Attachment 4 - Bid Chart Base Camp.xls

XLS spreadsheet 840 KB Posted

Attached to
Sierpe River Sinac and Border Police Base Camp Construction
Solicitation number
19AQMM22R0232
Issued by

About this file

This document contains an attachment with a bid chart for the provision and installation of demountable containers for a base camp in Sierpe, Costa Rica.

The bid chart outlines costs for infrastructure work including demolitions, designs, leveling, excavation, backfilling, concrete platforms, access roads, electric and water connections, septic and sewer systems. It also includes costs for provision and installation of container units for men's and women's barracks with bathrooms, offices, storage, and a kitchen/dining room. Furniture and equipment costs are outlined for bunk beds, mattresses, lockers, desks, cabinets, work stations, file cabinets, privacy screens, chairs, tables and kitchen items including a stove, exhaust hood, refrigerators, pantry cabinet and microwave. A subtotal is provided for direct costs with additional line items for DBA costs and overhead to calculate a total projected cost.

The related federal contract opportunity is solicitation number 19AQMM22R0232 from the Department of State Office of Acquisition Management for the construction of the Sierpe River Sinac and Border Police Base Camp.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BREAKDOWN

PROVISION AND INSTALLATION OF DEMONTABLE
CONTAINERS CAMP FOR SINAC
SIERPE, COSTA RICA
Bid Chart
ITEMDESCRIPTIONUNITQTY.LABOR COSTMATERIALS COSTTOTAL
UNIT COSTTOTAL COSTUNIT COSTTOTAL COST
1INFRASTRUCTURE
1.1Demolitionsglb
1.2Designsglb
1.2Levelingm2
1.3Excavationm3
1.4Backfillingm3
1.5Reinforced Concrete Platfomm3
1.6Concrete Access Roadm3
1.7Electric Connectionglb
1.8Water Conectionm
1.9Water tank with hydro-pneumatic systemglb
1.10Septic tank (4m3 capacity)u
1.11Inspection boxesu
1.12Swewage networkm
2PROVISION AND INSTALLATION OF CONTAINERS
2.1Container for Men's Barracks (includes bathrooms)u2
2.2Container for Women's Barracks (includes bathrooms)u2
2.3Container for Officeu2
2.4Container for storageu2
2.4Container for Kitchen & Dinning Roomu1
3FURNITURE AND EQUIPMENTm2
3.1Metallic heavy duty bunk bedsu12
3.2Heavy duty mattresses 10" in high for bunk beds.u24
3.3Metallic lockers w23" x d23" x h71"u12
3.4Desk 72"x25" / minimalist designu6
3.5Metallic cabinet with mirroru6
3.6Work stationsu6
3.7Metallic file cabinets 4 file letter size drawersu6
3.8Privacy screen (1.50x1.50 m)u2
3.9Chair for work stationu6
3.10Rectangular table with 4 chairsset3
3.11Stainless steel stove with 5 burners & 1 ovenu1
3.12Stainless steel exhaust hood 34 3/8" widthu1
3.13Stainless steel refrigerator of 25 cubic feetu2
3.14Pantry cabinet with microwaveu1
3.15Microwaveu1
3.16Kitchen upper cabinetsm2.65
3.17Kitchen cabinet base with stainless steel counter top and doorsm4.6
SUBTOTAL (DIRECT COST)- 0- 0- 0
DBA COST15,000.0015,000.00
OVERHEAD
TOTAL PROJECT COST15,000.00- 015,000.00