This federal contract solicitation seeks design-build services for infrastructure upgrades at the McClellan VA Medical Center in Sacramento, California. The selected contractor will provide design, construction, and commissioning services to upgrade 19 telecommunications rooms and one data center to current VA EHRM IT standards. Upgrades include installing new data cabling, fiber backbone, low-voltage systems, power and grounding, HVAC, and finishes. Some spaces will be relocated or expanded. The contractor will also extend utilities to a temporary training trailer area and remove abandoned legacy equipment. The solicitation is for the Department of Veterans Affairs Technology Acquisition Center Austin. The contractor must complete all work while maintaining operational IT services.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VISN 21 CM/PM Electronic Health
Records Modernization (EHRM) PHASE I Support Task
PO# 612C209
Northern California Health Care System Sacramento VA Medical Center
McClel lan Clinic
Ta b l e o f C o n t e n t s
Project TeamContributors
Vicinity Map/Building Addresses
Mather Campus Map/Building Information
McClellan Campus Map / Building Information
Site Infrastructure
VAMC Sacramento Fiber Distances
VAMC McClellan Fiber Distances
Door Security Requirements
Sacramento VAMC – Bldg. 645
First Floor Plan
Second Floor Plan
Sacramento VAMC – Bldg. 646
First Floor Plan
Second Floor Plan
Sacramento VAMC – Bldg. 647
First Floor Plan
Sacramento VAMC – Bldg. 649
Second Floor Plan
Sacramento VAMC – Bldg. 650
First Floor Plan – Area B
First Floor Plan – Area C
First Floor Plan – Area E
Second Floor Plan
Third Floor Plan
Sacramento VAMC – Bldg. 651
First Floor Plan
Sacramento VAMC – Bldg. 652
First Floor Plan
Sacramento VAMC – Bldg. 700
First Floor Plan
Second Floor Plan
Third Floor Plan
Fourth Floor Plan
Fifth Floor Plan
Sacramento VAMC – Bldg. 707
First Floor Plan
Identification of Network Spaces:
Sacramento VAMC
Network Spaces: (cont’d)
Sacramento VAMC – Bldg. 720
First Floor Plan
Sacramento VAMC – Bldg. 722
First Floor Plan
Sacramento VAMC – Bldg. 722A
First Floor Plan
Sacramento VAMC – Bldg. 726
First Floor Plan
Sacramento VAMC – Bldg. 727
First Floor Plan
Sacramento VAMC – Bldg. 728
First Floor Plan
Sacramento VAMC – Bldg. 730
First Floor Plan
Sacramento VAMC – Bldg. 798
First Floor Plan
Sacramento VAMC – Bldg. 799
First Floor Plan
Sacramento VAMC – Bldg. 800
First Floor Plan
Sacramento VAMC – Bldg. T8
First Floor Plan
McClellan OPC – Bldg. 29
First Floor Plan
McClellan OPC – Bldg. 88
First Floor Plan
McClellan OPC – Bldg. 98
First Floor Plan
Second Floor Plan
Identification of Network Spaces:
McClellan
VHAMACGomezM Text Box **** This package is for McClellan only. Ignore Information about Mather.
