ATTACHMENT 4 Calc. of Self Performed Work.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Y1DA--Project # 596A4-24-101 - Construction to Replace Main Electrical Distribution Equipment
- Solicitation number
- 36C24926R0073
About this file
This file is a calculation template for self-performed work that contractors must complete as part of their proposal submission for construction services. The spreadsheet is designed to document and calculate the percentage of work that the prime contractor will perform directly with its own forces, as opposed to subcontracting portions of the project. This submission requirement is typical for federal construction solicitations where agencies want visibility into contractor capability and direct involvement in project execution.
The template functions as a financial and operational disclosure tool, requiring contractors to itemize labor, materials, and equipment costs associated with self-performed activities for the electrical distribution equipment replacement project at the Veterans Health Administration facility. By completing this calculation sheet, bidders demonstrate their capacity to manage the $596,A4-24-101 project scope while meeting any applicable self-performance thresholds that may be mandated in the solicitation terms. The file supports evaluation criteria related to contractor responsibility and construction experience for this VA project under Solicitation 36C24926R0073.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24926R0073 0005.docx | DOCX document | |
| Addendum 001_Scope Clarification.pdf | ||
| 36C24926R0073 0004.docx | DOCX document | |
| Solicitation Questions and Answers 2_36C24926R0073.pdf | ||
| 36C24926R0073 0003.docx | DOCX document | |
| VAMC_LEX_Bowling.pdf | ||
| Solicitation Questions and Answers_36C24926R0073.pdf | ||
| 36C24926R0073 0002.docx | DOCX document | |
| SK_TB MV_01.pdf | ||
| Site Visit Sign-in Sheet_36C24926R0073.pdf | ||
| 36C24926R0073 0001.docx | DOCX document | |
| ATTACHMENT 9 DBA Wage Determination KY20260090 5-18-2026.pdf | ||
| ATTACHMENT 6 General Conditions Breakout.xlsx | XLSX spreadsheet | |
| ATTACHMENT 5 Contractor EMR Certification Form.docx | DOCX document | |
| ATTACHMENT 8 Past Performance Questionnaire 596A4-24-101.pdf | ||
| ATTACHMENT 2 Project Specifications - Coordination Study 596A4-24-101.pdf | ||
| ATTACHMENT 1 Project Specifications 596A4-24-101.pdf | ||
| ATTACHMENT 7 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| ATTACHMENT 3 Project Drawings 596A4-24-101.pdf | ||
| 36C24926R0073_1.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | ||||||
| Offerors for All Other Specialty Trade Contractors (NAICS code 23xxxxx) must provide | ||||||
| at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | ||||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | |||
| Prime | Y | $0.00 | $0.00 | Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only. | ||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | ||||
| $ - 0 | $0.00 |
| $ | $ | ||||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | Add percentage to gray areas only. | ||
| Percentage | 0 | Profit | $ | 0.00 | |
| Percentage | 0 | Home Office Overhead | $ | 0.00 | |
| Percentage | 0 | Bond | $ | 0.00 | |
| Grand Total | $ | 0.00 | |||
| Calculation of self-performed personnel costs: | |||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | |||||
| on this contract: | $0.00 | ||||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||||
| Contract’: | $0.00 | ||||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .