About this file
This document consists of an attachment and solicitation related to a federal contract opportunity for pit crushing services. The attachment provides specifications for crushing up to 11,500 cubic yards of aggregate material at the Reeder View Pit located approximately 17 miles northwest of Orangeville, Utah. Work must be completed in accordance with FP-14 standard specifications and is to include pit development, crushing services, and stockpiling of aggregate. The base option is for crushing an additional 5,500 cubic yards with options to increase the quantity up to an additional 3,000 cubic yards. The projected contract value ranges from $100,000 to $250,000. Interested offerors are to submit quotes in response to solicitation number 1240LS21Q4005 issued by the US Department of Agriculture Forest Service. The performance period is 40 calendar days beginning October 1, 2021 or March 2022 depending on weather conditions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ 1240LS21Q4005 - Reeder View Pit Crushing.pdf | ||
| Attachment 3 - WD UT20210052.pdf | ||
| Attachment 4 - 171 - Weed and Disease Prevention.pdf | ||
| Attachment 5 - FSSS All Assembled.pdf | ||
| Attachment 6 - FSSS Section 314.pdf | ||
| Attachment 1 - Schedule of Items.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C 1
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Reeder View Pit Crushing
C1 SCOPE OF CONTRACT
This project consists of pit development, crushing up to 11,500 CY (Cubic Yards) of Spec Aggregate and placing it in stockpiles within the or near the pit location. Material will be taken in even layers across entire areas within the pit boundary as marked on ground by the Forest Service. The work shall be in accordance with the FP-14 “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects”. Aggregate will conform to Table 703-3 of FSSS Section 314.
The intent of the contract is to provide for the complete construction of the project described in the contract.
Unless otherwise provided, the contractor is to furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in reasonably close conformity with the drawings and specifications, and in accordance with the provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown in the Schedule.
Base Option is for the crushing of an additional 5,500 CY
Option 1 is for the crushing of up to an additional 1,000 CY Option 2 is for the crushing of up to an additional 2000 CY Option 3 is for the crushing of up to an additional 3,000 CY
C2 PROJECT LOCATION
Project is located approximately 17 miles northwest of Orangeville, Utah. You can access the Reeder View Pit from Orangeville by traveling west on Highway 29 up Straight Canyon to the intersection with Forest road 50014 Miller Flat Rd, then North approximately 0.7 miles on 50014 Miller Flat Rd to the pit. Pit is located just East of 50014 Miller Flat Rd.
C3 SITE INFORMATION AND LIMITATIONS
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
(a) Utilities are not available at the site for construction purposes.
(b) No fuel storage on site is permitted. Fuel trucks must be equipped with spill containment kits and portable berms that meet all state and federal regulations. A spill containment plan must be submitted and approved prior to construction.
(c) All construction equipment shall be pressure washed before entering the Site in compliance with the specifications. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. The contractor shall notify the
SECTION C 2
Contracting Officer 48 hours in advance of mobilizing equipment to the site to arrange an inspection and meet the requirements of FSSS 171 Weed Prevention.
(d) The contractor will be able to utilize the Forest Service Roads; however, the Contractor will be responsible for any damage to the roads due to construction activities. The contractor shall be responsible for obtaining permission to use all other roads and staging areas.
C4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Bid Schedule.
C5 WORK CAMPS, STAGING AND STORAGE AREAS
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.
C6 INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions, including unclassified material for excavation, that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
C7 START DATE
October 01, 2021 or March 2022 depending on snow.
C8 CONTRACT TIME
40 Calendar days base option
C9 SPECIFICATIONS
The Forest Service, US Department of agriculture has adopted FP-14 - “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” from “U.S. Department of Transportation” Federal Highway Administration for construction of National Forest System Roads. The FP-14 is available for downloading at the following URL: https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf