This file is a detailed construction cost estimate breakdown for replacing a chiller at the Maxwell Air Force Base-Gunter Annex in Alabama. The project (JUBJ 23-4636) involves installing a 40-ton air-cooled chiller in Building 863 Youth Center, with comprehensive mechanical, electrical, and infrastructure work. The cost estimate covers multiple divisions including mechanical systems (chiller, piping, valves, pumps), electrical components (conduits, wiring, breakers, disconnects), and associated installation tasks such as trenching, concrete work, and system connections. While the spreadsheet contains line-by-line cost breakdown entries, all financial fields are currently populated with $0.00, indicating this is likely a template or preliminary estimate. The solicitation is issued by the Department of the Air Force Air Education and Training Command, with a response deadline of 15 August 2025 at 12:00pm CST.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B863 CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |||||||
| Maxwell Air Force Base Alabama | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPLACE CHILLER, BUILDING 863 YOUTH CENTER | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||||
| JUBJ 23-4636 | Maxwell AFB- Gunter Annex | |||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | d | Manhours | AVERAGE | DIRECT | LINE | ||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| DIVISION 1 (General Requirements) | ||||||||||
| 1.0 | Project Manager | WK | $0.00 | $0.00 | $0.00 | |||||
| 2.0 | Superintendent | WK | $0.00 | $0.00 | $0.00 | |||||
| 3.0 | pickup | EA | $0.00 | $0.00 | $0.00 | |||||
| 4.0 | Crane | WK | $0.00 | $0.00 | $0.00 | |||||
| 5.0 | Tools | Mo | $0.00 | $0.00 | $0.00 | |||||
| 6.0 | Daily cleanup | WK | $0.00 | |||||||
| 7.0 | Truck, 3T | Mo | $0.00 | $0.00 | $0.00 | |||||
| 8.0 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| 9.0 | DIVISION 3 CONCRETE | |||||||||
| 10.0 | DONE BY PRIME CONTRACTOR LABOR | |||||||||
| 11.0 | Forms | Lot | ||||||||
| 12.0 | concrete | CY | ||||||||
| 13.0 | Hand dig pipe support concrete excavations | MH | ||||||||
| 14.0 | Hand dig concrete pad excavations | MH | ||||||||
| 15.0 | ||||||||||
| 16.0 | DIVISION 5 (METALS) | |||||||||
| 17.0 | DONE BY PRIME CONTRACTOR LABOR | |||||||||
| 18.0 | Steel Pipe supports | LB | ||||||||
| 19.0 | Paint supports | lot | ||||||||
| 20.0 | ||||||||||
| 21.0 | DIVISIONS 6-22 N/A | |||||||||
| 22.0 | ||||||||||
| 23.0 | DIVISION 23 (MECHANICAL) | |||||||||
| 24.0 | ||||||||||
| 25.0 | 40T air-cooled chiller | EA | ||||||||
| 26.0 | Heat trace | Lot | ||||||||
| 27.0 | 3" Steel pipe, welded | LF | ||||||||
| 28.0 | 3" Steel 90-degree elbow, welded | EA | ||||||||
| 29.0 | 3" steel Tee, welded | EA | ||||||||
| 30.0 | 3" x 12" flexible SS hose | EA | ||||||||
| 31.0 | 3" WN flanges with B&G Kit | EA | ||||||||
| 32.0 | 3" Blind flange, with B&G Kit | EA | ||||||||
| 32.0 | 3" air/dirt separator | EA | ||||||||
| 33.0 | 3" butterfly valve | EA | ||||||||
| 34.0 | 3" multi-purpose valve | EA | ||||||||
| 35.0 | 3" wye strainer | EA | ||||||||
| 36.0 | 180 gal buffer tank | EA | ||||||||
| 37.0 | 8-gal expansion tank | EA | ||||||||
| 38.0 | 2 hp building pump | EA | ||||||||
| 39.0 | 0.75"water pressure reducing valve | EA | ||||||||
| 40.0 | 0.75 relief valve | EA | ||||||||
| 41.0 | 0.75 backflow preventor with shut-off valves | EA | ||||||||
| 42.0 | 0.75 ball valves | EA | ||||||||
| 43.0 | 0.75" pipe | LF | ||||||||
| 44.0 | 2 hp magnetic starter, material only | EA | ||||||||
| 45.0 | Thermometer | EA | ||||||||
| 46.0 | Pressure gauge | EA | ||||||||
| 47.0 | Automatic air Vents, 0.75" | EA | ||||||||
| 48.0 | Mechanical Subcontractor OH&P | Lot | ||||||||
| 49.0 | ||||||||||
| 50.0 | INSULATION CONTRACTOR | $0.00 | $0.00 | $0.00 | ||||||
| 51.0 | insulate 0.75" piping and accessories | LOT | ||||||||
| 52.0 | insulate expansion tank | EA | ||||||||
| 53.0 | insulate air/dirt separator | EA | ||||||||