Ta b l e o f C o n t e n t s
Network Spaces: (cont’d)
Network Space Design: Sacramento
McClellan OPC – Bldg. 209
Basement
First Floor Plan
Second Floor Plan
McClellan OPC – Bldg. 949
Second Floor Plan
Bldg. 645:
Design Matrix
Enlarged Plan – Existing
Bldg. 646:
Design Matrix
Enlarged Plan - Existing
Bldg. 646:
Design Matrix
Enlarged Plan – Existing
Bldg. 649:
B203 and B205
Design Matrix
Enlarged Plan – Existing
Bldg. 650:
1A026
Design Matrix
Enlarged Plan – Existing
Bldg. 650:
1B235
Design Matrix
Enlarged Plan – Existing
Bldg. 650:
1C302
Design Matrix
Enlarged Plan – Existing
Bldg. 650:
1C900
Design Matrix
Enlarged Plan – Existing
Bldg. 650:
1E272
Design Matrix
Enlarged Plan – Existing
Bldg. 650:
2B005
Design Matrix
Enlarged Plan – Existing
Bldg. 650:
3B002
Design Matrix
Enlarged Plan – Existing
Bldg. 651:
Design Matrix
Enlarged Plan – Existing
Bldg. 652:
Design Matrix
Enlarged Plan – Existing
Bldg. 700:
1A220
Design Matrix
Enlarged Plan – Existing
Bldg. 700:
A113
Design Matrix
Enlarged Plan – Existing
Bldg. 700:
1B111
Design Matrix
Enlarged Plan – Existing
Bldg. 700:
2A112
Design Matrix
Enlarged Plan – Existing
Bldg. 700:
3A102
Design Matrix
Enlarged Plan – Existing
Bldg. 700:
4A012
Design Matrix
Enlarged Plan - Existing
Bldg. 700:
5A102
Design Matrix
Enlarged Plan – Existing
Bldg. 707:
Design Matrix
Enlarged Plan – Existing
Bldg. 720:
23A
Design Matrix
Enlarged Plan – Existing
Bldg. 726:
Design Matrix
Enlarged Plan – Existing
Bldg. 727:
Design Matrix
Enlarged Plan – Existing
Bldg. 728:
100A
Design Matrix
Enlarged Plan – Existing
Bldg. 730:
Cabinet
Design Matrix
Enlarged Plan – Existing
Bldg. 798:
Design Matrix
Enlarged Plan – Existing
Bldg. 799:
206A
Design Matrix
Enlarged Plan – Existing
Bldg. 800:
Design Matrix
Enlarged Plan - Existing
Bldg. T8:
Design Matrix
Enlarged Plan - Existing
Bldg. 29:
Design Matrix
Enlarged Plan – Existing
Bldg. 88:
1C05
Design Matrix
Enlarged Plan – Existing
Bldg. 98:
New IT Room
Design Matrix
Enlarged Plan – New Construction
Bldg. 98:
2S09B
Design Matrix
Enlarged Plan – Existing
Bldg. 209:
Design Matrix
Enlarged Plan – Existing
Bldg. 209:
Design Matrix
Enlarged Plan – Existing
Bldg. 209:
Design Matrix
Enlarged Plan – Existing
Bldg. 949:
217A
Design Matrix
Enlarged Plan – Existing
Network Space Design (cont’d)
Ta b l e o f C o n t e n t s
Network Space Design: McClellan
Appendix A – Power Installation Example
Appendix B – Compliance Requirements
Appendix C – Rack Labeling Standard
Appendix
P R O J E C T C O N TA C T D I R E C T O R Y
Concourse Federal Group
123 S. Royal Street Alexandria, Virginia 22314
Tim Hower, Project Manager ........................................................................................thower@concousefederal.com
Lorena Alvarez................................................................................................................IaIvarez@concousefederaI.com
Mike Olson ................................................................................................................... molson@concousefederal.com
Marshall Contino, Concourse A|E Vice President ....................................................... mcontino@concousefederal.com
DHE Engineering 3300 N. Central Ave. 3300 Tower Suite, 1520, Phoenix, AZ 85012
Jasper Lim, Electrical Engineer..................................................................................... jlim@dheeng.com
Kory Young, EIT, Senior Mechanical Engineer................................................................kyoung@dheeng.com
VA Northern California Health Care System
Travis Dilts (Sacramento, Chief Engineer)…………………………………………………………………Travis.Dilts2@va.gov
Jonathan Bassignani (Sacramento, Chief of Projects)……………………………………………….Jonathan.Bassignani@va.gov
V i c i n i t y M a p B u i l d i n g A d d r e s s e s
S a c r a m e n t o V A M e d i c a l C e n t e r 1 0 5 3 5 H o s p i t a l W a y M a t h e r , C A 9 5 6 5 5
M c C l e l l a n O u t p a t i e n t C l i n i c 5 3 4 2 D u d l e y B o u l e v a r d B u i l d i n g 8 8 M c C l e l l a n P a r k , C A 9 5 6 5 2
VHAMACGomezM Polygon
VHAMACGomezM
M a t h e r B u i l d i n g I n f o r m a t i o n
Bldg. # Bldg. Name
Data
Ctr Levels
650 Clinics and Administration 1 3
M a t h e r C a m p u s M a p
Bldg. # Bldg. Name TR Qty Levels
645 Outpatient GI 1 2
646 Clinics and Administration 2 2
647 ACS Specialty Clinic 0 2
649 Mental Health 1 2
650 Clinics and Administration 6 3
651 Mental Health 1 1
652 Warehouse 1 2
700 Inpatient Bed Tower 7 5
707 HRMS 1 1
720 Eye Clinic 1 1
722 ENT and Speech Pathology (Served by 720) 0 1
722A Lab 0 1
726 Clinics and Administration 1 1
727 OIF/OEF/OND Rehab 1 1
728 Center for Rehab Medicine 1 1
730 Engineering Shops 1 1
798 LMS 1 1
799 Police 1 1
800 Social Services 1 1
T-8 Medical Swing Space 1 1
VHAMACGomezM
M c C l e l l a n B u i l d i n g I n f o r m a t i o n
Bldg. # Bldg. Name TR Qty Levels
29 Warehouse 1 1
88 McClellan Dental 1 1
98 McClellan 2 2
209 Renovated Building 209 3 3
949 Mental Health and Education Building 1 3
M c C l e l l a n C a m p u s M a p
SITE INFRASTRUCTURE
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
CREATE REDUNDANT WAN PATH – ASSUME 1670’-0”
CONCRETE ENCASED 4” PVC OR HDPE WITH (4) 1” INTERDUCTS.
