cubic

Yard AQ $___________ $______________

20405 Barrier Rock Placement Complete 300 Each AQ $___________ $______________

20701 Earthwork Geotextile – Class 1, Nonwoven, Type A 20538 Square

Yard CQ $___________ $______________

21101 Roadway Obliteration, Full Recontouring (Former Redfish Trailhead Entrance)

1 Lump Sum LSQ $___________ $______________

21102

Roadway Obliteration, Full Recontouring (Former Visitor Center Parking Lot, Access Roadway, and Trail)

1 Lump Sum LSQ $___________ $______________

21103 Roadway Obliteration, Full Recontouring (Former Service Road)

1 Lump Sum LSQ $___________ $______________

21104 Roadway Obliteration, Full Recontouring (Former Native Surfaced Lakeshore Trail)

1 Lump Sum LSQ $___________ $______________

25101 Placed Riprap, Class 3 60 Cubic Yard AQ $___________ $______________

30101

1/2"-0” Crushed Aggregate Surfacing, Including Haul, Watering, and Compaction Method ‘E’

134 Cubic Yard CQ $___________ $______________

30401 Full Depth Reclamation, Including Haul and Stockpiling 16113 Square

Yard CQ $___________ $______________

30402 Supplemental 3/4"-0” Crushed Aggregate Base, Including Haul 235 Cubic

Yard AQ $___________ $______________

30403 Reclaimed Aggregate Base, Including Haul, Watering, and Compaction

3603 Cubic Yard CQ $___________ $______________

40301 Asphalt Concrete Pavement, Type I 3197 Ton AQ $___________ $______________

40302 Asphalt Concrete Pavement, Type I – Visitor Center Trail 32 Ton AQ $___________ $______________

60201

12-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Bedding, Backfill and Compaction

14 Lineal Foot CQ $___________ $______________

Solicitation No.: 1240LT23R0002

60202

18-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Bedding, Backfill and Compaction

160 Lineal Foot CQ $___________ $______________

60203

30-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Bedding, Backfill and Compaction

123 Lineal Foot CQ $___________ $______________

60401 Adjust Manhole to Finished Grade 5 Each CQ $___________ $______________

60901 Precast Colored Concrete Wheel Stop 70 Each CQ $___________ $______________

61101 6-Inch Diameter HDPE Waterline Pipe Sleeve, SDR 11 20 Lineal

Foot CQ $___________ $______________

61102

3-Inch Diameter HDPE Waterline, SDR 11 with Heat Fusion Joints, Including Trenching, Bedding, Backfill & Compaction

1758 Lineal Foot CQ $___________ $______________

61103

1.5-Inch Diameter HDPE Waterline, SDR 11 with Heat Fusion Joints, Including Trenching, Bedding, Backfill & Compaction

33 Lineal Foot CQ $___________ $______________

61104

1-Inch Diameter HDPE Waterline, SDR 11 with Heat Fusion Joints, Including Trenching, Bedding, Backfill & Compaction

