Attachment 4 - AF66 Material Submittal Upgrade Security (B310).xls
XLS spreadsheet 52 KB Posted
- Attached to
- WHEELER AAF UPGRADE SECURITY Bldg. 310 Federal contract opportunity
- Solicitation number
- FA521521R0031
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA521521R00310002 SF 30.pdf | ||
| Attachment 7 - Questions and Answers.pdf | ||
| Attachment 6 - Site Visit Sign in.pdf | ||
| Solicitation Amendment FA521521R00310001 SF 30.pdf | ||
| Attachment 5 - Wage Determination HI20210001.pdf | ||
| Attachment 3 - B310 Front Entrance Photos.pdf | ||
| Attachment 1 - SOW.pdf | ||
| Attachment 2 - B310 Door Schedule and Details.pdf | ||
| Solicitation - FA521521R0031.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| YVEW210001 | Project Title: | ||
| Upgrade Security (B310) | Solicitation / Contract Number: |
TBD
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||
| Number of Copies Required | Required Submission Date | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop and/or As-built Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data & MSDS Sheets | Test Reports | Field Reports | Other | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | |||||
| Notified | Contractor Resubmittal | Final Approval | |||||||||||||||||||||
| Approved | Disapproved | ||||||||||||||||||||||
| 1 | 08 43 00 Storefront Assembly | X | X | X | X | Per section 8 | |||||||||||||||||
| 2 | 08 71 00 Door Hardware | X | X | X | Per section 8 | ||||||||||||||||||
| 3 | 08 81 00 Glass Glazing | X | X | Per section 8 | |||||||||||||||||||
| 4 | AF Form 3064 | X | Per section 8 | ||||||||||||||||||||
| 5 | Construction Schedule | X | Per section 8 | ||||||||||||||||||||
| 6 | SF 1413 | X | Per section 8 | ||||||||||||||||||||
| 7 | Installation Warranty | X | Per section 8 | ||||||||||||||||||||
| 8 | As-Builts | X | Per Section 8 | ||||||||||||||||||||
| 9 | |||||||||||||||||||||||
| 10 | |||||||||||||||||||||||
| 11 | |||||||||||||||||||||||
| 12 | |||||||||||||||||||||||
| 13 | |||||||||||||||||||||||
| 14 | |||||||||||||||||||||||
| 15 | |||||||||||||||||||||||
| 16 | |||||||||||||||||||||||
| 17 | |||||||||||||||||||||||
| 18 | |||||||||||||||||||||||
| 19 | |||||||||||||||||||||||
| 20 | |||||||||||||||||||||||
| 21 | |||||||||||||||||||||||
| 22 | |||||||||||||||||||||||
| 23 | |||||||||||||||||||||||
| 24 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&L&F&C&D&R&P of &N Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .