Solicitation Questions and Answers 2_36C24926R0073.pdf
PDF 91 KB Posted
- Attached to
- Y1DA--Project # 596A4-24-101 - Construction to Replace Main Electrical Distribution Equipment
- Solicitation number
- 36C24926R0073
About this file
This is a Questions and Answers document (Q&A 2) for federal solicitation 36C24926R0073. The document addresses two key proposal submission requirements clarified through frequently asked questions.
The first question concerns the VETS 4212 Reporting Requirement detailed on page 17 of the solicitation. The contracting officer clarified that offerors must submit their most recent VETS 4212 report with their proposal rather than treating it solely as a post-award contract requirement. The second question addresses past performance documentation requirements, specifically whether offerors must submit both a Past Performance Questionnaire (PPQ) and Contractor Performance Assessment Reporting System (CPARS) report for previous projects. The contracting officer stated that CPARS reports can be submitted in lieu of PPQs if PPQs cannot be obtained from past contracting officers, providing flexibility for offerors who face difficulty obtaining completed PPQs from previous government clients.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24926R0073 0005.docx | DOCX document | |
| Addendum 001_Scope Clarification.pdf | ||
| 36C24926R0073 0004.docx | DOCX document | |
| 36C24926R0073 0003.docx | DOCX document | |
| Solicitation Questions and Answers_36C24926R0073.pdf | ||
| VAMC_LEX_Bowling.pdf | ||
| 36C24926R0073 0002.docx | DOCX document | |
| SK_TB MV_01.pdf | ||
| Site Visit Sign-in Sheet_36C24926R0073.pdf | ||
| 36C24926R0073 0001.docx | DOCX document | |
| ATTACHMENT 6 General Conditions Breakout.xlsx | XLSX spreadsheet | |
| ATTACHMENT 8 Past Performance Questionnaire 596A4-24-101.pdf | ||
| ATTACHMENT 5 Contractor EMR Certification Form.docx | DOCX document | |
| ATTACHMENT 7 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| ATTACHMENT 3 Project Drawings 596A4-24-101.pdf | ||
| ATTACHMENT 2 Project Specifications - Coordination Study 596A4-24-101.pdf | ||
| ATTACHMENT 1 Project Specifications 596A4-24-101.pdf | ||
| ATTACHMENT 9 DBA Wage Determination KY20260090 5-18-2026.pdf | ||
| ATTACHMENT 4 Calc. of Self Performed Work.xlsx | XLSX spreadsheet | |
| 36C24926R0073_1.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # 36C24926R0073
Questions & Answers 2
76. Page 17 of the Solicitation details the VETS 4212 Reporting Requirement. Do we need to submit our most recent VETS4212 report with our proposal or is the Solicitation simply stating that this is a contract requirement if/when awarded?
Answer: Submit with proposal.
77. Often times, a PPQ is required for Past Performance if a CPARS is not available for a past project. Is the requirement on this proposal that we have to provide BOTH a PPQ and CPARS for our past projects? If our past projects have CPARS reports, can we submit those without the need for also obtaining a PPQ? It has gotten increasingly difficult to obtain completed PPQ’s from past CO’s.
Answer: CPARS can be submitted in lieu of PPQ’s if PPQ’s cannot be obtained.
END OF SOLICITATION QUESTIONS AND ANSWERS 2