264 Lineal Foot CQ $___________ $______________

61105 Gate Valve, 3-Inch 3 Each CQ $___________ $______________

61106 Curb Valve, 1.5-Inch 1 Each CQ $___________ $______________

61107 Curb Valve, 1-Inch 1 Each CQ $___________ $______________

61108 Chlorination Injector Vault Complete 1 Each CQ $___________ $______________

61109 Air Relief Valve Vault Complete 2 Each CQ $___________ $______________

61110 Service Hydrant Complete 2 Each CQ $___________ $______________

61111 Daylight Drain, 3-Inch 3 Each CQ $___________ $______________

61112 Daylight Drain, 1-Inch 1 Each CQ $___________ $______________

61113 Connect to Existing Waterline 3 Each CQ $___________ $______________

61901 Collapsible Steel Bollard 1 Each CQ $___________ $______________

Solicitation No.: 1240LT23R0002

61902 Fee Tube 1 Each CQ $___________ $______________

61903 Logworm Fence 1095 Lineal Foot CQ $___________ $______________

62401 Furnishing & Placing Topsoil 220 Cubic Yard CQ $___________ $______________

62501 Seeding (Upland) 6 Acre CQ $___________ $______________

63301 Permanent Signing – FS Road #214 1 Lump

Sum LSQ $___________ $______________

63302 Permanent Signing – Visitor Center Access Road & Parking Lot

1 Lump Sum LSQ $___________ $______________

63303 Permanent Signing – North Shore Access Road, Parking Lot & Day-Use Area

1 Lump Sum LSQ $___________ $______________

63401 Permanent Pavement Striping – FS Road #214 1 Lump

Sum LSQ $___________ $______________

63402 Permanent Pavement Striping – Visitor Center Access Road & Parking Lot

1 Lump Sum LSQ $___________ $______________

63403 Permanent Pavement Striping – North Shore Access Road & Parking Lot

1 Lump Sum LSQ $___________ $______________

63501 Temporary Traffic Control 1 Lump

TOTAL BASE BID – NORTH SHORE AREA $_____________________

Option Item #1a (North Shore Day-Use Area Reconstruction) Government – Furnished Site Furniture

Item No. Description Qty Unit of Measure

Method of Measure Unit Price Total Price

15101(1a) Mobilization 1 Lump Sum LSQ $___________ $______________

15201(1a) Construction Staking 1 Lump Sum LSQ $___________ $______________

15401(1a) Contractor Testing 1 Lump Sum LSQ $___________ $______________

20101(1a) Clearing & Grubbing 1 Lump Sum LSQ $___________ $______________

20301(1a) Removal of Structures and Obstructions 1 Lump

Sum LSQ $___________ $______________

21101(1a)

Roadway Obliteration, Full Recontouring (Former North Shore Parking Lot, Approach, & Trails)

1 Lump Sum LSQ $___________ $______________

62801(1a) North Shore Day-Use Area Primary Trail Construction 354 Lineal

Foot CQ $___________ $______________

Solicitation No.: 1240LT23R0002

62802(1a) North Shore Day-Use Area Secondary Trail Construction 1142 Lineal

Foot CQ $___________ $______________

62803(1a) Family Unit Complete (Gov’t Furnished Furniture) 2 Each CQ $___________ $______________

62804(1a) Group Site ‘A’ Unit Complete (Gov’t Furnished Furniture) 1 Each CQ $___________ $______________

62805(1a) Group Site ‘B’ Unit Complete (Gov’t Furnished Furniture) 1 Each CQ $___________ $______________

TOTAL OPTION ITEM #1a $_____________________

Option Item #1b (North Shore Day-Use Area Reconstruction) Contractor – Furnished Site Furniture

Item No. Description Qty Unit of Measure

Method of Measure Unit Price Total Price

15101(1b) Mobilization 1 Lump Sum LSQ $___________ $______________

15201(1b) Construction Staking 1 Lump Sum LSQ $___________ $______________

15401(1b) Contractor Testing 1 Lump Sum LSQ $___________ $______________

20101(1b) Clearing & Grubbing 1 Lump Sum LSQ $___________ $______________

20301(1b) Removal of Structures and Obstructions 1 Lump

Sum LSQ $___________ $______________

21101(1b)

Roadway Obliteration, Full Recontouring (Former North Shore Parking Lot, Approach, & Trails)

1 Lump Sum LSQ $___________ $______________

62801(1b) North Shore Day-Use Area Primary Trail Construction 354 Lineal

Foot CQ $___________ $______________

62802(1b) North Shore Day-Use Area Secondary Trail Construction 1142 Lineal

Foot CQ $___________ $______________

62803(1b) Family Unit Complete 2 Each CQ $___________ $______________

62804(1b) Group Site ‘A’ Unit Complete 1 Each CQ $___________ $______________

62805(1b) Group Site ‘B’ Unit Complete 1 Each CQ $___________ $______________

TOTAL OPTION ITEM #1b $_____________________

Solicitation No.: 1240LT23R0002

Option Item #2 (North Shore Day-Use Area Pavilion)

