ATTACHMENT 4_ BUILDING MAP.pdf
PDF 113 KB Posted
- Attached to
- Camino Real RD Janitorial Federal contract opportunity
- Solicitation number
- 127EAV26Q0033
About this file
This document is a facilities diagram for the Camino Real Ranger District Employee Emergency Evacuation Plan, illustrating emergency exits, fire extinguisher locations, and building layout. The diagram depicts a multi-building complex with designated room numbers ranging from 100 to 124, organized into sections A, B, C, and D. The main structure includes a Camino Real Ranger District Building with two wings containing offices and operational spaces, connected to a patio area. Two emergency exits are clearly marked with directional arrows—one accessible via the patio and another on the eastern side of the facility. Fire extinguishers are positioned at multiple strategic locations throughout the complex, indicated by circular markers. Wheelchair-accessible entrances and exits are specifically identified on the diagram to ensure ADA compliance during emergency evacuations. A compass rose indicates cardinal directions, with the primary access corridor running east-west through the patio area that serves as a central circulation hub connecting the various building sections.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QUESTIONS.pdf | ||
| ATTACHMENT 1_SOLICITATION TERMS AND CONDITIONS.pdf | ||
| ATTACHMENT 2_SF1449_SOI_PWS.pdf | ||
| ATTACHMENT 1_SOLICITATION TERMS AND CONDITIONS.pdf | ||
| ATTACHMENT 2_SF1449_SOI_PWS.pdf | ||
| ATTACHMENT 1_SOLICITATION TERMS AND CONDITIONS.pdf | ||
| ATTACHMENT 3_WAGE DETERMINATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
118 116 114 120 122 124
113 117 119 115
PATIO
A
B
C
D
File details come from the government source that posted it. Updated .