VANCHS EHRM Power and Data For Temporary Training
Trailers (Trailers provided by follow-on project)
Power
Provide 350A 480/277V panel, 225kVA transformer, 800A 208/120V panel.
(350A 480/277V panel powered from main switchboard in the vicinity of building 702.)
Provide 1 set of (4) 250kcmil and (1) #4 ground in 2-1/2” EMT Conduit in trench from building 702 to new 350A 480/277V panel. Approximate run of feeders are estimated to be 2200ft.
Data/Fiber
Provide temporary IDF in new temporary trailer area with racks as required and Light Interface Units (LIU) as required.
Provide minimum 12 strand single mode OM2 fiber to new IDF in new temporary trailer location from closest IDF with enough fiber capacity.
If no capacity available, run fiber from existing server room approximately 2750ft away in EMT in trench.
GENERAL AREA FOR INSTALLATION OF THE TEMP POWER & DATA)
EXACT LOCATION TO BE COORDINATED WITH OWNER DURING
DESIGN.
** See Appendix D for More Information
VAMC FIBER DISTANCES
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
CREATE REDUNDANT WAN PATH – ASSUME 1670’-0”
CONCRETE ENCASED 4” PVC OR HDPE WITH (4) 1” INTERDUCTS
VAMC SACRAMENTO (MATHER)
Building Floor Room
Distance (Ft.) from Fiber Hub
Fiber Type Notes
Interior - 4" EMT
Exterior –Fiber to be pulled through existing duct loop.
(Intent is to feed each building from two (2) directions around the loop)
645 2 221 220 4120 24 strand singlemode
646 1 1031 250 4120 24 strand singlemode
646 2 2028 275 4120 24 strand singlemode
649 2 B203/B205 300 4120 24 strand singlemode
650 1 1B235 250 24 strand singlemode
650 1 MDF 1A026 275 24 strand multimode
650 1 1C900 300 24 strand multimode
650 1 1C302 325 24 strand multimode
650 1 1E272 Server Room
650 2 2B005 350 24 strand multimode
650 3 3B002 375 24 strand multimode
651 1 115 200 4120 24 strand multimode
652 1 105 200 4120 24 strand multimode
700 1 A113 200 4120 24 strand multimode
700 1 1A220 225 4120 24 strand multimode
700 1 1B111 250 4120 24 strand multimode
700 2 2A112 275 4120 24 strand multimode
700 3 3A012 300 4120 24 strand multimode
700 4 4A012 325 4120 24 strand multimode
700 5 5A012 350 4120 24 strand singlemode
707 1 119 200 4120 24 strand singlemode
720 1 23A 200 4920 24 strand singlemode
726 1 103 200 4120 24 strand singlemode
727 1 122 200 4120 24 strand singlemode
728 1 100A 200 4120 24 strand singlemode
730 1 IT Cabinet 200 4670 24 strand singlemode
731 1 200 4670 24 strand singlemode
798 1 104 200 4120 24 strand singlemode
799 1 206A 200 4200 24 strand singlemode
800 1 114 200 4200 24 strand singlemode
T8 1 141 200 4120 24 strand singlemode
VAMC FIBER DISTANCES
SACREMENTO VAMC (McCLELLAN)
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
VAMC SACRAMENTO (McCLELLAN)
Building Floor Room
Distance (Ft.) from Fiber Hub
Fiber Type Notes
Interior - 4" EMT
Exterior -Concrete
Encased 4" PVC or
HDPE with (4) 1"
Interducts
98 1 2S098 250 2000 24 strand singlemode
98 1 New IT Room 300 2000 24 strand singlemode
98 2 2S13A 325 2000 24 strand singlemode
209 BASEMENT 20 250 24 strand multimode
209 1 119 300 24 strand multimode
209 2 214 350 24 strand multimode
DOOR SECURITY REQUIREMENTS
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
I D E N T I F I C AT I O N O F N E T WO R K S PAC E S – M AT H E R
BLDG: 6 4 5
LEVEL: 1
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
N
EXISTING IT ROOM 114
RELOCATE TO 2ND FL
ROOM 221
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
• PROVIDE NEW DROP-IN CEILING
• PROVIDE NEW LIGHTING
LEVEL: 2
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
REMEDIATE IN PLACE
OI&T
ROOM 221
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
BLDG: 6 4 6
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
REMEDIATE IN PLACE
IT
ROOM 1031
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
REMEDIATE IN PLACE
IT
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 6 4 7
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
N
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
EXISTING IT ROOM A216
RELOCATE TO BLDG. 649
ROOM B205
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
BLDG: 6 4 9
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
N
EXPAND IN PLACE
IT
ROOM B203
EXPAND INTO
ROOM B205
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
BLDG: 650
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
REMEDIATE IN PLACE
MDF
ROOM 1A026
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
ROOM 1B235
ROOM 1.5 WILL RELOCATE
TO 1B235
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXPAND IN PLACE
IT
ROOM 1C900
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
