This Supplementary Statement of Work (SOW) details the requirements for manufacturing, delivering, and installing a new communications shelter for the USDA Forest Service at the Silver King site in the Lincoln Ranger District of Helena-Lewis & Clark National Forest. The project requires a PEPRO LLC CLP2 Dual Bay Micro shelter with a 20' integrated mast, specific equipment configurations including battery trays, ground bus bars, surge protection devices, and solar panel provisions, and must be designed to be deployed on unimproved land without excavation or foundations.

The contractor must deliver the shelter to Helena, MT at least 4 weeks before installation, with delivery and installation accomplished exclusively by helicopter due to site access limitations. The project also includes demolishing an existing 6'x6'x4' fiberglass shelter, weighing approximately 1000 lbs, with all debris disposal handled in compliance with environmental regulations. The shelter must meet TIA-222 standards, include a faraday cage, and be designed to support a Sinclair SD210 antenna, with all installation coordinated with Forest Service Land Mobile Radio staff.

View the file

Other files

File Type Posted
Attachment 2 - Performance Work Statement.pdf PDF
Competition Requirements_Redacted.pdf PDF
12760425Q0087.pdf PDF
Attachment 1 - Bill of Materials.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7.1 Supplementary Statement of Work (SOW)

The contractor must provide all materials and services for work required to complete the installation of a new communications shelter at Silver King. The site is located on the Lincoln Ranger District, Helena-Lewis & Clark National Forest at the following coordinates: Lat 47N 06’ 52.68” Long 112W 31’ 41.10”. The contractor will be required to obtain construction bonding and requisite insurance sufficient to support the construction and/or demolition, as applicable. The work provided by the contractor shall satisfy the following:

7.1.1 Shelter Design Requirements

A. The Manufacturer of the shelter shall comply with all applicable nationally recognized building and electrical codes.

B. The shelter shall be a PEPRO LLC. CLP2 Dual Bay Micro shelter with an integrated 20’ mast. The mast shall articulate to allow access to the antennas while in the horizontal position.

C. The shelter shall include the following equipment.

a. Standard CLP2 equipment racks in each bay

b. (2) Rack mounted battery trays, each capable of supporting (4) Deka

12AVR100ET AGM batteries

c. (1) Rack mounted bus bar

d. (1) Main Ground Bus bar (MGB) installed below the RF entry panel

e. (1) Filtered DC entry port tied to the faraday cage

f. (1) Surge protection devices (SPD) for solar array connections, SPDs shall be rated for a 12VDC Solar array

g. (2) Passive ventilation ports that include hoods, louvers, and screens to prevent insects from entering the shelter

h. Previsions to mount solar panels to the south face of the shelter

i. Solar panel mounts designed to work with the building attachment points

j. The doors shall be installed on the East and West faces of the shelter

k. The integrated mast shall be attached to the North side of the shelter

l. The manufacturer shall provide (1) 4” mount to attach (1) Sinclair SD210 antenna to the mast at the following heights: 20’.

m. The manufacturer shall provide (1) 4” JVJ

D. The shelter design shall include a faraday cage to protect the equipment from transient voltage spikes

E. The shelter shall include an RF entry panel with 3 ports, the appropriate quantity of boots and cushion inserts to support (1) LMR 400 cable. The RF entry port, boots, and cushion inserts shall be integrated into the faraday cage. The remaining unused RF entry ports shall be capped with covers that are integrated into the faraday cage.

F. The shelter design shall be such that it can be deployed on bare unimproved land without the need for excavation or foundation construction.

G. The shelter shall be grounded through Ufer pads placed on native surface; due to the no ground disturbance requirements a traditional ground system cannot be part of the solution.

H. The shelter shall be anchored to the land without the use of guy wires or stakes.

I. The shelter and mast system shall be designed on a site-specific basis and must comply with the current version of TIA-222. The mast system shall be designed to support the following antennas and feedlines:

a. Sinclair SD210, 20’, feedline LMR 400, 4” standoff, USFS J. The contractor shall also reference the provided PWS, BOM, Shelter Request Form, and this document for design details.

7.1.2 Shelter Delivery and Installation

A. Prior to installation the shelter shall be delivered to:

2130 Phoenix Ave.

Helena, Mt. 59602

B. The shelter shall be delivered at a minimum of 4 weeks prior to installation.

C. The contractor shall schedule and provide the means to safely offload the shelter at the delivery location.

D. The contractor shall schedule, coordinate, and install the new shelter at the Silver King communication site.

E. Access to the Silver King communications site is by helicopter only. The site cannot be accessed by road or ATV. The contractor shall coordinate all logistics and planning for helicopter installation and backhaul.

F. The shelter shall be installed in the location marked out on the ground by the Forest Service Land Mobile Radio staff.

7.1.3 Demolition of Existing Shelter

A. The contractor shall demolish and dispose of (1) 6’x6’x4’ fiberglass shelter, approximate weight is 1000lbs.

B. The removal of the existing telecommunications shelter will be done in a way that no damage will occur to remaining structures/equipment.

C. Any damage caused by the removal of the structure will be the responsibility of the contractor to repair.

D. Disposal of all demolition debris is the responsibility of the contractor and shall be discarded in accordance with state, federal environmental regulations as applicable.

7.1 Supplementary Statement of Work (SOW)
a. Sinclair SD210, 20’, feedline LMR 400, 4” standoff, USFS
J. The contractor shall also reference the provided PWS, BOM, Shelter Request Form, and this document for design details.
7.1.2 Shelter Delivery and Installation
A. Prior to installation the shelter shall be delivered to:
2130 Phoenix Ave.
Helena, Mt. 59602
B. The shelter shall be delivered at a minimum of 4 weeks prior to installation.
C. The contractor shall schedule and provide the means to safely offload the shelter at the delivery location.
D. The contractor shall schedule, coordinate, and install the new shelter at the Silver King communication site.
E. Access to the Silver King communications site is by helicopter only. The site cannot be accessed by road or ATV. The contractor shall coordinate all logistics and planning for helicopter installation and backhaul.
F. The shelter shall be installed in the location marked out on the ground by the Forest Service Land Mobile Radio staff.
7.1.3 Demolition of Existing Shelter