| 54.0 | insulate pump | EA | ||||||||
| 55.0 | 3" pipe insulation, foamglass with covering | LF | ||||||||
| 56.0 | 3" Pipe fitting insulation with covering | EA | ||||||||
| 57.0 | Insulation subcontractor OH&P | Lot | ||||||||
| 58.0 | ||||||||||
| 59.0 | TAB CONTRACTOR | |||||||||
| 60.0 | water balance pump | EA | ||||||||
| 61.0 | water balance AHU, chilled water | EA | ||||||||
| 62.0 | TAB contractor travel time from B'hm | MH | ||||||||
| 63.0 | TAB contractor travel expense | miles | ||||||||
| 64.0 | ||||||||||
| 65.0 | CONTROLS CONTRACTOR | |||||||||
| 66.0 | New JACE and programming | EA | ||||||||
| 67.0 | New controller and sensors, chiller | EA | ||||||||
| 68.0 | ||||||||||
| 69.0 | DIVISION 26 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | $0.00 | ||||||
| 70.0 | $0.00 | $0.00 | $0.00 | |||||||
| 71.0 | Remove existing 2" conduit and wiring | LOT | ||||||||
| 72.0 | Remove large disconnect | EA | ||||||||
| 73.0 | Remove 3-phase breaker | EA | ||||||||
| 74.0 | Remove concrete pad over trench | MH | ||||||||
| 75.0 | Trenching for feeder to panel B | LF | ||||||||
| 76.0 | Remove excess soil at trench | MH | ||||||||
| 77.0 | Sand at trench | CY | ||||||||
| 78.0 | concrete over trench | CY | ||||||||
| 79.0 | turf repair | lot | ||||||||
| 80.0 | 400A 3-phase breaker panel, NEMA 3R | EA | ||||||||
| 81.0 | 50A 1-phase breaker panel, NEMA 3R | EA | ||||||||
| 82.0 | 20A 3-phase breaker | EA | ||||||||
| 83.0 | 20A 1-phase breaker | EA | ||||||||
| 84.0 | 250A 3-phase breaker | EA | ||||||||
| 85.0 | 350A 3-phase breaker | EA | ||||||||
| 86.0 | 50A 3-phase breaker | EA | ||||||||
| 87.0 | heavy duty 30A fusible disconnect, NEMA 3R | EA | ||||||||
| 88.0 | Heavy duty 400A disconnect, NEMA 3R | EA | ||||||||
| 89.0 | Connect Chiller wiring | LOT | ||||||||
| 90.0 | Connect pump wiring | LOT | ||||||||
| 91.0 | Connect 120V 1-phase wiring | LOT | ||||||||
| 92.0 | 2" galvanized rigid conduit | LF | ||||||||
| 93.0 | 2" rigid fittings | EA | ||||||||
| 94.0 | 2" PVC conduit | LF | ||||||||
| 95.0 | 2" Flex conduit | EA | ||||||||
| 96.0 | 3" galvanized rigid conduit | LF | ||||||||
| 97.0 | 3" galvanized conduit fittings | EA | ||||||||
| 98.0 | 3" pvc conduit, underground | LF | ||||||||
| 99.0 | 3" flex conduit | EA | ||||||||
| 100.0 | 1" galvanized rigid conduit | LF | ||||||||
| 101.0 | 1" pvc conduit | LF | ||||||||
| 102.0 | 1" rigid fittings | EA | ||||||||
| 103.0 | 0.75" conduit, rigid | LF | ||||||||
| 104.0 | 0.75" conduit, pvc | LF | ||||||||
| 105.0 | .075" flex conduit | EA | ||||||||
| 106.0 | #12 Wire | LF | ||||||||
| 107.0 | #3 wire | LF | ||||||||
| #4 wire | LF | |||||||||
| 108.0 | 300 MCM | LF | ||||||||
| 3/0 wire | LF | |||||||||
| 109.0 | ||||||||||
| 110.0 | Electrical sub OH&P | Lot | ||||||||
| 111.0 | TOTAL ELECTRICAL | $0.00 | $0.00 | $0.00 | ||||||
| 112.0 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 113.0 | Inflation escalation for one year at 5% | $0.00 | $0.00 | $0.00 | ||||||
| 114.0 | Material Costs | $0.00 | $0.00 | |||||||
| 115.0 | Tax on Materials | $0.00 | $0.00 | |||||||
| 116.0 | TOTAL MATERIAL COST | $0.00 | $0.00 | |||||||
| 117.0 | $0.00 | $0.00 | $0.00 | |||||||
| 118.0 | Labor Cost | $0.00 | $0.00 | |||||||
| 119.0 | Insurance & Tax on Labor | $0.00 | $0.00 | |||||||
| 120.0 | TOTAL LABOR COST | $0.00 | $0.00 | |||||||
| 121.0 | $0.00 | $0.00 | $0.00 | |||||||
| 122.0 | Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||||||
| 123.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0.00 | |||||||
| 124.0 | ||||||||||
| 125.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||||||
| 126.0 | $0.00 | $0.00 | $0.00 | |||||||
| 127.0 | Overhead | $0.00 | $0.00 | $0.00 | ||||||
| 128.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 129.0 | Profit | $0.00 | $0.00 | $0.00 | ||||||
| 130.0 | Sub Total | $0.00 | $0.00 | |||||||
| 131.0 | ||||||||||
| 132.0 | Bonds | $0.00 | $0.00 | |||||||
| 133.0 | TOTAL | $0.00 | $0.00 | $0.00 |