Measure

Method of Measure Unit Price Total Price

15101(2) Mobilization 1 Lump Sum LSQ $___________ $______________

15401(2) Construction Testing 1 Lump Sum LSQ $___________ $______________

62801(2) Treated Timber Pavilion Complete 1 Lump

TOTAL OPTION ITEM #2 $_____________________

TOTAL BASE BID – ENTRANCE AREA $_____________________

TOTAL BASE BID – ROUNDABOUT AREA $_____________________

TOTAL BASE BID – NORTH SHORE AREA $_____________________

TOTAL BASE BID PROJECT PROPOSAL (BASE BID –

ENTRANCE AREA plus BASE BID – ROUNDABOUT AREA plus BASE BID – NORTH SHORE AREA)

TOTAL OPTION ITEM #1A $_____________________

TOTAL OPTION ITEM #1B $_____________________

TOTAL OPTION ITEM #2 $_____________________

TOTAL PROJECT PROPOSAL (BASE BID TOTAL plus OPTION ITEM #1a) $_____________________

OPTION ITEM #1b) $_____________________

OPTION ITEM #1a plus OPTION ITEM #2) $_____________________

OPTION ITEM #1b plus OPTION ITEM #2) $_____________________

* Designated Method of Measurement:

CQ – Contract Quantities, AQ - Actual Quantities, LSQ - Lump Sum Quantities

B.2 SCHEDULE NOTES

a) Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.

b) One award will be made from this solicitation, contractors must submit pricing for all items.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

Furnish all labor, equipment and materials necessary to accomplish the work under this contract. This project will reconstruct existing paved/gravel roads, parking lots, and trails along Forest Road #214 within the Redfish Lake Recreation Complex. Work will occur at three primary locations as follows:

1. Entrance Area

~2,150 lineal feet of new asphalt roadway from State Highway 75 to the Phase 1 project limits including a slight re-route to accommodate construction of a new 18-vehicle gravel Entrance Station parking lot and ~600 lineal feet of new gravel trail.

2. Roundabout Area

~250 lineal feet of new asphalt roadway pullout including signing, striping, and barrier rock relocation.

Remove three existing destination signs at the roundabout intersection for Forest Roads #214 and #214A and replace with six new destination signs having larger font, symbols, and more concise verbiage.

3. North Shore Area

~3,110 lineal feet of new asphalt roadway from the Phase 1 project limits to the entrance of the Glacier View Campground including a re-route away from the lakeshore to accommodate construction of a new 26-vehicle paved Visitor Center parking lot and access roadway, and a new 44-vehicle paved North Shore parking lot and access roadway.

~1,775 lineal feet of new asphalt trail along the lakeshore (former FS Road #214 and service road/trail), including construction of a new underlying distribution waterline and various services.

Reconstruct the North Shore Day Use Area including site amenities.

Remove/Rehab/Recontour the existing Visitor Center / North Shore parking lots, a former paved service road, and various former road cut/fill sections to render these areas returned to their pre-developed state.

Construction includes, but is not limited to, construction survey and staking, clearing and grubbing, extensive earthwork including excavation & embankment, rock/boulder removal, installation of drainage facilities consisting of culverts and roadside ditches, installation of new waterline piping, service connections, and other appurtenances, minor sanitary sewer manhole adjustments, signing, striping, existing asphalt and underlying aggregate base pulverizing, new asphalt road/parking/trail construction, and construction of other miscellaneous improvements as required.

C.2 PROJECT LOCATION

From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road #214. This represents the point of beginning of the Entrance Area. From there proceed approximately 0.40 miles along the existing Forest Road #214 to the Chinook Bay Campground exit approach which marks the point of ending of the Entrance Area. From there, proceed approximately 1.20 miles along the existing Forest Road #214 to the Redfish Phase 1 limits which marks the point of beginning of the North Shore Area. From there, proceed approximately 0.60 miles along the existing Forest Road #214 to the Glacier View Campground entrance which marks the point of ending of the North Shore Area.

Solicitation No.: 1240LT23R0002

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

Between $1,000,000 and $5,000,000.

C.4 TECHNICAL SPECIFICATIONS

Standard Specifications (FP-14) and the attached Forest Service Supplemental Specifications (FSSS), including applicable “CSI Specs” Supplemental Specifications, are applicable to this Public Works contract. All applicable FSSS, including “CSI Specs” Supplemental Specifications, are included in full text. All specifications not included in the specification listing but referenced by listed specifications are applicable. Standard Specifications (FP-14) are available in pdf format on-line at https://highways.dot.gov/federal-lands/specs .

