Attachment 4 504-24-009 Swing Space ILSM.pdf

PDF 151 KB Posted

Attached to
Z2FZ--37C25724B0016, 504-23-106 Renovate Swing Space, Amarillo, TX 79106
Solicitation number
36C25724B0016
Issued by

About this file

This document is an Interim Life Safety Measures (ILSM) Evaluation for a federal construction project titled "Renovate Swing Space" at the Amarillo VA Health Care System. The project involves renovations to Buildings 12 and 44, including installing walls, mechanical, electrical, and plumbing systems to create swing space.

The ILSM evaluation identifies 12 safety measures that will be implemented to compensate for any life safety code deficiencies or construction hazards, such as ensuring free and unobstructed exits, maintaining fire alarm and suppression systems, using temporary construction partitions, increasing hazard surveillance, and conducting additional fire drills. The evaluation was completed on 2/22/24 and includes a description of the specific ILSM measures to be implemented and maintained throughout the project.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Interim Life Safety Measures (ILSM) Evaluation Attachment A

ILSM No. Date:

Project No.

Project Title:

The following ILSM will be evaluated individually and initiated as needed to compensate for hazardous conditions as a result of construction or existing significant life safety code deficiencies. ILSM implementation will be documented on Attachment A-2.

1. Please provide summary of work to be completed in the space provided below:

2. Ensuring free and unobstructed exits. Buildings or areas under construction must maintain escape routes at all times for all occupants including construction workers. Affected personnel will be trained on any designated alternate exits. Exits in construction areas will be inspected daily.

Will any exit paths (means of egress) be obstructed or compromised? Yes No N/A

NOTE: All contracted construction projects shall have this specified as descried in the VA Master Construction

Specification Section 01 00 00, Part 1.5.G & H, Means of Egress and Egress Routes, respectively.

3. Ensuring that fire alarm, detection and suppression systems are in good working order. A temporary, equivalent system will be provided when any fire system is impaired. Temporary systems will be inspected and tested monthly and results recorded.

Will any fire system(s) be impaired? Yes No N/A

NOTE: All contracted construction projects shall have this specified as described in the VA Master Construction

Specification Section 01 00 00, Part 1.5.L, M & N, Sprinklers, Existing Fire Protection and Smoke Detectors, respectively.

4. Providing additional fire-fighting equipment.

Does the affected area warrant placement of additional fire protection equipment? Yes No N/A

NOTE: All contracted construction projects shall have this specified as described in the VA Master Construction

Specification Section 01 00 00, Part 1.5.I, Fire Extinguishers.

5. Ensuring that temporary construction partitions are smoke tight and built of noncombustible or limited combustible materials that will not contribute to the development or spread of fire.

Will construction involve the use of temporary partitions? Yes No N/A

NOTE: All contracted construction projects shall have this specified as descried in the VA Master Construction

Specification Section 01 00 00, Part 1.5.E, Temporary Construction Partitions.

Interim Life Safety Measures (ILSM) Evaluation

6. Increasing hazard surveillance of buildings, grounds, and equipment with special attention to excavations, construction areas, construction storage, and field offices.

Does project/deficiency present added hazards, such as: excavations; construction Yes No N/A storage; or field offices, which warrant increased hazard surveillance?

NOTE: All contracted construction projects shall have this specified as descried in the VA Master Construction

Specification Section 01 00 00, Part 1.5.J & P, Flammable and Combustible Liquids and Fire Hazard Prevention and Safety

Inspections, respectively.

7. Developing and enforcing storage, housekeeping, and debris removal practices that reduce the flammable and combustible fire load of the building to the lowest feasible level.

Does project/deficiency involve the storage of flammable/combustible materials? Yes No N/A

NOTE: All contracted construction projects shall have this specified as descried in the VA Master Construction

Specification Section 01 00 00, Part 1.5.J, Flammable and Combustible Liquids.

8. Providing additional training to those who work in the hospital on the use of firefighting equipment.

Does project/deficiency warrant additional training on use of firefighting equipment? Yes No N/A

9. Conducting one additional fire drill per shift per quarter. The Project Engineer/COR will inform the Safety Manager of the need to conduct more fire drills. The Safety Manager/Specialist will assume responsibility for completing the drills.

Does project/deficiency warrant additional fire drills? Yes No N/A

10. Inspecting and testing of temporary systems monthly. The completion date of the tests shall be documented.

Will project/deficiency require installation of temporary systems? Yes No N/A

NOTE: All contracted construction projects shall have this specified as descried in the VA Master Construction

Specification Section 01 00 00, Part 1.5.F & N, Temporary Heating and Electrical and Smoke Detectors, respectively.

