Attachment 3 - Temple Runoff Stations Dwgs 2 - Base.pdf

PDF 3 MB Posted

Attached to
Runoff Stations Concrete Repairs (Riesel, TX) Federal contract opportunity
Solicitation number
1232SA26Q0455
Issued by
Department of Agriculture Agricultural Research Service

About this file

This document is a set of engineering design drawings for runoff station rehabilitation and demolition work.

The drawings depict the location plan and detailed demolition and construction plans for multiple runoff stations (SW12, SW17, and W10) at a project site. Key work requirements include: demolition of existing wood floors with replacement by concrete slabs on grade; removal of existing structures at designated stations; installation of new concrete work and structural elements; and retention of existing outfall structures without demolition or new concrete retaining walls. The plans show both demolition phases and new work phases for each station, including plan views, sections, and elevation details. Accompanying photographs document current conditions at the stations. Sheet keynotes reference specific construction requirements and coordination needs, including notation that steel beam requirements must be coordinated with the Contracting Officer Representative and site staff. The drawings are dated December 22, 2023, and are prepared by STY engineering firm, indicating this is part of a formal construction project specification or contract package requiring contractor implementation of the detailed design shown.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12/22/23

BASE

BASE

BASE

RUNOFF STATION -

Aric.Abblitt Polygon

Aric.Abblitt Polygon

Aric.Abblitt Polygon

NOTE:

Outfall structure can remain as is. No demolition or new concrete retaining walls.

NOTE:

Outfall structure can remain as is. No demolition or new concrete retaining walls.

NOTE:

DEMO EXISTING WOOD FLOOR AND

REPLACE WITH CONCRETE SLAB ON GRADE,

SEE SECTION 2 / S4-107

RUNOFF STATION -

Aric.Abblitt Polygon

Aric.Abblitt Polygon

Aric.Abblitt Rectangle

Aric.Abblitt Rectangle

Aric.Abblitt Polygon

Aric.Abblitt Line

Aric.Abblitt Line

Outfall structure can remain as is.

No demolition or new concrete retaining walls.

NOTE:

Outfall structure can remain as is.

No demolition or new concrete retaining walls.

RUNOFF STATION -

Aric.Abblitt Polygon

Coordinate requirements realted to keynote D1 for steel beam with COR and site staff.

RUNOFF STATION -

Untitled