Task List Option Base Year Task Description UOM Qty Unti Price Total 1 Install Relay Rail 110RE 39' Ea 10 2 Remove rail ea 10 3 Remove/replace Joint Bars 110 RE Pr 20 4 Remove/replace Compromise Joint Bars 110 RE Pr 5 5 Remove/replace Insulated Joint Bars 110 RE Pr 5 6 Remove/replace switch stands Ea 3 7 Remove/replace Switch Point Ea 2 8 Remove/replace Frog #8/110RE Ea 2 9 Remove/replace Frog #10/110RE Ea 2 10 Remove/replace Guard Rail Ea 5 11 Remove/replace Wooden Guard Rail Lf 500 12 Remove/replace Roadway Track Concrete Crossing Sy 1300 13 Remove/replace Roadway Track Wooden Crossing Lf 1000 14 Remove/replace Rail Braces Ea 5 15 Remove/replace Crossties Composite Ea 2500 16 Remove/replace Switch ties wooden Lf 1000 17 Remove/replace Wooden Bridge Ties 6" x 8" x 9' Ea 300 18 Remove/replace Wooden Bridge Ties 6" x 7" x 9' Ea 300 19 Remove/replace Wooden Bridge Ties 6" x 8" x 10' Ea 300 20 Remove/replace Wooden Bridge Ties 8" x 10" x 10' Ea 300 21 Remove/replace Wooden Bridge Ties 7" x 8" x 10' Ea 300 22 Remove/replace Wooden Bridge Ties 7" x 8" x 16' Ea 300 23 Remove/replace Open Deck Bridge Ties Ea 250 24 Install Steel Ties Ea 250 25 Remove ties Ea 100 26 Install Ballast tn 10,000 27 Install Sub ballast tn 10,000 28 Install Track Spikes Kg 25 29 Install Screw Spikes Kg 25 30 Install Track Bolt Assemblies Ea 250 31 Install Tie Plates Single/Double Shoulder Ea 250 32 Install Rail Anchors Ea 350
33 Remove/replace Bumpers Ea 1 34 Remove/replace Bump post Ea 1 35 Remove/replace Fastenings Ea 10 36 Remove/replace Inner Guard Rail Lf 50 37 Remove/replace Gage Rods Ea 5 38 Thermite Rail Welding Ea 5 39 Electric Arc Welding Ea 5 40 Rail Joint Gap Adjustment Ea 5 41 Rail Joint Repair Ea 5 42 Rail Cropping Ea 5 43 Tighten Bolts Ea 60 44 Track construction Ea 1 45 Rail Bonds Ea 10 46 Rail Grounds Ea 10 47 Tamp/regulate/Profile and Alignment track Lf 1000 48 Profile Grinding Lf 5280 49 Vegetation removal Ac 1,000 50 Ditching Lf 7,500 51 Inner Guard Rail Timber Bridge lf 500 52 Cad Welding Ea 2
Total
Task List Option Year 1
1 Install Relay Rail 110RE 39' Ea 10 2 Remove rail ea 10 3 Remove/replace Joint Bars 110 RE Pr 20 4 Remove/replace Compromise Joint Bars 110 RE Pr 5 5 Remove/replace Insulated Joint Bars 110 RE Pr 5 6 Remove/replace switch stands Ea 3 7 Remove/replace Switch Point Ea 2 8 Remove/replace Frog #8/110RE Ea 2 9 Remove/replace Frog #10/110RE Ea 2 10 Remove/replace Guard Rail Ea 5 11 Remove/replace Wooden Guard Rail Lf 500 12 Remove/replace Roadway Track Concrete Crossing Sy 1300 13 Remove/replace Roadway Track Wooden Crossing Lf 1000 14 Remove/replace Rail Braces Ea 5 15 Remove/replace Crossties Composite Ea 2500 16 Remove/replace Switch ties wooden Lf 1000 17 Remove/replace Wooden Bridge Ties 6" x 8" x 9' Ea 300 18 Remove/replace Wooden Bridge Ties 6" x 7" x 9' Ea 300 19 Remove/replace Wooden Bridge Ties 6" x 8" x 10' Ea 300 20 Remove/replace Wooden Bridge Ties 8" x 10" x 10' Ea 300 21 Remove/replace Wooden Bridge Ties 7" x 8" x 10' Ea 300 22 Remove/replace Wooden Bridge Ties 7" x 8" x 16' Ea 300 23 Remove/replace Open Deck Bridge Ties Ea 250 24 Install Steel Ties Ea 250 25 Remove ties Ea 100 26 Install Ballast tn 10,000 27 Install Sub ballast tn 10,000 28 Install Track Spikes Kg 25 29 Install Screw Spikes Kg 25 30 Install Track Bolt Assemblies Ea 250
34 Remove/replace Bump post Ea 1 35 Remove/replace Fastenings Ea 10 36 Remove/replace Inner Guard Rail Lf 50 37 Remove/replace Gage Rods Ea 5 38 Thermite Rail Welding Ea 5 39 Electric Arc Welding Ea 5 40 Rail Joint Gap Adjustment Ea 5 41 Rail Joint Repair Ea 5 42 Rail Cropping Ea 5 43 Tighten Bolts Ea 60 44 Track construction Ea 1 45 Rail Bonds Ea 10 46 Rail Grounds Ea 10 47 Tamp/regulate/Profile and Alignment track Lf 1000 48 Profile Grinding Lf 5280 49 Vegetation removal Ac 1,000 50 Ditching Lf 7,500 51 Inner Guard Rail Timber Bridge lf 500
Task List Option Year 2