C.5 BIOBASED PRODUCT UTILIZATION

The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C.

8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.

The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).

The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Hydraulic Fluids Penetrating Lubricants Degreasers Absorbents Diesel Fuel Additives Greases Dust Suppressants 2-Cycle Engine Oil Sorbents Adhesive and Mastic Removers Cleaners Concrete/Asphalt Release Fluids Composite Panels Sealers Wood and Concrete Sealers Graffiti and Grease Removers Stain Removers Metalworking Fluids

Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.

In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.

https://highways.dot.gov/federal-lands/specs http://www.biopreferred.gov/

Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements.

The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).

A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.

452.211-72 Statement of Work/Specifications (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.211-13 Time Extensions (SEP 2000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31, 2024. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at virtually via Teams meeting.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

452.228-71 Insurance Coverage (NOV 1996)

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of $200,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel: FOREMAN.

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.2 OTHER REQUIREMENTS

USE OF PREMISES

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

Use of Premises (Camping):

Camping will also be available for contract personnel at the Redfish Lake Pit site noted on the drawings and will be limited to a maximum of two camp trailers. Camping will also be available at either the #210 Road Pit or the Champion Creek Pit. If any of these sites are used then the Contractor shall supply the number of toilet facilities (porta-potty) necessary for the amount of personnel who will be camping in these locations. Disturbance to the sites shall be minimized, weed-free prevention practices shall be followed, and appropriate camp site cleanliness/etiquette shall be met.

ARCHAEOLOGICAL OR HISTORIC SITES

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION

(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.

FIRE PROTECTION AND SUPPRESSION PLAN

This plan outlines the channels of responsibility for fire prevention and suppression activities and sets up an attack procedure in the event of fire within the Project Area. The Project Area is defined as that area which is in and adjacent to the project rights-of-way and work areas and all roads used in connection with the work.

I. RESPONSIBILITIES

A. Contractor Fire Suppression

1. It is understood and agreed that the Contractor will do all in his power to prevent and suppress fires on or adjacent to the Project Area, as stipulated in the contract.

2. Is responsible for and will direct all fires activities on the project until relieved by a Forest Officer and will insure that prevention and suppression action are in accordance with contract requirements, including this fire plan. He will delegate the next higher in authority on the job to be responsible for the above activities when he is not on the project.

3. In line with this agreement, men will be supplied from the Contractor's crew to fight fires on the project area up to the total number of men employed by the Contractor as they are needed by the Fire Boss. The Forest Service will make every effort to avoid calling on the Contractor for action on fires outside the Contract project area except in emergencies and will call out all needed available help to control fires in the general area.

4. The Contractor issures that this Fire Plan will be complied with by him and his employees for the duration of the contract.

B. Forest Service District Ranger

1. Is responsible for all fire activities on the Ranger District on which the contract project is located. He or his representative will discuss the fire plan with the Contractor and will discuss with him the equipment and manpower action to be taken when a fire occurs. He will notify the Contractor through the Contracting Officer's Representative (COR) to take correction measures when fire requirements are not complied with.

II. CONTRACTOR'S RESPONSIBILITY WHEN A FIRE OCCURS WITHIN THE CONTRACT

PROJECT AREA

A. He will immediately send the entire contract crew with tools and equipment to the fire and take initial-attack suppression action.

B. B. Immediately notify the nearest Forest Service Fire Control Officer or other Forest Service employee of fire location and action taken.

C. Designate a man to act as dispatcher who will handle messages and initiate action upon request until relieved.

III. CONTRACTOR FURNISHED MANPOWER, TOOLS, AND EQUIPMENT REQUIRED ON ALL

CONTRACTS (PROJECTS) DURING FIRE SEASON

A. The Contractor shall furnish to the COR a list of manpower and equipment used on the contract on forms furnished by the Forest Service. Changes in Contractor's personnel shall be reflected in amendment to the list.

Fire Prevention Smoking. Will be prohibited in the woods during the fire season, May 10 through October 20, except in areas agreed upon by the Contractor and Contracting Officer's Representative. No smoking is permitted while walking or working in the woods.

Refueling Chainsaw/Soil Auger. Refueling will be confined to a six-foot diameter cleared to mineral earth.

