Attachment 4 - 171 - Weed and Disease Prevention.pdf
PDF 265 KB Posted
- Attached to
- Reeder View Pit Crushing Federal contract opportunity
- Solicitation number
- 1240LS21Q4005
- Issued by
- Department of Agriculture Forest Service
About this file
This document includes a federal contract solicitation for pit development and crushing services. The United States Forest Service is seeking offers for a firm-fixed price contract to develop a pit, crush up to 11,500 cubic yards of aggregate, and place it in stockpiles within or near the Reeder View Pit location approximately 17 miles northwest of Orangeville, Utah. The solicitation is a streamlined notice in accordance with FAR Subpart 12.6 and interested offerors must have an active System for Award Management registration by the time quotes are due to be eligible for award. Quotes not from contractors registered in SAM will not be considered. The base work includes pit development and crushing 11,500 cubic yards with options to crush additional quantities up to 13,500 cubic yards total. The work must be performed in accordance with FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and aggregates must meet specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ 1240LS21Q4005 - Reeder View Pit Crushing.pdf | ||
| Attachment 3 - WD UT20210052.pdf | ||
| Attachment 5 - FSSS All Assembled.pdf | ||
| Attachment 6 - FSSS Section 314.pdf | ||
| Attachment 1 - Schedule of Items.xls | XLS spreadsheet | |
| Attachment 2 - Reeder View Pit Crushing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
171 - Weed and Disease Prevention
Description
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands and prior to leaving National Forest System lands.
Material
171.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at an approved facility. Provide the CO with an opportunity to inspect the equipment prior to loading or unloading from a trailer.
171.04 Equipment. Use a high pressure washing system.
For work at a commercial washing facility, use an approved facility.
171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment.
Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment.
Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
Measurement
171.08 Do not measure weed prevention for payment.
Payment
171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.
File details come from the government source that posted it. Updated .