1 Install Relay Rail 110RE 39' Ea 10 2 Remove rail ea 10 3 Remove/replace Joint Bars 110 RE Pr 20 4 Remove/replace Compromise Joint Bars 110 RE Pr 5 5 Remove/replace Insulated Joint Bars 110 RE Pr 5 6 Remove/replace switch stands Ea 3 7 Remove/replace Switch Point Ea 2 8 Remove/replace Frog #8/110RE Ea 2 9 Remove/replace Frog #10/110RE Ea 2 10 Remove/replace Guard Rail Ea 5 11 Remove/replace Wooden Guard Rail Lf 500 12 Remove/replace Roadway Track Concrete Crossing Sy 1300 13 Remove/replace Roadway Track Wooden Crossing Lf 1000 14 Remove/replace Rail Braces Ea 5 15 Remove/replace Crossties Composite Ea 2500 16 Remove/replace Switch ties wooden Lf 1000 17 Remove/replace Wooden Bridge Ties 6" x 8" x 9' Ea 300 18 Remove/replace Wooden Bridge Ties 6" x 7" x 9' Ea 300 19 Remove/replace Wooden Bridge Ties 6" x 8" x 10' Ea 300 20 Remove/replace Wooden Bridge Ties 8" x 10" x 10' Ea 300 21 Remove/replace Wooden Bridge Ties 7" x 8" x 10' Ea 300 22 Remove/replace Wooden Bridge Ties 7" x 8" x 16' Ea 300 23 Remove/replace Open Deck Bridge Ties Ea 250 24 Install Steel Ties Ea 250 25 Remove ties Ea 100 26 Install Ballast tn 10,000 27 Install Sub ballast tn 10,000 28 Install Track Spikes Kg 25 29 Install Screw Spikes Kg 25 30 Install Track Bolt Assemblies Ea 250
34 Remove/replace Bump post Ea 1 35 Remove/replace Fastenings Ea 10 36 Remove/replace Inner Guard Rail Lf 50 37 Remove/replace Gage Rods Ea 5 38 Thermite Rail Welding Ea 5 39 Electric Arc Welding Ea 5 40 Rail Joint Gap Adjustment Ea 5 41 Rail Joint Repair Ea 5 42 Rail Cropping Ea 5 43 Tighten Bolts Ea 60 44 Track construction Ea 1 45 Rail Bonds Ea 10 46 Rail Grounds Ea 10 47 Tamp/regulate/Profile and Alignment track Lf 1000 48 Profile Grinding Lf 5280 49 Vegetation removal Ac 1,000 50 Ditching Lf 7,500 51 Inner Guard Rail Timber Bridge lf 500
Task List Option Year 3
1 Install Relay Rail 110RE 39' Ea 10 2 Remove rail ea 10 3 Remove/replace Joint Bars 110 RE Pr 20 4 Remove/replace Compromise Joint Bars 110 RE Pr 5 5 Remove/replace Insulated Joint Bars 110 RE Pr 5 6 Remove/replace switch stands Ea 3 7 Remove/replace Switch Point Ea 2 8 Remove/replace Frog #8/110RE Ea 2 9 Remove/replace Frog #10/110RE Ea 2 10 Remove/replace Guard Rail Ea 5 11 Remove/replace Wooden Guard Rail Lf 500 12 Remove/replace Roadway Track Concrete Crossing Sy 1300 13 Remove/replace Roadway Track Wooden Crossing Lf 1000 14 Remove/replace Rail Braces Ea 5 15 Remove/replace Crossties Composite Ea 2500 16 Remove/replace Switch ties wooden Lf 1000 17 Remove/replace Wooden Bridge Ties 6" x 8" x 9' Ea 300 18 Remove/replace Wooden Bridge Ties 6" x 7" x 9' Ea 300 19 Remove/replace Wooden Bridge Ties 6" x 8" x 10' Ea 300 20 Remove/replace Wooden Bridge Ties 8" x 10" x 10' Ea 300 21 Remove/replace Wooden Bridge Ties 7" x 8" x 10' Ea 300 22 Remove/replace Wooden Bridge Ties 7" x 8" x 16' Ea 300 23 Remove/replace Open Deck Bridge Ties Ea 250 24 Install Steel Ties Ea 250 25 Remove ties Ea 100 26 Install Ballast tn 10,000 27 Install Sub ballast tn 10,000 28 Install Track Spikes Kg 25 29 Install Screw Spikes Kg 25 30 Install Track Bolt Assemblies Ea 250
33 Remove/replace Bumpers Ea 1 $1,050.00 $1,050.00 34 Remove/replace Bump post Ea 1 35 Remove/replace Fastenings Ea 10 36 Remove/replace Inner Guard Rail Lf 50 37 Remove/replace Gage Rods Ea 5 38 Thermite Rail Welding Ea 5 39 Electric Arc Welding Ea 5 40 Rail Joint Gap Adjustment Ea 5 41 Rail Joint Repair Ea 5 42 Rail Cropping Ea 5 43 Tighten Bolts Ea 60 44 Track construction Ea 1 45 Rail Bonds Ea 10 46 Rail Grounds Ea 10 47 Tamp/regulate/Profile and Alignment track Lf 1000 48 Profile Grinding Lf 5280 49 Vegetation removal Ac 1,000 50 Ditching Lf 7,500 51 Inner Guard Rail Timber Bridge lf 500
| Final task item list Railroad Option Base Year 19 |
| Final task item list Railroad Option Year 1 19 |
| Final task item list Railroad Option Year 2 19 |
| Final task item list Railroad Option Year 3 19 |