11. Training staff to compensate for impaired structural or compartmentalization features of fire safety.

Will project/deficiency affect structural or compartmental fire safety features? Yes No N/A

12. Conducting organization-wide or specific to affected area occupants safety education programs to promote awareness of any life safety building deficiencies, construction hazards, and ILSM.

Does project/deficiency present Life Safety Code deficiencies or construction hazards, Yes No N/A which warrant facility-wide education of personnel concerning these Interim Life Safety Measures?

ILSM Evaluation completed by: ___________________________________________ Date: _______________

Additional Notes/Comments:

Interim Life Safety Measures (ILSM) Attachment B

ILSM No. Date:

Project No.

Project Title:

Description of Interim Life Safety Measures to be Implemented and Maintained:

Instructions: Based on the responses to the evaluation questions, provide a description of the Interim Life Safety Measures that will be implemented during the project to compensate for the deficiency or condition. Form to be posted at entrances to project areas.

Signatures required as indicated below. Completed form will be maintained in the Safety and Project files.

Issued by:

Safety Manager: ___________________________________________ Date: _______________

ILSM_No: 504-24-009
Date: 02/09/2024
Project_No: 504-23-106
Project_Title: Renovate for Swing Space
Textfield: Renovate Swing Space involves installation of various walls/Drywall, Electrical, HVAC and Plumbing in Buildings 12 and 44 to create Swing Space. Demo Work is a minimal for this project.

This project will:

- Install Walls from Deck to Ceiling and install various Mechanical, Electrical and Plumbing lines in Building 12.

- Install Walls from Deck to Deck and install various Mechanical and Electrical in Building 44.

- Will Construct a new for Office Space / Mail Room and Storage Space for EMS and Mailroom.

- Will cause various shutdowns that will be localized to the area being worked on other than Fire Suppression updates as needed.

2_Ensuring_free_and_unobstructed_exits_Buildings_o: Yes
3_Ensuring_that_fire_alarm_detection_and_suppressi: Yes
RadioButton: Yes
5_Ensuring_that_temporary_construction_partitions: Yes
6_Increasing_hazard_surveillance_of_buildings_grou: Yes
7_Developing_and_enforcing_storage_housekeeping_an: Yes
Does_projectdeficiency_warrant_additional_training: Yes
9_Conducting_one_additional_fire_drill_per_shift_p: Yes
10_Inspecting_and_testing_of_temporary_systems_mon: Yes
RadioButton0: Yes
12_Conducting_organizationwide_or_specific_to_affe: Yes
Date0: 09/20/2022
2024-04-29T08:53:31-0500
LANCE DEWITT

Textfield0: Standard ILSM Requirements:

- ILSM #1. Prompt notification to the Amarillo fire department and Allstate Security and initiation of a fire watch in the event a fire alarm is out of service 4 hours in a 24 hour period OR sprinkler system is out of service more than 10 hours in a 24 hour period in an occupied building. Notification and fire watch times are documented.

NOTE: If proper separation and ILSM is appropriately implemented, it is considered that no parties are left unprotected by the renovation. Therefore, neither a fire watch or evacuation is required.

- ILSM #2 If egress paths and/or exits are effected, signage identifying location of alternative exits must be posted for everyone effected.

- ILMS #3. Contractors will cooperate with facility Safety staff (e.g., Construction Safety Specialist) during daily and routine inspections. Additionally, all deficiencies noted must be corrected within the same business day or have an action plan approved by the COR and AVAHCS Safety Officer.

Life Safety Deficiencies as a Result of Construction Activities:

Life Safety Deficiencies as a Result of Construction Activities:

ILSM 1- Will any exit paths (means of egress) be obstructed or compromised? During construction exit paths will be not be blocked a) If egress paths and/or exits are effected, signage identifying location of alternative exits must be posted for everyone effected.

ILSM 2- Will construction involve the use of temporary partitions? At this time no actions are scheduled that are expected to generate dust. If the barriers are erected they will not block any signage or exits.

ILSM 3- Does project/deficiency present Life Safety Code deficiencies or construction hazards, which warrant facility-wide education of personnel concerning these Interim Life Safety Measures? No.

Date4: 2/22/24
2024-02-22T16:00:40-0600
LANCE DEWITT
Textfield1:
Button1: