Attachment 4 - Bid Chart Base Camp.xls
XLS spreadsheet 840 KB Posted
- Solicitation number
- 19AQMM22R0232
About this file
This document contains an attachment with a bid chart for the provision and installation of demountable containers for a base camp in Sierpe, Costa Rica.
The bid chart outlines costs for infrastructure work including demolitions, designs, leveling, excavation, backfilling, concrete platforms, access roads, electric and water connections, septic and sewer systems. It also includes costs for provision and installation of container units for men's and women's barracks with bathrooms, offices, storage, and a kitchen/dining room. Furniture and equipment costs are outlined for bunk beds, mattresses, lockers, desks, cabinets, work stations, file cabinets, privacy screens, chairs, tables and kitchen items including a stove, exhaust hood, refrigerators, pantry cabinet and microwave. A subtotal is provided for direct costs with additional line items for DBA costs and overhead to calculate a total projected cost.
The related federal contract opportunity is solicitation number 19AQMM22R0232 from the Department of State Office of Acquisition Management for the construction of the Sierpe River Sinac and Border Police Base Camp.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BREAKDOWN
| PROVISION AND INSTALLATION OF DEMONTABLE | ||||||||
| CONTAINERS CAMP FOR SINAC | ||||||||
| SIERPE, COSTA RICA | ||||||||
| Bid Chart | ||||||||
| ITEM | DESCRIPTION | UNIT | QTY. | LABOR COST | MATERIALS COST | TOTAL | ||
| UNIT COST | TOTAL COST | UNIT COST | TOTAL COST | |||||
| 1 | INFRASTRUCTURE | |||||||
| 1.1 | Demolitions | glb | ||||||
| 1.2 | Designs | glb | ||||||
| 1.2 | Leveling | m2 | ||||||
| 1.3 | Excavation | m3 | ||||||
| 1.4 | Backfilling | m3 | ||||||
| 1.5 | Reinforced Concrete Platfom | m3 | ||||||
| 1.6 | Concrete Access Road | m3 | ||||||
| 1.7 | Electric Connection | glb | ||||||
| 1.8 | Water Conection | m | ||||||
| 1.9 | Water tank with hydro-pneumatic system | glb | ||||||
| 1.10 | Septic tank (4m3 capacity) | u | ||||||
| 1.11 | Inspection boxes | u | ||||||
| 1.12 | Swewage network | m | ||||||
| 2 | PROVISION AND INSTALLATION OF CONTAINERS | |||||||
| 2.1 | Container for Men's Barracks (includes bathrooms) | u | 2 | |||||
| 2.2 | Container for Women's Barracks (includes bathrooms) | u | 2 | |||||
| 2.3 | Container for Office | u | 2 | |||||
| 2.4 | Container for storage | u | 2 | |||||
| 2.4 | Container for Kitchen & Dinning Room | u | 1 | |||||
| 3 | FURNITURE AND EQUIPMENT | m2 | ||||||
| 3.1 | Metallic heavy duty bunk beds | u | 12 | |||||
| 3.2 | Heavy duty mattresses 10" in high for bunk beds. | u | 24 | |||||
| 3.3 | Metallic lockers w23" x d23" x h71" | u | 12 | |||||
| 3.4 | Desk 72"x25" / minimalist design | u | 6 | |||||
| 3.5 | Metallic cabinet with mirror | u | 6 | |||||
| 3.6 | Work stations | u | 6 | |||||
| 3.7 | Metallic file cabinets 4 file letter size drawers | u | 6 | |||||
| 3.8 | Privacy screen (1.50x1.50 m) | u | 2 | |||||
| 3.9 | Chair for work station | u | 6 | |||||
| 3.10 | Rectangular table with 4 chairs | set | 3 | |||||
| 3.11 | Stainless steel stove with 5 burners & 1 oven | u | 1 | |||||
| 3.12 | Stainless steel exhaust hood 34 3/8" width | u | 1 | |||||
| 3.13 | Stainless steel refrigerator of 25 cubic feet | u | 2 | |||||
| 3.14 | Pantry cabinet with microwave | u | 1 | |||||
| 3.15 | Microwave | u | 1 | |||||
| 3.16 | Kitchen upper cabinets | m | 2.65 | |||||
| 3.17 | Kitchen cabinet base with stainless steel counter top and doors | m | 4.6 | |||||
| SUBTOTAL (DIRECT COST) | - 0 | - 0 | - 0 | |||||
| DBA COST | 15,000.00 | 15,000.00 | ||||||
| OVERHEAD | ||||||||
| TOTAL PROJECT COST | 15,000.00 | - 0 | 15,000.00 |