Chainsaws/soil auger sparks arrester shall be U.S. Forest Service approved, and will be cleaned daily. A size "0" or larger round-pointed shovel with a minimum of a 38-1/2" handle and a fire extinguisher shall be within 10 feet of actual point of chainsaw/soil auger operation.

Burning, Blasting, or Welding. Permit will be required and will contain special stipulations pertinent to the particular job.

Spark Arresters. All internal combustion power equipment used by the Contractor on the project shall be equipped with an approved spark arrester as set forth in the publication of the USDA Forest Service, entitled "Standard 5100-1a for Spark Arresters for Internal Combustion Engines" as amended under date of July 1970, and be listed in the most recent "Spark Arrester Guide" as having been approved as meeting above standard. They shall be cleaned regularly and maintained in satisfactory working condition. The following are exempt from the requirements of the rule:

1. Turbo-charged internal combustion engines in which 100 percent of the exhaust gasses pass through a turbo-charged;

2. Engines of passenger carrying vehicles and light trucks equipped with a muffler with baffles that are kept in good repair (glass packs are not an approved muffler for wildland work);

3. Water pumping equipment used in firefighting.

Spark arresters must comply with all State and Federal fire requirements.

Lunch and Warming Fires. Cooking and warming fires will not normally be permitted and then only by written permit by the COR which contain stipulations regulating use of such fires.

Hand Tools. The Contractor shall furnish one size "0" shovel (38-1/2" handle minimum) or larger, one axe, or pulaski with 26" handle or larger, and one 5 BC or larger rated pressurized fire extinguisher for each truck, each personal vehicle, each tractor, and each grader. For each welder he shall furnish one size "0" shovel and one backpump pump. For each gasoline power tools (power saw, soil auger, etc.), one shovel (38-1/2" handle minimum) and one 8-ounce or larger BC rated chemical-pressurized fire extinguisher.

Contractor shall also furnish any other equipment called for elsewhere in the contract. The shovel and fire extinguisher will be located within 10feet of the operating chainsaw/power auger.

Storage and Parking Areas. Equipment service area, parking area, and gas and oil drum storage areas will be cleared of all flammable material for a radius of at least fifty feet. These areas must be approved in writing by the Contracting Officer's Representative in advance of use. Small stationary engine sites shall be cleared of flammable material for a radius of at least fifteen feet from such engine.

Fire Tool Box. A red fire tool box will be required to be on each work site while work is being performed. This fire tool box will contain sufficient tools to equip all persons engaged in Contractor's operation. Fire tools shall be used only for suppressing wildfires. Tools shall be stored in fireboxes provided by the Contractor and readily available to employees. Each tool box shall be marked, "Tools for Fire Only." The COR will inspect the fire tool box and then seal the box.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at: Policies & Regulations | USDA

52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of

Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (NOV 2021) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment (NOV 2021) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data (AUG 2011) 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications (JUN 2020) 52.215-12 Subcontractor Certified Cost or Pricing Data (JUN 2020) 52.215-13 Subcontractor Certified Cost or Pricing Data (JUN 2020) 52.215-15 Pension Adjustments and Asset Reversions (OCT 2010)

Solicitation No.: 1240LT23R0002 https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.usda.gov/da/ocp/ppd/policies-regulations

52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions (JUL 2005)

52.215-19 Notification of Ownership Changes (OCT 1997) 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing

Data (NOV 2021) 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing

Data – Modifications (NOV 2021) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2022) (DEVIATION DEC 2022) 52.219-9 Small Business Subcontracting Plan (OCT 2022) 52.219-10 Incentive Subcontracting Program (OCT 2014) 52.219-14 Limitations on Subcontracting (OCT 2022)

[Contracting Officer check as appropriate.] ☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☐ By the end of the performance period for each order issued under the contract.

52.219-16 Liquidated Damages --Subcontracting Plan (SEP 2021) 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2022) 52.219-28 Post Award Small Business Program Rerepresentation (OCT 2022) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing

Method) (AUG 2018) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (MAY 2022) 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN 2022) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP

2013) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (FEB 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001)

Solicitation No.: 1240LT23R0002

52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG 2018)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-1…