ROOM 1C302
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
SERVER
ROOM 1E272
RELOCATE DATA CABLING TO IT ROOM 1A026
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 6 5 0
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
REMEDIATE IN PLACE
IT
ROOM 2B005
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
LEVEL: 3
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
REMEDIATE IN PLACE
IT
ROOM 3B002
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 6 5 1
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
REMEDIATE IN PLACE
IT
ROOM 115
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 6 5 2
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
REMEDIATE IN PLACE
IT
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
ABANDON MEZZANINE RACK.
RELOCATE TO IT ROOM 105
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 0 0
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
EXPAND IN PLACE
IT
1A220
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
1B111
REMEDIATE IN PLACE
IT
A113
(LOCATED IN NEW CATH LAB AREA)
N
IT
1A526
RELOCATE TO DATA CENTER
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
REMEDIATE IN PLACE
IT
2A112
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
EXISTING IT
ROOM 2A317
RELOCATE TO 2A112
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
EXPAND IN PLACE
IT
3A012
N
NOTE:
EXPANSION WILL BE POSSIBLE AFTER
PHARMACY RELOCATES TO THE 5TH FLOOR.
IT ROOM 3A012 WILL SERVE BOTH 2ND AND
3RD FLOOR.
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
LEVEL: 4
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
4A012
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
LEVEL: 5
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
5A012
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 0 7
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 2 0
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT ROOM 49
TO RELOCATE TO ROOM 23A
(EXISTING BREAKROOM)
NEW BREAKROOM TO EXPAND INTO
EXISTING HALL
NEW IT ROOM
23A
EXISTING ELEC. RM WILL
TRADE PLACES WITH THE EXISTING
BREAKROOM
N
RELOCATE EXISTING
ELECTRICAL PANELS
TO EXTERIOR OF BUILDING.
NOTE:
BUILDING 720 WILL SERVE BUILDINGS 722, 722A AND 802.
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 2 2
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT ROOM 126
RELOCATE TO BLDG. 720
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
BLDG: 7 2 2 A
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
IT ROOM
RELOCATE TO BLDG. 720
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
BLDG: 7 2 6
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 2 7
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 2 8
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT/DATA
100A
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 3 0
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
CABINET
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 9 8
SCALE: 1/8” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
EXPAND IN PLACE
IT
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 7 9 9
SCALE: 3/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
206A
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 8 0 0
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
OI&T
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: T 8
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
SACRAMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
OI&T
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
I D E N T I F I C AT I O N O F N E T WO R K S PAC E S – M c C L E L L A N
BLDG: 2 9
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
McCLELLAN OUTPATIENT CLINIC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 8 8
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
McCLELLAN OUTPATIENT CLINIC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
EXPAND IN PLACE
(EXTERIOR EXPANSION)
IT
1C05
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 9 8
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
McCLELLAN OUTPATIENT CLINIC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
EXISTING IT ROOM 1B02A
RELOCATE TO NEW
TR ROOM, 1ST FLOOR
EXISTING SPACE TO BE USED FOR
LACTATION ROOM EXPANSION
EXISTING OI&T
ROOM 1A20B
RELOCATE TO 2S09B
EXISTING SPACE TO BE ADDITIONAL
STORAGE FOR WAREHOUSE USE
EXISTING IT
ROOM 1E09
RELOCATE TO NEW TR ROOM, 1ST
FLOOR
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
EXISTING IT
ROOM 1Z09
RELOCATE TO 2S09B
EXISTING SPACE TO BE USED
AS GENERAL STORAGE
REMEDIATE IN PLACE
NEW IT ROOM
123 SF
NOTE: NEW TR ROOM 2S098 TO SERVE
THE NORTH (PLAN NORTH) SIDE OF FLOOR.
