Statement of Work Summary

This Statement of Work describes a trail reconstruction and improvement project at Grout Pond Campground involving approximately 4,200 feet of the Pond Loop Trail. The base bid scope includes construction of 275 feet of new aggregate surface trail, restoration and resurfacing of 3,700 feet of existing trail, reconstruction of 500 feet of trail turnpiking, and installation of a 7'x14' glulam deck bridge.

The contract includes four optional bid items contingent on funding availability. Bid Option A encompasses construction of a 17-step overlapping stone staircase approximately 50 feet in length. Bid Option B covers construction of access routes to campsites 1, 2, and 3 and privy 1, with obliteration of existing access routes. Bid Option C includes construction of access routes to campsites 4, 5, 6, and 8 and privy 2, including obliteration of existing routes. Bid Option D covers construction of access routes to campsites 9, 10, and 11 and privy 3, with obliteration of existing access routes.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work This project entails the reconstruction of approximately 4,200 feet of the Pond Loop Trail at Grout Pond Campground, and option items to construct improved access routes to existing campsites and privies.

The base bid includes but is not limited to the following tasks:

• construction of 275 feet of new aggregate surface trail,

• restoration and resurfacing of 3,700 feet of existing trail,

• reconstruction of 500 feet of trail turnpiking, and

• installation of a 7'x14' glulam deck bridge.

Bid option items will be awarded depending on the availability of funding. The option items are as follows:

Bid Option A

· construction of 17-step overlapping stone staircase, approximate length of 50ft.

Bid Option B

· construction of access routes to campsites 1, 2, and 3, and privy 1.

· obliteration of existing access routes

Bid Option C

· construction of access routes to campsites 4, 5, 6, and 8, and privy 2.

Bid Option D

· construction of access routes to campsites 9, 10, 11, and privy 3.