THE NEW TR ROOM ON THE 1ST FL.
WILL SERVE THE SOUTH (PLAN SOUTH)
SIDE OF THE FLOOR
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
BLDG: 9 8
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
McCLELLAN OUTPATIENT CLINIC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
EXISTING IT
ROOM 2T09A
RELOCATE TO 2S09B
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
N
EXISTING OI&T
ROOM 2S13A
RELOCATE TO 2S09B
ROOM 2M20A TO BE USED
TO RUN CABLES TO THE
FIRST FLOOR
IT
2M20A
RELOCATE TO NEW TR ROOM,
LEVEL 1
EXISTING IT
ROOM 2M43
(NOT LISTED ON OCAMES)
RELOCATE TO NEW TR ROOM, LEVEL 1
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
NEW TR ROOM
2S09B
NOTE: NEW TR ROOM 2S098 TO SERVE
THE NORTH SIDE OF FLOOR.
THE NEW TR ROOM ON THE 1ST FL.
WILL SERVE THE SOUTH SIDE OF THE
FLOOR
EXISTING SPACE TO BE USED AS
GENERAL STORAGE
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
ROOMS TO EXPAND IN
PLACE
NOTE:
ALL ABANDONED TR ROOMS ARE TO BE
REPURPOSED AS GENERAL STORAGE OR AS
INDICATED ON FLOOR PLAN. MINIMUM
REQUIREMENTS FOR TR ROOMS TO BE
ABANDONED:
• REMOVE ALL IT EQUIPMENT
• SEAL ALL PENETRATIONS IN ACCORDANCE
WITH FIRE REQUIREMENTS
• PROVIDE NEW VCT FLOORING
• REMOVE EXISTING PLYWOOD ON WALLS,
PATCH, REPAIR AND PAINT WALLS
BLDG: 2 0 9
LEVEL: BASEMENT
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
McCLELLAN OUTPATIENT CLINIC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
(E)
IT ROOM
136 SF
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
McCLELLAN OUTPATIENT CLINIC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
(E)
COMM ROOM
85 SF
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
McCLELLAN OUTPATIENT CLINIC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
(E)
COMM ROOM
130 SF
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
BLDG: 9 4 9
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
EXISTING TR LOCATION(S)
McCLELLAN OUTPATIENT CLINIC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
EXPAND IN PLACE
IT
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
N E T WO R K S PAC E D E S I G N : SAC R A M E N TO VA M C
** See Appendix E for Excel PDF with Estimated data from initial investigation
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
OI&T
N
MATHER BLDG. 645 ROOM 221 ABSORBING RM 114, BLD 645
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat Wired thermostat
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
200 Approximate total cable length
= 33000'.
Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment Provide new rack as required.
X
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT
N
MATHER BLDG. 646 ROOM 1031
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
Lower temp set point of dedicated
HVAC unit. If temp issue is not corrected then replace with new 1.5 ton ductless split HVAC unit
Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery
Thermostat Wired thermostat
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD
Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment Provide new rack as required.
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
IT
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
N
MATHER BLDG. 646 ROOM 2028
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA
L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat Wired thermostat
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD
Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment
BLDG: 6 4 9
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
N
B203 & B205
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT ROOM B203
123 SF
REMOVE EXISTING
WALL BETWEEN
ROOM B203 AND
B205. EXPAND TR
ROOM B203
NEW WALL
ROOM B205
MATHER BLDG. 649 ROOM B205 ABSORBING ROOM A216 FROM BLD 647
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
X Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat Wired thermostat X
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
400. Approximate total cable length
= 66000'
X Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment Provide 5 new racks.
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
1A026
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT
1A026
Data cabling from 1E272 is
Being moved to this room.
MATHER BLDG. 650 ROOM 1A026 (MDF) UNSURVEYED
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA
L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
Insufficient Central UPS power backup.
Design Build contractor to determine size of Central UPS.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
X Missing Telecom Main Ground Bar
(TMGB)
Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in date canter.
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X Piping over equipment If water piping is overhead then relocate piping or add pipe trough
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X No redundant fiber optic cable feeds entering the building on opposite faces.
Install new as required
Remote Controlled battery thermostat Wired thermostat
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD'
X Micro condensate pump Commercial condensate pump Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment Provide new rack as required.
XXX
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
1B235
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT
1B235
NOTE: ROOM 1.5 WILL
RELOCATE TO 1B235
MATHER BLDG. 650 ROOM 1B235 ABSORBING ROOM 1.5
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
Absorbing room 1.5. Needs dedicated 1.5 ton ductless split
HVAC unit
X Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat
Wired thermostat X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
200 Approximate total cable length
= 33000'.
X Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
1C302
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMEDIATE IN PLACE
IT
ROOM 1C302IT
1C302
NOTE: REMOVE STORAGE SHELVING FROM IT ROOM
TO PROVIDE ADDITIONAL SPACE FOR CERNER RACKS
MATHER BLDG. 650 ROOM 1C302
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat Wired thermostat
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD
X Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment Provide 2 new racks.
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
1C900
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT
1C900
126 SF
REMOVE EXISTING
WALL BETWEEN
ROOM 1C900 AND
1C700A. EXPAND
IT ROOM INTO
1C700A
NEW WALL
RELOCATE
EXISTING DOOR.
INFILL OPENING.
PATCH AND
REPAIR AS
NEEDED
EXISTING OFFICE
1C700A
NEW DOOR
LOCATION.
REMOVE
PORTION OF
WALL FOR NEW
DOOR.
MATHER BLDG. 650 ROOM 1C900
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat Wired thermostat
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD
X Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new equipment Provide new rack.
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
1E272
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
SERVER
1E272
NOTE:
RELOCATE DATA
CABLING TO IT
ROOM 1A026
MATHER BLDG. 650 ROOM 1E-272
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA
L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Insufficient Central UPS power backup.
Design Build contractor to determine size of Central UPS.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
X Missing Telecom Main Ground Bar
(TMGB)
Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs three (3) new temperature monitoring sensors and humidity sensors per rack.
Provide controls from BMS
X Inadequate grounding connections to metal objects in date canter.
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
Piping over equipment Relocate piping or pipe trough
UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X No redundant fiber optic cable feeds entering the building on opposite faces.
Install new as required
Remote Controlled battery thermostat Wired thermostat
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD'
Micro condensate pump Commercial condensate pump Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment Provide new rack as required.
X
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
2B005
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT
2B005
MATHER BLDG. 650 ROOM 2B005
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat
Wired thermostat Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD
Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
3B002
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT
3B002
NOTE:.
REMOVE LEGACY PHONE SYSTEM
MATHER BLDG. 650 ROOM 3B002
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat
Wired thermostat Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD
X Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment
BLDG: 6 5 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
IT
MATHER BLDG. 651 ROOM 115
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
Cooling inadequate Needs dedicated 1.5 ton ductless split HVAC unit
X Insufficient redundant power connections for network equipment.
Provide 30A, 208V, 5 wire NEMA
L21-30R receptacle, from a normal power source, mounted near the equipment rack.
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from
BMS
Missing grounding bus bar Install copper grounding bus bar
X Rack Temperature/Humidity
Monitoring Inadequate
Rack needs one (1) new temperature monitoring sensors, humidity sensor, and controls from
BMS
X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X Piping over equipment Relocate piping or pipe trough X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X UPS Central Monitoring BACnet conversion X No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X No condensate leak detection Needs condensate leak detection
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
Remote Controlled battery thermostat Wired thermostat
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length
= TBD
Micro condensate pump Commercial condensate pump X Horizontal cable run not to exceed 292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment
BLDG: 6 5 2
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
SACREMENTO VAMC
NORTHERN CALIFORNIA HEALTH CARE SYSTEM
ELECTRICAL ROOM
NOTE: CABINET AT
MEZZANINE TO RELOCATE
TO ROOM 105
MATHER BLDG.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .